[1] Varadharajan, T. K., Rajendran, C., A multiobjective
simulated-annealing algorithm for
scheduling in flowshops to minimize the
makespan and total flow time of jobs,
European Journal of Operational Research
167 772–795(2005).
[2] Edis, R. S., Ornek A., Simulation analysis of
lot streaming in job shops with
transportation queue disciplines, Simulation
Modelling Practice and Theory, 17 442–453
(2009).
[3] Mahdavi I., Shirazi B., and Solimanpur M.,
Development of a simulation-based decision
support system for controlling stochastic
flexible job shop manufacturing systems.
Simulation Modelling Practice and Theory,
18 768–786 (2010).
[4] Justin, B., Royce, O., Fred, G., Future of
simulation optimization. In: Proceedings of
the Winter Simulation Conference, Atlanta,
1466–1469 (2001).
[5] Appelqvist, P., and Lehtonen, J–M..
Combining optimisation and simulation for
steel production scheduling. Journal of
Manufacturing Technology Management, 16
(2) 197-210 (2005).
[6] Thompson, M. B., The Marriage between
Simulation & Real-time Control. APICS -
The performance advantage, 8 43-46 (1993).
[7] Yoon, H. J., and Shen, W., Simulation-based
real-time decision making for manufacturing
automation systems: a review. International
Journal of Manufacturing Technology and
Management, 8 (1) 188–202 (2006).
[8] Kadar, B., Pfeiffer, A., and Monostori, L.,
Discrete event simulation for supporting
production planning and scheduling
decisions in digital factories. Proceedings of
the 37th CIRP International Seminar on
Manufacturing Systems; Digital enterprises,
production networks, Budapest, Hungary,
444-448 (2004).
[9] Hindle, K., and Duffin, M., Simul8-planner
for Composites Manufacturing. Proceedings
of the Winter Simulation Conference,
(2006).
[10] Vasudevan, K. K., Lote, R., Williams, E. J.
and Ulgen, O., Iterative Use Of Simulation
And Scheduling Methodologies To Improve
Productivity. Proceedings of the 2008
Winter Simulation Conference, (2008).
[11] Appelqvist, P. and Lehtonen, J–M.,
Combining optimisation and simulation for
steel production scheduling. Journal of
Manufacturing Technology Management, 16
(2) 197-210 (2005).
[12] Anglani, A., Grieco, A., Pacella, M., Tolio
T., Object-oriented modelling and
simulation of flexible manufacturing
systems: a rule-based procedure, Simulation
Modelling Practice and Theory, 10 209–234
(2002).
[13] Andriansyah, R., Van Woensel T., Cruz,
F.R.B., and Duczmal, L. Performance
optimization of open zero-buffer multiserver
queueing networks, Computers &
Operations Research, 37 (8) 1472–1487
(2010).
[14] Azadeh, A., Haghnevis, M., and
Khodadadegan, Y. An improved model for
production systems with mixed queuing
priorities: an integrated simulation, AHP and
value-engineering approach, International
Journal of Industrial and Systems
Engineering, 4 (5) 536–553 (2009).
[15] Azadeh, A., Mohammadebrahim, R.,
Eivazy, H., Parameter optimization of
tandem queue systems with finite
intermediate buffers via fuzzy simulation,
Performance Evaluation, 67 353–36 (2010).
[16] Canonaco P., Legato, P., Mazza, R.H.
Musmanno, R., A queuing network model
for the management of berth crane
operations, Computers & Operations
Research, 35 2432–2446 (2008).
[17] Cheung, W., Leung, L.C., and Tam, P.C.F.,
An intelligent decision support system for
service network planning, Decision Support
Systems, 39 415–428 (2005).
[18] Dengiz, B., Bektas, T., and Ultanir, A. E.
Simulation optimization based DSS
application: A diamond tool production line
in industry, Simulation Modelling Practice
and Theory 14 296–312 (2006).
[19] Xing, L. N., Chen, Y. W., Yang, K. W.
Multi-objective flexible job shop schedule:
design and evaluation by simulation
modeling, Applied Soft Computing, 9 362–
376 (2009).
Thank you for copying data from http://www.arastirmax.com