Asadzadeh A., Sujit, K. S., Farzin, M. & Kotter, T. (2014). Assessing Site Selection of New Towns Using TOPSIS Method under Entropy Logic: A Case Study: New Towns of Tehran Metropolitan Region, Environmental Management and Sustainable Development, 3(1), 123-137.
Cheng, E.W.L. & Li, H. (2001). Analytic Hierarchy Process: An Approach to Determine Measures for Business Performance, Measuring Business Excellence, 5(3), 30-37.
Cheng, E.W.L., Li, H. & Ho, D.C.K. (2002). Analytic Hierarchy Process (AHP), A Defective Tool When Used Improperly, Measuring Business Excellence, 6(4), 33-37.
Deliktas, E. & Balcilar, M. (2005). A Comparative Analysis of Productivity Growth, Catch-Up, and Convergence in Transition Economies, Emerging Markets Finance and Trade, 41(1), 6-28.
Demir, A. & Bakirci, F. (2014). OECD Üyesi Ülkelerin Ekonomik Etkinliklerinin Veri Zarflama Analiziyle Ölçümü, Atatürk Üniversitesi İktisadi ve İdari Bilimler Dergisi, 28(2), 109-132.
Çankırı Karatekin Üniversitesi Çankırı Karatekin University
İktisadi ve İdari Bilimler Journal of The Faculty of Economics
Fakültesi Dergisi and Administrative Sciences
144
Demireli, E. & Ozdemir A.Y. (2013). Seçilmiş Avrupa Ülkelerinde Makroekonomik Performans Ölçümü: Şans Kısıtlı Veriz Zarflama Analizi ile Bir Uygulama, Dumlupınar Üniversitesi Sosyal Bilimler Dergisi, 37, 303-320.
Dincer, S.E. (2011). Multi-Criteria Analysis of Economic Activity for European Union Member States and Candidate Countries: TOPSIS and WSA Applications, European Journal of Social Sciences, 21(4), 563-572.
Eleren, A. & Karagul, M. (2008). Performance Analysis of Turkish Economy Between 1986-2006, Yönetim ve Ekonomi Dergisi, 15, 1-14.
El-Santawy, M.F. & Ahmed, A.N. (2013). An Information Entropy Weighting Method Combined to TOPSIS Approach for Ranking Consulting Firms, Life Science Journal, 10(1), 1060-1063.
Fare, R., Grosskopf, S., Norris, M. & Zhang, Z. (1994). Productivity Growth, Technical Progress and Efficiency Changes in Industrial Countries, American Economic Review, 84(1), 66–83.
Guran, C.M. & Tosun, M.U. (2005). Türkiye Ekonomisinin Makro Ekonomik Performansı: 1951-2003 Dönemi için Parametrik Olmayan Bir Ölçüm, Ankara Üniversitesi SBF Dergisi, 60(4), 89-115.
Hsu, M., Luo, X.C. & Gary, H. (2008). The Fog of OECD and Non-OECD Country Efficiency: A Data Envelopment Analysis Approach, The Journal of Developing Areas, 42(1), 81-93.
Hwang, C. & Yoon, K. (1981). Multiple Attribute Decision Making, Berlin: Springer-Verlag.
Karabulut, K., Ersungur, Ş.M. & Polat, Ö. (2008). Avrupa Birliği Ülkeleri ve Türkiye’nin Ekonomik Performanslarının Karşılaştırılması: Veri Zarflama Analizi, Atatürk Üniversitesi İktisadi ve İdari Bilimler Dergisi, 22(1), 1-11.
Mahmoodzadeh, S., Shahrabi, J., Pariazar, M. & Zaeri, M.S. (2007). Project Selection by Using Fuzzy AHP and TOPSIS Technique International, Journal of Human and Social Sciences, 1(3), 135-140.
Mangir, F. & Erdogan, S. (2011). Comparison of Economic Performance among Six Countries in Global Financial Crisis: The Application of Fuzz TOPSIS Method, Economics, Management and Financial Markets, 6(2), 122–136.
Olson D.L. (2004). Comparison of Weights In TOPSIS Models, Pergamon Mathematical and Computer Modeling, www.elsevier.com/-locate/mcm.
K.Eyüboğlu Bahar/Spring 2016
Cilt 6, Sayı 1, ss.131-146 Volume 6, Issue 1, pp.131-146
145
Onder, E., Tas, N. & Hepsen, A. (2015). Economic Performance Evaluation of Fragile 5 Countries After The Great Recession of 2008-2009 Using Analytic Network Process and TOPSIS Methods, Journal of Applied Finance & Banking, 5(1), 1-17.
Opricovic, S. & Gwo-Hshiung, T. (2004). Compromise Solution by MCDM Methods: A Comparative Analysis of VIKOR and TOPSIS, European Journal of Operational Research, 156, 445-455.
Ramanathan, R. (2006). Evaluating the Comparative Performance of Countries of the Middle East and North Africa: A DEA Application, Socioeconomic Planning Sciences, 40(2), 156-167.
Rao, R.V. (2008). Evaluation of Environmentally Conscious Manufacturing Programs Using Multiple Attribute Decision-Making Methods, Proceedings of The Institution of Mechanical Engineers - Part B – Engineering Manufacture, 222(3), 441-451. Saaty, T.L. (1980). The Analytic Hierarchy Process, New York: McGraw-Hill.
Saaty, T.L. (1994). How to Make a Decision: The Analytic Hierarchy Process, Interfaces, 24(6), 19-43.
Saaty, T.L. (1997). A Scaling Method for Priorities in Hierarchical Structures, Journal of Mathematical Psychology, 15, 57-68.
Saaty, T.L. (2001). Decision Making with Dependence and Feedback, The Analytic Network Process, 2nd Edition, Pittsburgh-USA: RWS Publications.
Triantaphyllou, E. & Mann, S.H. (1995). Using The Analytic Hierarchy Process for Decision Making in Engineering Applications: Some Challenges, Inter’l Journal of Industrial Engineering: Applications and Practice, 2(1), 35-44.
Triantaphyllou, E., Shu, B., Sanchez, S.N. & Ray, T. (1998). Multi-Criteria Decision Making: An Operations Research Approach, Encyclopedia of Electrical and Electronics Engineering, 15, 175-186.
Tochukwu, U.L. (2014). Using the Analytic Hierarchy Process for Choosing a Best Smartphone, Doi: 10.13140/2.1.3788.7040.
Urfalioglu, F. & Genc, T. (2013). Çok Kriterli Karar Verme Teknikleri İle Türkiye’nin Ekonomik Performansının Avrupa Birliği Üye Ülkeleri İle Karşılaştırılması, Marmara Üniversitesi İ.İ.B.Dergisi, 35, 329-360.
Çankırı Karatekin Üniversitesi Çankırı Karatekin University
İktisadi ve İdari Bilimler Journal of The Faculty of Economics
Fakültesi Dergisi and Administrative Sciences
146
Yang, J. & Lee, H. (1997). An AHP Decision Model for Facility Location Selection, Facilities, 15(9-10), 241-254.
Zahedi, F. (1986). The Analytic Hierarchy Process-A Survey of the Method and Its Applications, Interfaces, 16(4), 96-108.
Thank you for copying data from http://www.arastirmax.com