Baker, R., & Wang, W. (1993). Developing and testing the delay-time model. Journal of the Operational
Research Society, 44(4), 361-374. https://doi.org/10.1057/jors.1993.66
Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Joint economic design of production, continuous sampling
inspection and preventive maintenance of a deteriorating production system. International Journal of
Production Economics, 173, 184-198. https://doi.org/10.1016/j.ijpe.2015.12.016
Chakraborty, T., Giriand, B.C., & Chaudhuri, K.S. (2008). Production lot sizing with process deterioration
and machine breakdown. European Journal of Operational Research, 185(2), 606-618.
https://doi.org/10.1016/j.ejor.2007.01.011
Chakraborty, T., Giriand, B.C., & Chaudhuri, K.S. (2009). Production lot sizing with process deterioration
and machine breakdown under inspection schedule. Omega, 37(2), 257-271.
https://doi.org/10.1016/j.omega.2006.12.001
Fitouhi, M.C., & Nourelfath, M. (2014). Integrating noncyclical preventive maintenance scheduling and
production planning for multi-state systems. Reliability Engineering and System Safety, 121(1), 175-186.
https://doi.org/10.1016/j.ress.2013.07.009
Fu, B., Wang, W., & Shi, X. (2012). A risk analysis based on a two-stage delayed diagnosis regression
model with application to chronic disease progression. European Journal of Operational Research, 218(3),
847-855. https://doi.org/10.1016/j.ejor.2011.12.013
Giri, B.C., & Dohi, T. (2004). Optimal lot sizing for an unreliable production system based on net
present value approach. International Journal of Production Economics, 92(2), 157-167.
https://doi.org/10.1016/j.ijpe.2003.10.011
Jafari, L., & Makis, V. (2015). Joint optimal lot sizing and preventive maintenance policy for a production
facility subject to condition monitoring. International Journal of Production Economics, 169(19), 156-168.
https://doi.org/10.1016/j.ijpe.2015.07.034Jafari, L., & Makis, V. (2016). Optimal lot-sizing and maintenance policy for a partially observable
production system. Computers & Industrial Engineering, 93, 88-98. https://doi.org/10.1016/j.cie.2015.12.009
Lee, S.D., & Rung, J.M. (2000). Production lot sizing in failure prone two-stage serial systems. European
Journal of Operational Research, 123(1), 42-60. https://doi.org/10.1016/S0377-2217(99)00089-2
Liu, X., Wang, W., & Peng, R. (2015a). An integrated production, inventory and preventive maintenance
model for a multi-product production system. Reliability Engineering and System Safety, 137(2), 76-86.
https://doi.org/10.1016/j.ress.2015.01.002
Liu, X., Wang, W., & Peng, R. (2015b). An Integrated Production and Delay-time based Preventive
Maintenance Planning Model for a Multi-product Production System. Eksploatacja i Niezawodnosc –
Maintenance and reliability, 17(2), 215-221. https://doi.org/10.17531/ein.2015.2.7
Sami, E.F. (2008). Economic production lot-sizing for an unreliable machine under imperfect age-based
maintenance policy. European Journal of Operational Research, 186(1), 150-163.
https://doi.org/10.1016/j.ejor.2007.01.035
Wang, W. (2012). An overview of the recent advances in delay-time-based maintenance modeling.
Reliability Engineering and System Safety, 106(5), 165-178. https://doi.org/10.1016/j.ress.2012.04.004
Wang, W., & Banjevic, D. (2012). Ergodicity of forward times of the renewal process in a block-based
inspection model using the delay-time concept. Reliability Engineering and System Safety, 100(2): 1-7.
https://doi.org/10.1016/j.ress.2011.12.011
Wang, W., Banjevic, D., & Pecht, M. (2010). A multi-component and multi-failure mode inspection model
based on the delay-time concept. Reliability Engineering and System Safety, 95(8), 912-920.
https://doi.org/10.1016/j.ress.2010.04.004
Wu, S., & Wang, W. (2011). Optimal inspection policy for three-state systems monitored by control charts.
Applied Mathematics and Computation, 217(23), 9810-9819. https://doi.org/10.1016/j.amc.2011.04.075
Thank you for copying data from http://www.arastirmax.com