RÜZGAR ELEKTRİK SANTRALLERİNİN ŞEBEKE BAĞLANTI ANALİZLERİ İÇİN SİMÜLASYON MODELİNİN OLUŞTURULMASI

OCCURING SIMULATION MODEL OF GRID CONNECTION ANLYSIS FOR THE WIND POWER PLANT

Journal Name:

Publication Year:

Abstract (2. Language): 
In accordance with the aim of increasing the renewable energy sources in Turkish power system, the optimum wind power generation capacity in the power system shall be maximized. Since 52,6% of raw materials for operation of conventional electricity generation sources (e.g. natural gas) are imported, the integration of wind power plants to the Turkish power system plays a critical role in Turkish economy. In order to maximize the capacity of wind power plants and keep the stability constant in the system, Turkish Grid Code also needs to be detailed and expended. There are several requirements defined in transmission and distribution system grid codes in the World and in our country for stable connection of renewable energy sources. In this paper grid codes of several countries is examined and afterwards simulation models and connection assesment of wind power plants are explained.
Abstract (Original Language): 
Yenilenebilir enerji kaynaklarının maksimum düzeyde kullanılması için elektrik iletim/dağıtım sistemimize bağlanabilecek optimum yenilenebilir elektrik üretim kapasitesinin artırılması için her bağlantı noktası için dinamik analiz yapılması gerekmektedir. Rüzgâr enerjisinin şebeke entegrasyonunun artırılması için değişken formasyonun elektrik şebeke yönetimi açısından yönetilebilir hale getirilmesi hatta bu tesislerin şebeke gereklilikleri açısından pozitif yararlanılması elektrik üretimimizin %52,6’sının ithal kaynaklarla karşılayan ülkemiz için sebebiyle kritik öneme sahiptir. Yenilenebilir enerji üretim santrallerinin elektrik şebekesine entegrasyonu çalışmalarına katkı sağlamak için rüzgar elektrik üretim santralinin modellenmesini içeren ve şebeke ile senkron çalışırken yeteneklerinin irdelenmesi üzerindeki durulmuştur. Bu amaçla mevzuat altyapısının genişletilerek detaylandırılması ve elektrik üretim santral primer teçhizatın işletme döneminde problem oluşturmayacak ve yönetmelik kriterlerini sağlayacak şekilde ilgili standartlara uygun boyutlandırması büyük önem arz etmektedir. Bu bağlamda, yenilenebilir elektrik üretim santrallerinin şebekeye güveninilir şekilde bağlanabilmesini sağlamak amacıyla şebeke kriterleri (grid code) zorunlu hale getirilmiş olup, simülasyon çalışmalarında rüzgar parkının reaktif güç, frekans tepkisi, Fault Ride Through (FRT) desteği gibi hususlardaki davranışları incelenmiş olup elde edilen sonuçlar şebeke gereklilikleri açısından kritik edilmiştir.
351
368

REFERENCES

References: 

1. JAUCH C., ve Diğerleri, “International Comparison of Requirements for Connection of Wind Turbines to Power System ”, Published online 28 July 2005 in Wiley Interscience (www.interscience.wiley.com). DOI: 10.1002/we.160 Wind Energ. 2005; 8:295–306.
2. LE, H. T., SANTOSO, S., “Analysis of Voltage Stability and Optimal Wind Power Penetration Limits for a Non-Radial Network, with an Energy Stroge System ”, 1-4244-1298-6/07/$25.00 ©2007 IEEE., 2007.
3. GEORGILAKIS, P.S., “Technical Challenges Associated With The Integration of Wind Power into Power Systems”, Renewable and Sustainable Energy Reviews, Volume 12, 852–863, 2008.
4. SULLA, F., “Simulation of DFIG and FSIG wind farms in MATLAB SimPower System” Industrial Electrical Engineering and Automation CODEN:LUTEDX/(TEIE-7235)/1-007/(2009), April 2009)
5. GUPTA, A., SHANDILYA,A., “Challenges of Integration of Wind Power on Power System Grid a Review” International Journal of Emerging Technology and Advanced Engineering Website: www.ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 4, Issue 4, April 2014)
6. WALLNERSTRÖM, G., HILBER, C., SÖDERSTRÖM, P., SAERS, R., HANSSON, O. “Potential of dynamic rating in Sweden”. In: 13th International Conference on Probabilistic Methods Applied to Power Systems (PMAPS); Durham, UK, 7-10 July 2014. http://www.diva-portal.org; http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-147995
7. Yang Y., Chen W., Blaabjerg F., “Advanced Control of Photovoltaic and wind Turbines Power System” T. Orłowska-Kowalska et al. (eds.), Advanced and Intelligent Control in Power Electronics and Drives, Studies in Computational Intelligence 531, DOI: 10.1007/978-3-319-03401-0_2, _ Springer International Publishing Switzerland 2014.
M. Demirol- T. N. Demirol 1/3 (2015) 351-368 367
Gazi Mühendislik Bilimleri Dergisi
8. García-Sánchez, T., ve diğerleri, “Comparison of Voltage Dip Characterization under Grid-Code Requirements:Application to PV Power Plants ”, International Conference on Renewable Energies and Power Quality (ICREPQ’15) La Coruña (Spain), 25th to 27th March, 2015, ISSN 2172-038 X, No.13, April 2015
9. J. Hossain and H. R. Pota, “Robust Control for Grid Voltage Stability: High Penetration of Renewable Energy, Power Systems”, OI: 10.1007/978-981-287-116-9_2, © Springer Science+Business Media Singapore 2014.
10. Bründlinger, R., “Distribution Grid Codes and the Integraiton of Smart PV Invertors in Europe” sunumu s.12-16. IEEE PES General Meeting, Vancouver, 2013, AIT Austrian Institute of Technology, Vienna, Austria.
11. Nguyen, T-D., “Verified Power Plants As a Reliable solution for Efficient System Integration”, PV power Plants – Turkey 09-10 April 2014, İstanbul.
12. THE GRID CODE ISSUE 5 REVISION 14 26 August 2015 © Copyright owned by National Grid Electricity Transmission plc, all rights reserved. 2015.
13. Montoro D.F., “038589 SUNRISE D2-3 Recommendations for unified technical regulations for grid-connected PV systems” EPIA (European Photovoltaic Industry Association), WIP, FIEC (the European Construction Industry Federation), AIE (the European Association of Electrical Contractors), UIA-ARES (International Union of Architects), www.pvsunrise.eu
14. Yang Y., Chen W., Blaabjerg F., “Advanced Control of Photovoltaic and wind Turbines Power System” T. Orłowska-Kowalska et al. (eds.), Advanced and Intelligent Control in Power Electronics and Drives, Studies in Computational Intelligence 531, DOI: 10.1007/978-3-319-03401-0_2, _ Springer International Publishing Switzerland 2014.
15. Degner, T., Arnold, G., Braun, M., Geibel, D., “Utility-scale PV systems: grid connection requirements, test procedures and European harmonisation” Institut für Solare Energieversorgungstechnik, Kassel, Germany; R. Bründlinger, arsenal research, Electric Energy Systems, Vienna, Austria
16. Kling, W.L., ve Diğerleri, “Wind Power Grid Integration: The European Experience” 17th Power System Computaion Conference Stocckholm Sweden- August 22-26, 2011
17. García-Sánchez, T., ve diğerleri, “Comparison of Voltage Dip Characterization under Grid-Code Requirements:Application to PV Power Plants ”, International Conference on Renewable Energies and Power Quality (ICREPQ’15) La Coruña (Spain), 25th to 27th March, 2015, ISSN 2172-038 X, No.13, April 2015
18. NETWORK CODE for Reuirement for Grid Connection Applicable to All Generators ” Working Document.3. 17th Power System Computaion Conference Stocckholm Sweden- August 22-26, 2011
368 M. Demirol- T. N. Demirol 1/3 (2015) 351-368
Gazi Journal of Engineering Sciences
19. T. Ackermann, Ed.,“Wind Power in Power Systems”, Chichester: John Wiley & Sons Ltd, 2005.
20. IEC 60287: “Electric cables-Calculation of the current rating”, Version 11, 1993.
21. IEC 60909: “Short-circuit currents in three-phase AC systems ”, Version 1, 2001.
22. GEORGILAKIS, P.S., “Technical Challenges Associated With The Integration of Wind Power into Power Systems”, Renewable and Sustainable Energy Reviews, Volume 12, 852–863, 2008.