[1] Hosseinzadeh,M,D. (2010) “Optimization of Construction Site Layout by Metaheuristic
Algorithms”. M.Sc.dissertation.faculty of Engineering,Islamic Azad University, Tehran,Iran.
[2] Michael McCann & Janie Gittleman(2009).“Crane-Related Deaths in Construction and
Recommendations for Their Prevention”. The Center for Construction Research and Training.
[3] Tommelien, Levit R.E , Hayes-Roth B. (1992),“ Site plan model for site Layout”.Journal of
construction Engineering & Management,ASCE,118(4),749-766.
[4] Zhang, H. and Wang, J. (2008). ”Particle Swarm Optimization for Construction Site Unequal-Area
Layout.” J. Constr. Eng. Manage., 134(9), 739–748.
[5] Jiuping Xu, Zongmin Li (2012). “Multi-Objective Dynamic Construction Site Layout Planning in
Fuzzy Random Environment”. Automation in Construction (Impact Factor: 1.82). 27,pp 155–169.
[6] M.Yahya,M.P.Saka (2014). “Construction site layout planning using multi-objective artificial bee
colony algorithm with Levy flights”. Automation in Construction 38,pp 14–29.
[7] Sanad, H., Ammar, M., and Ibrahim, M. (2008). ”Optimal Construction Site Layout Considering
Safety and Environmental Aspects.” J. Constr. Eng. Manage., 134(7), pp 536–544.
[8] El-Rayes, K. and Khalafallah, A. (2005). ”Trade-off between Safety and Cost in Planning
Construction Site Layouts.” J. Constr. Eng. Manage., 131(11),pp 1186–1195.
[9] Sanad, H., Ammar, M., and Ibrahim, M. (2008). ”Optimal Construction Site Layout Considering
Safety and Environmental Aspects.” J. Constr. Eng. Manage., 134(7), pp 536–544.
[10] Xin Ning,ka chi Lam (2013). “Cost-safety trade-off in unequal-area site layout planning”.
Automation in Construction (32) pp96–103.
[11] Zhang, H. and Wang, J. (2008). ”Particle Swarm Optimization for Construction Site Unequal-Area
Layout.” J. Constr. Eng. Manage., 134(9), 739–748.
[12] Tommelien, Levit R.E , Hayes-Roth B. (1992),“ Site plan model for site Layout”.Journal of
construction Engineering & Management,ASCE,118(4),749-766.
[13] Elbeltagi E. & Hegazy ,T,Eldosouky A. (2004),“Dynamic layout of construction temporary
facilities considering safety”. Journal of construction engineering and management,534-541.
[14] Alshawi, M., & Sulaiman ,M. (1995),“Applying Structures Process Analysis to site layout
planning”. computing in civil & building engineering, 477.
[15] Rad,P., & Bradley,M . (1993),“The layout of temporary construction facilities”. COST
ENG,AACE 25(2),19-27.
[16] I-Cheng Yeh, Assoc. Prof., Dept. of Civ. Engrg (1995). “construction site layout using annealed
neural network”, Journal of Computing in Civil Engineering, Vol. 9, No. 3, July 1995, pp. 201-
208.
[17] H. Li & E.D. Love (1998). “Site-level facilities using Genetic algorithms”. JOURNAL OF
COMPUTING IN CIVIL ENGINEERING. 227.
[18] Zouein P.P., Tommelein I.D. (1999) “Dynamic Layout Planning Using a Hybrid Incremental
Solution Method”. Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 6,
pp. 400-408.
[19] Elbeltagi,E. (1999) “Constuction Site Planning”. Ph.D.dissertation.faculty of Engineering,El-
Mansoura University, El-Mansoura,Egypt.
[20] Carlos A.Coello Coello, Member, IEEE, Gregorio Toscano Pulido,. (2004),“ handling multiple
objetives with particle swarm optimization ,”IEEE TRANSACTIONS ON EVOLUTIONARY
COMPUTATION,VOL.8,NO.3
Thank you for copying data from http://www.arastirmax.com