The stability of a slope is often expressed as the ratio of the total strength of the material to the stresses in the slope. The strength to stress ratio is also refers to the safety factor which is extensively used for the analysis of slope stability. This study aimed to evaluate its stability and durability of the new slope formed after an earlier failure at Arakli-Tasonu limestone quarry. Within the scope of this study, the coefficients of slope safety factor for the planar failure observed in the quarry were determined according to two different Models. From the analysis of slope stability, the coefficients of safety factor generally were found to be lower than 1.2, which was below the accepted safety limit for the long term durability of slopes and these low values indicated that existing slopes couldn't sustain its stability in long-term with the high potential risk for the surrounding area.
Abstract (Original Language): 
Bir şevin duraylılığı, genel olarak, kaymaya karşı koyan toplam kuvvetlerin kaymaya neden olan kuvvetlere oranı olarak ifade edilir. Buradaki oran aynı zamanda güvenlik katsayısını ifade etmektedir ve şev duraylılık analizlerinde kullanılmaktadır. Bu çalışma, Araklı-Taşönü kireçtaşı sahasında heyelan sonrası oluşan yeni şevin duraylılığının araştırılmasına yöneliktir. Düzlemsel kayma türü duraysızlığının gözlemlendiği kireçtaşı sahasında değişen durumlar için iki farklı modele göre güvenlik katsayısı hesaplamaları yapılmıştır. Yapılan analizlerden elde edilen güvenlik katsayısı değerlerinin genel itibari ile şevlerin uzun dönemde duraylı kalması için güvenlik sınırı olarak kabul edilen 1.2 limit değerinin genelde altında olduğu, heyelan sonucu oluşan yeni şevin uzun dönemde duraylılığını koruyamayacağı ve çevresel açıdan risk taşıdığı anlaşılmıştır.
121-129

REFERENCES

References: 

Bye A.R. and Bell, F.G., 2001, Stability assesment and slope design at Sandsloot open pit, South open pit, South Africa, International Journal of Rock Mechanics&Mining Sciences, 38, 449-466.

Erçıkdı, B., Kesimal, A., Yılmaz, E. ve Cihangir, F., 2004, Patlatma kaynaklı yer sarsıntısı ölçüm sonuçlarının değerlendirilmesi, Fen Bilimleri Dergisi, Dumlupınar Üniversitesi, 7, 195-216.

Erguvanlı, K., 1975, Trabzon Çimento Fabrikası Araklı-Taşönü köyü hammadde raporu, 35.

Glass, E. and Charles, D., 2001, The influence of seismic events on slope stability, Slope Stability in Surface Mining, Society for Mining, Metallurgy, and Exploration, Inc, (SME), 89-96.

Goodman, R, E., 1995, Block theory and its application, Geotechnique, 45(39, 383-422.
Hoek, E. and Bray, D., 1981, Rock slope engineering, London: Institution of Mining and Metallurgy, Rev. 3rd Edition.

Huang, L, 2004, Stability analysis of mine pit slopes interior Alaska, International Journal of Rock Mechanics and Mining Sciences, 41 (3), CD-ROM.

Kahriman, A., 2004. Analysis of parameters of ground vibration produced from bench blasting at a limestone quarry, Soil Dynamics and Eartquake Engineering, 24, 887-892.

Kesimal, A., Erçıkdı, B. ve Cihangir, F., 2005a, Trabzon ili, Araklı İlçesi, Taşönü Köyü hudutlarında bulunan kalker taşocağının üretiminde patlatmadan kaynaklanan titreşim ölçüm sonuçları ve değerlendirilmesi, Ara Rapor 2, Döner Sermaye Projesi, Trabzon, 25.

Kesimal, A., Erçıkdı, B. ve Cihangir, F., 2005b, Trabzon İli, Araklı İlçesi, Taşönü Köyü hudutlarında bulunan kalker ocağında oluşan heyelanlı bölgenin basamaklandırma ve kazı projesi, Döner Sermaye Projesi, Trabzon, 72.

Kim, J., Jeong, S., Park, S. and Sharma, J., 2004, Influence of rainfall-induced wetting on the stability of slopes in weathered soils, Engineering Geology, 75, 251-262.

MBM, 2005, Trabzon İlinin 2005 yılı meteorolojik verileri, Meteoroloji Bölge Müdürlüğü, 15.

Onur, H. A., Konak, G., Köse, H. ve Karakuş, D., 2000, TKİ Çan Linyitleri İşletmesinde delme-patlatma faaliyetlerinin şev stabilitesi üzerindeki etkileri, 4. Delme ve Patlatma Sempozyumu, Ankara, 173-180.

Özgenoğlu, A., 2005, Açık işletmelerde şev stabilitesi analizi, Maden Mühendisliği Açık Ocak İşletmeciliği El Kitabı, TMMOB Maden Mühendisleri Odası, 337-387.

Öztekin, B., Topal, T. and Kolat, C., 2006, Assesment of degradation and stability of a cut slope in limestone, Ankara-Turkey, Engineering Geology, 84, 12-30.

Paşamehmetoğlu, A. G., Özgenoğlu, A. ve Karpuz, C., 1999, Kaya şev stabilitesi, TMMOB Maden Mühendisleri Odası Yayını, 4. Baskı, 358.

Vardar, M., 1987, Kaya şevlerini projelendirme esasları, Dayanma Yapıları Semineri, DSİ, Cilt II, 125.