AYKN, Turgut; (1996), “Optimal Shift Scheduling with Multiple Break
Windows”, Management Science , 42(4), ss.591-602.
BECHTOLD, Stephen.E. ve Larry.W. JACOBS; (1990), “Implicit Modeling of
Flexible Break Assignments in Optimal Shift Scheduling”,
Management Science, 36(11), ss.1339-1351.
BELLMAN, Richard E. ve Lotfi A.ZADEH; (1970), “Decision-Making in
Fuzzy Enviroment”, Management Science , 17(4), ss. B-141-164.
BESKESE, Ahmet; Cengiz KAHRAMAN ve Zahir IRAN;
(2004),“Quantification Of Flexibility In Advanced Manufacturing
Systems Using Fuzzy Concept”, Int. J. Production Economics, 89, ss.
45-56.
CHEN, Shih-Pin; (2006), “ A Mathematical Programming Approach To The
Machine Interference Problem With Fuzzy Parameters” Applied
Mathematics And Computation, 174, ss.374-387.
DANTZG, GeorgeB.; (1954), “ A Comment On Edie’s Traffic Delays At Tool
Booths” Operations Research, 2(3), ss.339-341.
DELGADO, Miguel; Jose Luis VERDEGAY ve Maria Amparo VILA; (1989),
“A General Model For Fuzzy Linear Programming”, Fuzzy Sets and
Systems, 29, ss. 21-29.
EKEL, P Ya; M.R. SILVA; F. SCHUFFNER NETO ve R.M. PALHARES;
(2006), “Fuzzy Preference Modeling and Its Application to
Multiobjective Decision Making”, Computer and Mathematics with
Applications, 52, ss. 179-196.
GUPTA, Pankaj; Mukesh Kumar MEHLAWAT ve Anand SAXENA; (2008),
“Asset Portfolio Optimization Using Fuzzy Mathematical Programming
”, Information Sciences, 178, ss. 1734-1755.
ISLAM, Sahidul ve Tapan Kumar ROY; (2006), “A New Fuzzy Multi-
Objective Programming : Entropy Based Geometric Programming And
Its Application Of Transportation Problems”, European Journal of
Operational Research, 173, ss.387-404.
KATAGIRI, Hideki ve Hiroaki ISHII; (2000), “Some Inventory Problems With
Fuzzy Shortage Cost”, Fuzzy Sets And Systems, 111, ss.87-97.
KEITH, Elbridge G.; (1979), “Operator Scheduling”, AIIE Transactions,
1(11), ss.37-41.
LEUNG, Yee; (1988),“Interregional Equlibrium and Fuzzy Linear
Programming ”, Environment and Planning , A 20.25-40, ss.219-230.LUHANDJULA, M.K.; (2006),“Fuzzy Stochastic Linear Programming: Survey
and Future Research Directions”, European Journal of Operational
Research , 174, ss.1353-1367.
MAHAPATRA, G.S. ve T.K. ROY; (2006),“Fuzzy Multi-Objective
Mathematical Programming On Reliability Optimization Model”,
Applied Mathematics and Computation , 174, ss.643-659.
MULA, J.; R. POLER ve J.P. GARCIA; (2006),“MRP With Flexible
Constraints: A Fuzzy Mathematical Programming Approach”, Fuzzy
Sets And Systems, 157, ss.74-97.
SAKAWA, Masatoshi; Ichiro NISHIZAKI ve Yoshio VEMURA;
(2001),“Interactive Fuzzy Programming For Two-Level Linear And
Linear Fractional Production And Assignment Problems: A case Study”,
European Journal Of Operational Research, 135, ss.142-157.
SLOWINSKI, Roman; (1986), “A Multicriteria Fuzzy Linear Programming
Method For Water Supply System Development Planning ”, Fuzzy Sets
and Systems, 19, ss.217-237.
TANAKA, Hideo.; T. OKUDA ve Kiyoji. ASAI; (1974), “On Fuzzy
Mathematical Programming”, J.Cybernetics, 3, ss.37-46.
THOMPSON, Gary M.; (1996), “Optimal Scheduling of Shifts and Breaks
Using Employees Having Limited Time-Availability”, International
Journal of Service Industry Management, 7(1), ss.56-73.
THOMPSON, Gary.M.; (1999) “Labor Scheduling, Part 3 (Developing A
Workforce Schedule)”,Cornell Hotel and Restaurant Administration
Quarterly, ss.86-96.
VERDEGAY, Jose Luis; (1982)“Fuzzy Mathematical Programming
in:M.Grupta and E.Sanchez”, Fuzzy Information and Decision
Processes, ss.231-237.
WANG, Reay-Chen ve Tien-Fu LIANG; (2004), “Aplications of Fuzzy Multi
Objective Linear Programming To Aggregate Production Planning”,
Computers&Industrial Engineering, 46, ss.17-41.
ZIMMERMANN, Hyman J.; (1985), “Aplications of Fuzzy Set Theory to
Mathematical Programming”, Information Sciences, 36, ss.29-
58.
Thank you for copying data from http://www.arastirmax.com