[1] Thomopoulos NT. Assembly Line Planning and Control.
Switzerland, Springer, 2014. [2] Salveson ME. "The assembly line balancing problem".
Journal of Industrial Engineering, 6, 18-25, 1955. [3] Ghosh S, Gagnon RJ. "A comprehensive literature review
and analysis of the design, balancing and scheduling of
assembly systems". The International Journal of
Production Research, 27(4), 637-670, 1989. [4] Erel E, Sarin SC. "A survey of the assembly line balancing
procedures". Production Planning & Control, 9(5),
414-434, 1998.
[5] Becker C, Scholl A. "A survey on problems and methods in generalized assembly line balancing". European Journal of Operational Research, 168(3), 694-715, 2006.
[6] Battala O, Dolgui A. "A taxonomy of line balancing problems and their solution approaches". International Journal of Production Economics, 142(2), 259-277, 2013.
[7] Sivasankaran P, Shahabudeen P. "Literature review of assembly line balancing problems". The International Journal of Advanced Manufacturing Technology, 73(9-12), 1665-1694, 2014.
[8] Scholl A, Becker C. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing". European Journal of Operational Research, 168(3),
666-693, 2006.
[9] Scholl A. Balancing and Sequencing of Assembly Lines. Heidelberg, Physica-Verlag, 1999.
[10] Hackman ST, Magazine MJ, Wee TS. "Fast, effective algorithms for simple assembly line balancing problems". Operations Research, 37(6), 916-924, 1989.
[11] Klein R, Scholl A. "Maximizing the production rate in simple assembly line balancing-a branch and bound procedure". European Journal of Operational Research, 91(2), 367-385, 1996.
[12] Pastor R, Ferrer L. "An improved mathematical program to solve the simple assembly line balancing problem". International Journal of Production Research, 47(11), 2943-2959, 2009.
[13] Pastor R, Ferrer L, Garcia A. Evaluating optimization models to solve SALBP. Editors: Gervasi O, Gavrilova ML. Computational Science and Its Applications-ICCSA 2007, 791-803, Berlin Heidelberg, Springer, 2007.
[14] Uğurdağ HF, Rachamadugu R, Papachristou CA. "Designing paced assembly lines with fixed number of stations". European Journal of Operational Research, 102(3), 488-501, 1997.
[15] Kilincci O. "A Petri net-based heuristic for simple assembly line balancing problem of type 2". The International Journal of Advanced Manufacturing Technology, 46(1), 329-338, 2010.
[16] Liu SB, Ong HL, Huang HC. "Two bi-directional heuristics for the assembly line type II problem". The International Journal of Advanced Manufacturing Technology, 22(9-10),
656-661, 2003.
[17] Anderson EJ, Ferris MC. "Genetic algorithms for combinatorial optimization: the assemble line balancing problem". ORSA Journal on Computing, 6(2), 161-173,
1994.
[18] Watanabe T, Hashimoto Y, Nishikawa I, Tokumaru H. "Line balancing using a genetic evolution model". Control Engineering Practice, 3(1), 69-76, 1995.
[19] Kim YJ, Kim YK, Cho Y. "A heuristic-based genetic algorithm for workload smoothing in assembly lines". Computers & Operations Research, 25(2), 99-111, 1998.
[20] Scholl A, Vote S. "Simple assembly line balancing-heuristic approaches". Journal of Heuristics, 2(3), 217¬244, 1997.
[21] Chiang WC. "The application of a tabu search metaheuristic to the assembly line balancing problem". Annals of Operations Research, 77, 209-227, 1998.
[22] Henrici AA. Comparison between simulated annealing and tabu search with an example from the production planning. Editors: Dyckhoff H. et al. Operations Research Proceedings, 498-503, Springer Verlag, Berlin, Germany,
1994.
449
Pamukkale Univ Muh Bilim Derg, 23(4), 444-450,2017
Ş. Akpınar
[23] Seyed-Alagheband SA, Fatemi Ghomi SMT, Zandieh M. "A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks". International Journal of Production Research, 49(3), 805-825, 2011.
[24] Boysen N, Fliedner M. "A versatile algorithm for assembly line balancing". European Journal of Operational Research, 184(1), 39-56, 2008.
[25] Zheng Q, Li M, Li Y, Tang Q. "Station ant colony optimization for the type 2 assembly line balancing problem". The International Journal of Advanced Manufacturing Technology, 66(9-12), 1859-1870, 2013.
[26] Nearchou AC. "Maximizing production rate and workload smoothing in assembly lines using particle swarm optimization". International Journal of Production Economics, 129(2), 242-250, 2011.
[27] Nearchou AC. "Balancing large assembly lines by a new heuristic based on differential evolution method". The International Journal of Advanced Manufacturing Technology, 34(9-10), 1016-1029, 2007.
[28] Zhang H, Yan Q, Liu Y, Jiang Z. "An integer-coded differential evolution algorithm for simple assembly line balancing problem of type 2". Assembly Automation, 36(3), 1-27, 2016.
[29] Blum C, Miralles C. "On solving the assembly line worker assignment and balancing problem via beam search". Computers & Operations Research, 38(1), 328-339, 2011.
[30] Blum C. "Iterative beam search for simple assembly line balancing with a fixed number of work stations". SORT, 35(2), 145-164, 2011.
[31] Lei D, Guo, X. "Variable neighborhood search for the second type of two-sided assembly line balancing problem". Computers & Operations Research, 72, 183¬188.
[32] Polat O, Kalayci CB, Mutlu Ö, Gupta, SM. "A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study". International Journal of Production Research, 54(3), 722-741, 2016.
[33] Dang QV, Pham K. "Design of a Footwear Assembly Line Using Simulation-based ALNS". Procedia CIRP, 40, 597-602, 2016.
[34] Shaw P. Using constraint programming and local search methods to solve vehicle routing problems. Editors: Maher M, Puget JF. Principles and Practice of Constraint Programming-CP98, 417-431, Berlin Heidelberg, Springer, 1998.
[35] Ropke S, Pisinger D. "An adaptive large neighborhood search heuristic for the pickup and delivery problem with time windows". Transportation Science, 40(4), 455-472, 2006.
[36] Pisinger D, Ropke S. Large neighborhood search. Editors: Gendreau M, Potvin JY. Handbook of Metaheuristics 2nd ed. New York, USA, Springer, 2010.
[37] Laporte G, Musmanno R, Vocaturo F. "An adaptive large neighbourhood search heuristic for the capacitated arc-routing problem with stochastic demands". Transportation Science, 44(1), 125-135, 2010.
[38] Muller LF, Spoorendonk S, Pisinger D. "A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times". European Journal of Operational Research, 218(3), 614-623, 2012.
[39] Demir E, Bektaş T, Laporte G. "An adaptive large neighborhood search heuristic for the pollution-routing problem". European Journal of Operational Research, 223(2), 346-359, 2012.
[40] Masson R, Lehuede F, Peton O. "An adaptive large neighborhood search for the pickup and delivery problem with transfers". Transportation Science, 47(3),
344-355, 2013.
[41] Adulyasak Y, Cordeau JF, Jans R. "Optimization-based adaptive large neighborhood search for the production routing problem". Transportation Science, 48(1), 20-45,
2012.
[42] Belo-Filho MAF, Amorim P, Almada-Lobo B. "An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products". International Journal of Production Research, 53(20), 6040-6058, 2015.
[43] Luo Z, Qin H, Zhang D, Lim A. "Adaptive large neighborhood search heuristics for the vehicle routing problem with stochastic demands and weight-related cost". Transportation Research Part E: Logistics and Transportation Review, 85, 69-89, 2016.
[44] Rifai AP, Nguyen HT, Dawal SZM. "Multi-objective
adaptive large neighborhood search for distributed reentrant permutation flow shop scheduling". Applied Soft Computing, 40, 42-57, 2016. [45] Leu YY, Matheson LA, Rees LP. "Assembly line balancing using genetic algorithms with heuristic generated initial populations and multiple criteria". Decision Sciences, 15, 581-606, 1994.
[46] Akpınar S, Bayhan GM. "A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints". Engineering Applications of Artificial Intelligence, 24(3),
449-57, 2011.
[47] Helgeson NB, Birnie DP. "Assembly line balancing using the ranked positional weight technique". Journal of Industrial Engineering, 12(6), 394-398, 1961.
[48] Kim YK, Kim YJ, Kim Y. "Genetic algorithms for assembly line balancing with various objectives". Computers & Industrial Engineering, 30(3), 397-409, 1996.
[49] Goncalves JF, De Almeida JR. "A hybrid genetic algorithm for assembly line balancing". Journal of Heuristics, 8(6), 629-642, 2002.
[50] Akpınar, S. "Hybrid large neighbourhood search algorithm for capacitated vehicle routing problem". Expert Systems with Applications, 61, 28-38, 2016.
450
Thank you for copying data from http://www.arastirmax.com