Multi-Objective Optimal Construction Site Layout Planning with Maximize Approach of Safety and Environment(Case Study: Mahestan Residential-Commercial complex)

Journal Name:

Publication Year:

Abstract (2. Language): 
Construction Site layout optimization is one of concern in recent years In the field of construction management. Site layout planning is an important step in building a development project is considered if a suitable design and optimization will have a large impact on efficiency and save resources. In previous research various approaches According to the designers look To solve this problem there The approaches Commensurate with the nature of the projects Are different. These research efforts as a model of multi-objective optimization Sort workshop for development aims at increasing safety and environmental aspects And also provide a lower cost. To solve the problem Sort Multi-Objective Particle Swarm Optimization algorithm As a meta-heuristic algorithms Used. Also in this study, In order to achieve a real model, A construction project in the city of Tehran. Put the study. In this model, The possibility of embedding the entrance and exit Facilities and buildings is considered.
1480
1498

REFERENCES

References: 

[1] Hosseinzadeh,M,D. (2010) “Optimization of Construction Site Layout by Metaheuristic
Algorithms”. M.Sc.dissertation.faculty of Engineering,Islamic Azad University, Tehran,Iran.
[2] Michael McCann & Janie Gittleman(2009).“Crane-Related Deaths in Construction and
Recommendations for Their Prevention”. The Center for Construction Research and Training.
[3] Tommelien, Levit R.E , Hayes-Roth B. (1992),“ Site plan model for site Layout”.Journal of
construction Engineering & Management,ASCE,118(4),749-766.
[4] Zhang, H. and Wang, J. (2008). ”Particle Swarm Optimization for Construction Site Unequal-Area
Layout.” J. Constr. Eng. Manage., 134(9), 739–748.
[5] Jiuping Xu, Zongmin Li (2012). “Multi-Objective Dynamic Construction Site Layout Planning in
Fuzzy Random Environment”. Automation in Construction (Impact Factor: 1.82). 27,pp 155–169.
[6] M.Yahya,M.P.Saka (2014). “Construction site layout planning using multi-objective artificial bee
colony algorithm with Levy flights”. Automation in Construction 38,pp 14–29.
[7] Sanad, H., Ammar, M., and Ibrahim, M. (2008). ”Optimal Construction Site Layout Considering
Safety and Environmental Aspects.” J. Constr. Eng. Manage., 134(7), pp 536–544.
[8] El-Rayes, K. and Khalafallah, A. (2005). ”Trade-off between Safety and Cost in Planning
Construction Site Layouts.” J. Constr. Eng. Manage., 131(11),pp 1186–1195.
[9] Sanad, H., Ammar, M., and Ibrahim, M. (2008). ”Optimal Construction Site Layout Considering
Safety and Environmental Aspects.” J. Constr. Eng. Manage., 134(7), pp 536–544.
[10] Xin Ning,ka chi Lam (2013). “Cost-safety trade-off in unequal-area site layout planning”.
Automation in Construction (32) pp96–103.
[11] Zhang, H. and Wang, J. (2008). ”Particle Swarm Optimization for Construction Site Unequal-Area
Layout.” J. Constr. Eng. Manage., 134(9), 739–748.
[12] Tommelien, Levit R.E , Hayes-Roth B. (1992),“ Site plan model for site Layout”.Journal of
construction Engineering & Management,ASCE,118(4),749-766.
[13] Elbeltagi E. & Hegazy ,T,Eldosouky A. (2004),“Dynamic layout of construction temporary
facilities considering safety”. Journal of construction engineering and management,534-541.
[14] Alshawi, M., & Sulaiman ,M. (1995),“Applying Structures Process Analysis to site layout
planning”. computing in civil & building engineering, 477.
[15] Rad,P., & Bradley,M . (1993),“The layout of temporary construction facilities”. COST
ENG,AACE 25(2),19-27.
[16] I-Cheng Yeh, Assoc. Prof., Dept. of Civ. Engrg (1995). “construction site layout using annealed
neural network”, Journal of Computing in Civil Engineering, Vol. 9, No. 3, July 1995, pp. 201-
208.
[17] H. Li & E.D. Love (1998). “Site-level facilities using Genetic algorithms”. JOURNAL OF
COMPUTING IN CIVIL ENGINEERING. 227.
[18] Zouein P.P., Tommelein I.D. (1999) “Dynamic Layout Planning Using a Hybrid Incremental
Solution Method”. Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 6,
pp. 400-408.
[19] Elbeltagi,E. (1999) “Constuction Site Planning”. Ph.D.dissertation.faculty of Engineering,El-
Mansoura University, El-Mansoura,Egypt.
[20] Carlos A.Coello Coello, Member, IEEE, Gregorio Toscano Pulido,. (2004),“ handling multiple
objetives with particle swarm optimization ,”IEEE TRANSACTIONS ON EVOLUTIONARY
COMPUTATION,VOL.8,NO.3