[1] Cox, A., and Townsend, M., Strategic procurement in construction: toward better practice in the management of construction supply chains. Thomas Telford, UK, (1998).
[2] Levy, S.M., Project management in construction. McGraw-Hill Company, New York, (2000).
[3] Bernstein, H.M., Measuring Productivity in Construction: Improving Business Performance. Dodge Sweets Architectural Record ENR Regional Publications, (2007).
[4] National Productivity Corporation, 24th Productivity Report, Malaysia, (2016).
[5] Harmon, K.M., and B. Cole., Loss of Productivity Studies–Current Uses and Misuses. Construction Briefs, Vol. 8(1), pp 1-19, (2006).
[6] Hanna, A. S., C L., Menches, K. T. Sullivan and J. R. Sargent., Factors Affecting Absenteeism Electrical Construction, Journal of Construction Engineering and Management, Vol.131(11), (2005).
[7] Yi W., and A. P.C. Chan., Critical Review of Labor Productivity Research in Construction, Journal of Management in Engineering, Vol. 30(2) pp 214-225, (2013).
[8] Hany, A. M. A., A. A. Ibrahim and S. A. Khalid., Indicators for Measuring Performance of Building Construction Company in the Kingdom of Saudi Arabia, Journal of King Saudi University Engineering Science, Vol 25 pp 124-134, (2012).
[9] Olomolaiye, P., Jayawardane, A., and Harris, F., Construction Productivity Management, Chartered Institute of Building, United Kingdom, (1998).
[10] Jarkas, A. and Bitar, C., Factors affecting construction labor productivity in Kuwait, Journal of Construction Engineering and Management, Vol. 138(7) pp 811–820, (2012).
[11] Sherif, M. Hafez., Remon F. Aziz., Enas S. Morgan., Madeha M. Abdullah., Eman K. Ahmed., Critical Factors Affecting Construction Labor Productivity in Egypt, American Journal of Civil Engineering, Vol. 2(2) pp 35-40, (2014). Doi: 10.11648/j.ajce.20140202.14
[12] Kadir, A. M., Lee, W., Jaafar, M., Sapuan, S., and Ali, A., Factors affecting construction labor productivity for Malaysian residential projects, Structural Survey, Vol. 23(1) pp 42–54, (2005).
[13] Nasiru, Z. M., Ashiru. S., Ahmad, M. S. B., Egba, E. I., and Jibrin, H. S., Evaluation of Factors Affecting Labour Productivity in Construction Industry: A Case Study, Jurnal Teknologi, Vol. 77(12) pp 87-91, (2015).
[14] Adnan, E., Sherif, M., Ziad, A.M., and Peter, E.M., Factors Affecting Labour Productivity in Building Projects in Gaza Strip, Journal of Civil Engineering and Management, Vol. 13(4) pp 245-254, (2007).
[15] Kaming, P., Olomolaiye, P., Holt, G., and Harris, F., Factors Influencing Craftsmen’s Productivity in Indonesia, International Journal of Project Management, Vol. 15(1) pp 21–30, (1997).
[16] United Nations, The effect of repetition on building operations and processes on site, New York, (1995).
[17] Heizer, J., Render, B., Production and Operations Management, Strategic and Tactical Decisions, Prentice Hall, New Jersey, (1990).
[18] Herbsman, Z., and Ellis, R., Research of Factors Influencing Construction Productivity, Construction Management and Economics, Vol. 32(8), pp 49–61, (1990).
[19] Lim, E.C. and Alum, J., Construction Productivity: Issues Encountered by Contractors in Singapore, International Journal of Project Management, Vol. 13(1) pp 51–58, (1995).
[20] Centralized Information Management System, Construction Industry Development Board (CIDB), (2017). Available at: http://cimsapp.cidb.gov.my/SMIS/regcontractor/reglocalsearchcontractor.v...
[21] Kreicie, R.V., and Morgan, D.W., Determining Sample Size for Research Activities. Educational and Psychological Measurement, Vol. 30 pp 607-610, (1970).
[22] Mahamid, I., Principal Factors Impacting Labor Productivity of Public Construction Projects in Palestine: Contractors’ Perspective, International Journal of Architecture, Engineering and Construction, Vol 2(3) pp 194-202 (2013).
International Journal of Science and Engineering Investigations, Volume 6, Issue 71, December 2017 15
www.IJSEI.com Paper ID: 67117-03
ISSN: 2251-8843
[23] Alinaitwi, H., Mwakali, J., and Hansson, B., Factors Affecting the Productivity of Building Craftsmen Studies of Uganda, Journal of Construction Engineering and Management, Vol. 13(3) pp 169–176, (2007).
[24] Ailabouni, N., Gidado, K., and Painting, N., Factors affecting employee productivity in the UAE construction industry, Proceeding Conference for Postgraduate Researchers of the Built and Natural Environment (PRoBE), Glasgow, United Kingdom, pp 33–46, (2007).
[25] Enshassi, A., Sherif, M., Ziad, A. M., and Peter., E. M., Factors Affecting Labour Productivity in Building Projects in the Gaza Strip, Journal of Civil Engineering and Management, Vol. 13(4) pp 245-254, (2007). Available at: https://doi.org/10.1080/13923730.2007.9636444
[26] Thomas, H. R., Construction Baseline Productivity: Theory and Practice. Journal of Construction Management and Engineering, ASCE, Vol. 125(5), pp 295–303, (1999).
Thank you for copying data from http://www.arastirmax.com