You are here

Principal Factors Impacting Labor Productivity in Malaysian Construction Industry: A Survey of Constraints on Klang Valley Non-Residential Projects

Journal Name:

Publication Year:

Abstract (2. Language): 
The research aims to identify the principal factors affecting labor productivity in Klang Valley non-residential projects and to rank the factors in top five according to the indexes. There were 19 factors identified through a detailed literature review. Factors of similar category were grouped together into three main groups: labor, managerial, equipment and material. The structured questionnaire was used in order to gather sufficient information in an efficient way. A total of 320 questionnaires were distributed and 170 complete sets received back were analyzed and presented in the form of tables. The collected data were analyzed by using severity index, frequency index and important index. The analysis of the identified factors indicated that the top five factors negatively affecting labor productivity in Klang Valley non-residential projects were: equipment and material shortage, poor site management, lack of experience, misunderstanding among labor and superintendent and problems related to drawing and specification. The research was believed to be useful information in improving labor productivity especially in non-residential projects around Klang Valley, Malaysia.
9
15

REFERENCES

References: 

[1] Cox, A., and Townsend, M., Strategic procurement in construction: toward better practice in the management of construction supply chains. Thomas Telford, UK, (1998).
[2] Levy, S.M., Project management in construction. McGraw-Hill Company, New York, (2000).
[3] Bernstein, H.M., Measuring Productivity in Construction: Improving Business Performance. Dodge Sweets Architectural Record ENR Regional Publications, (2007).
[4] National Productivity Corporation, 24th Productivity Report, Malaysia, (2016).
[5] Harmon, K.M., and B. Cole., Loss of Productivity Studies–Current Uses and Misuses. Construction Briefs, Vol. 8(1), pp 1-19, (2006).
[6] Hanna, A. S., C L., Menches, K. T. Sullivan and J. R. Sargent., Factors Affecting Absenteeism Electrical Construction, Journal of Construction Engineering and Management, Vol.131(11), (2005).
[7] Yi W., and A. P.C. Chan., Critical Review of Labor Productivity Research in Construction, Journal of Management in Engineering, Vol. 30(2) pp 214-225, (2013).
[8] Hany, A. M. A., A. A. Ibrahim and S. A. Khalid., Indicators for Measuring Performance of Building Construction Company in the Kingdom of Saudi Arabia, Journal of King Saudi University Engineering Science, Vol 25 pp 124-134, (2012).
[9] Olomolaiye, P., Jayawardane, A., and Harris, F., Construction Productivity Management, Chartered Institute of Building, United Kingdom, (1998).
[10] Jarkas, A. and Bitar, C., Factors affecting construction labor productivity in Kuwait, Journal of Construction Engineering and Management, Vol. 138(7) pp 811–820, (2012).
[11] Sherif, M. Hafez., Remon F. Aziz., Enas S. Morgan., Madeha M. Abdullah., Eman K. Ahmed., Critical Factors Affecting Construction Labor Productivity in Egypt, American Journal of Civil Engineering, Vol. 2(2) pp 35-40, (2014). Doi: 10.11648/j.ajce.20140202.14
[12] Kadir, A. M., Lee, W., Jaafar, M., Sapuan, S., and Ali, A., Factors affecting construction labor productivity for Malaysian residential projects, Structural Survey, Vol. 23(1) pp 42–54, (2005).
[13] Nasiru, Z. M., Ashiru. S., Ahmad, M. S. B., Egba, E. I., and Jibrin, H. S., Evaluation of Factors Affecting Labour Productivity in Construction Industry: A Case Study, Jurnal Teknologi, Vol. 77(12) pp 87-91, (2015).
[14] Adnan, E., Sherif, M., Ziad, A.M., and Peter, E.M., Factors Affecting Labour Productivity in Building Projects in Gaza Strip, Journal of Civil Engineering and Management, Vol. 13(4) pp 245-254, (2007).
[15] Kaming, P., Olomolaiye, P., Holt, G., and Harris, F., Factors Influencing Craftsmen’s Productivity in Indonesia, International Journal of Project Management, Vol. 15(1) pp 21–30, (1997).
[16] United Nations, The effect of repetition on building operations and processes on site, New York, (1995).
[17] Heizer, J., Render, B., Production and Operations Management, Strategic and Tactical Decisions, Prentice Hall, New Jersey, (1990).
[18] Herbsman, Z., and Ellis, R., Research of Factors Influencing Construction Productivity, Construction Management and Economics, Vol. 32(8), pp 49–61, (1990).
[19] Lim, E.C. and Alum, J., Construction Productivity: Issues Encountered by Contractors in Singapore, International Journal of Project Management, Vol. 13(1) pp 51–58, (1995).
[20] Centralized Information Management System, Construction Industry Development Board (CIDB), (2017). Available at: http://cimsapp.cidb.gov.my/SMIS/regcontractor/reglocalsearchcontractor.v...
[21] Kreicie, R.V., and Morgan, D.W., Determining Sample Size for Research Activities. Educational and Psychological Measurement, Vol. 30 pp 607-610, (1970).
[22] Mahamid, I., Principal Factors Impacting Labor Productivity of Public Construction Projects in Palestine: Contractors’ Perspective, International Journal of Architecture, Engineering and Construction, Vol 2(3) pp 194-202 (2013).
International Journal of Science and Engineering Investigations, Volume 6, Issue 71, December 2017 15
www.IJSEI.com Paper ID: 67117-03
ISSN: 2251-8843
[23] Alinaitwi, H., Mwakali, J., and Hansson, B., Factors Affecting the Productivity of Building Craftsmen Studies of Uganda, Journal of Construction Engineering and Management, Vol. 13(3) pp 169–176, (2007).
[24] Ailabouni, N., Gidado, K., and Painting, N., Factors affecting employee productivity in the UAE construction industry, Proceeding Conference for Postgraduate Researchers of the Built and Natural Environment (PRoBE), Glasgow, United Kingdom, pp 33–46, (2007).
[25] Enshassi, A., Sherif, M., Ziad, A. M., and Peter., E. M., Factors Affecting Labour Productivity in Building Projects in the Gaza Strip, Journal of Civil Engineering and Management, Vol. 13(4) pp 245-254, (2007). Available at: https://doi.org/10.1080/13923730.2007.9636444
[26] Thomas, H. R., Construction Baseline Productivity: Theory and Practice. Journal of Construction Management and Engineering, ASCE, Vol. 125(5), pp 295–303, (1999).

Thank you for copying data from http://www.arastirmax.com