You are here

Ethical and Psychological Factors in 5S and Total Productive Maintenance

Journal Name:

Publication Year:

DOI: 
doi.org/10.3926/jiem.2313
Abstract (2. Language): 
Purpose: The purpose of this paper is to investigate the role of ethical and psychological factors in the implementation of 5S and TPM at cement plants in Kurdistan Region of Iraq. Design/methodology/approach: The mixed methods represented in a questionnaire survey and semi-structured interviews for data collection in the framework of the case study were chosen. The questionnaire survey already has been tested. Findings: The findings of this paper revealed that ethical factors had a larger role than psychological factors in the implementation. Thus, based on the findings, organisations are recommended to provide financial and moral support to employees to enable a comprehensive implementation of 5S and TPM aimed at obtaining the desired results. Originality/value: The current paper tried to introduce a new theoretical contribution by filling the gap in the literature regarding the important role that can be played by ethical and psychological factors of employees in the successful implementation of contemporary techniques, such as 5S and TPM in industrial organizations. This is contrary to what was done most of the previous studies such as Ahuja and Khamba (2008b), Panneerselvam (2012), Singh, Gohil, Shah and Desai (2013) and Poduval and Pramod (2015) in the area of 5S and TPM. Where, these studies have focused on studying the other factors such as (organizational, technological, operational and others) in implementing 5S and TPM. This without realizing the fact that it is also necessary to examine factors such as (ethical and psychological) that would affect the capabilities and employee morale before and during the implementation of those techniques (5S and TPM) that are used to bring out the best productivity.
444
475

REFERENCES

References: 

Ahuja, I.P.S., & Khamba, J.S. (2008a). Total Productive Maintenance: Literature Review and Directions.
International Journal of Quality and Reliability Management, 25(7), 709-756.
https://doi.org/10.1108/02656710810890890
Ahuja, I.P.S., & Khamba, J.S. (2008b). Strategies and Success Factors for Overcoming Challenges in TPM
Implementation in Indian Manufacturing Industry. Journal of Quality in Maintenance Engineering, 14(2),
123-147. https://doi.org/10.1108/13552510810877647
Ananthanarayanan, K.R.M. (2006). Application of 5S Management System in NDE Laboratory. In
National Seminar on Non-Destructive Evaluation, 7-9 December, 2006.
Ansari, A., & Modarress, B. (1997). World-class strategies for safety: a Boeing approach. International
Journal of Operations & Production Management, 17(4), 389-398. https://doi.org/10.1108/01443579710159978
Arashpour, M.R., Enaghani, M.R., & Karimi, M. (2009). The Relationship between Lean and TPM (Master’s
thesis, University of Borås, Borås, Sweden). Available online at:
http://bada.hb.se/bitstream/2320/5630/1/Arashpour,%20Enaghani,Karimi.pdf
Aspinwall, E., & Elgharib, M. (2013). TPM Implementation in Large and Medium Size Organisations.
Journal of Manufacturing Technology Management, 24(5), 688-710. https://doi.org/10.1108/17410381311327972
Attri, R., Grover, S., Dev, N., & Kumar, D. (2013). An ISM approach for modelling the enablers in the
implementation of Total Productive Maintenance (TPM). International Journal of System Assurance
Engineering and Management, 4(4), 313-326. https://doi.org/10.1007/s13198-012-0088-7
Bayo-Moriones, A., Bello-Pintado, A., & Merino-Díaz de Cerio, J. (2010). 5S Use in Manufacturing Plants:
Contextual Factors and Impact on Operating Performance. International Journal of Quality and Reliability
Management, 27(2), 217-230. https://doi.org/10.1108/02656711011014320
Becker, S., Bryman, A., & Ferguson, H. (2012). Understanding research for social policy and social work: themes,
methods and approaches. Chicago, USA: The Policy Press.
Boca, G.D. (2011). Kaizen Methodology in Quality Management to Reduce Wastes. Studia Universitatis
Vasile Goldiş, Arad-Seria Ştiinţe Economice, 21(1), 375-381.
Bonavia, T., & Marin-Garcia, J.A. (2011). Integrating Human Resource Management into Lean
Production and their Impact on Organizational Performance. International Journal of Manpower, 32(8),
923-938. https://doi.org/10.1108/01437721111181679
Brah, S.A., & Chong, W.K. (2004). Relationship Between Total Productive Maintenance and Performance.
International Journal of Production Research, 42(12), 2383-2401. https://doi.org/10.1080/00207540410001661418Chan, F.T.S., Lau, H.C.W., Ip, R.W.L., Chan, H.K., & Kong, S. (2005). Implementation of Total
Productive Maintenance: A Case Study. International Journal of Production Economics, 95(1), 71-94.
https://doi.org/10.1016/j.ijpe.2003.10.021
Cohen, S., & Eimicke, W. (2003). The effective public manager: Achieving success in a changing government. San
Francisco, USA: John Wiley & Sons.
Cua, K.O., McKone-Sweet, K.E., & Schroeder, R.G. (2006). Improving performance through an
integrated manufacturing program. The Quality Management Journal, 13(3), 45-60.
Da Silveira, G.J.C. (2006). Effects of Simplicity and Discipline on Operational Flexibility: an Empirical
Reexamination of the Rigid Flexibility Model. Journal of Operations Management, 24(6), 932-947.
https://doi.org/10.1016/j.jom.2005.11.004
Dennis, P. (2016). Lean Production simplified: A plain-language guide to the world’s most powerful production system.
CRC Press, Taylor & Francis Group.
Dhindsa, J.S. (2012). The Effects Of Lean Intervention (5S) On Perceived Musculoskeletal Workload
And Perceived Hazardous Working Conditions In A Health Center Pharmacy. Working paper. University
of Pune, India.
Esain, A., Williams, S., & Massey, L. (2008). Combining planned and emergent change in a healthcare lean
transformation. Public Money and Management, 28(1), 21-26.
Eswaramoorthi, M., Kathiresan, G.R., Prasad, P.S.S., & Mohanram, P.V. (2011). A survey on lean practices
in Indian machine tool industries. The International Journal of Advanced Manufacturing Technology, 52(9-12),
1091-1101. https://doi.org/10.1007/s00170-010-2788-y
Eti, M.C., Ogaji, S.O.T., & Probert, S.D. (2006). Development and Implementation of
Preventive-Maintenance Practices in Nigerian Industries. Applied Energy, 83(10), 1163-1179.
https://doi.org/10.1016/j.apenergy.2006.01.001
Gajdzik, B. (2009). Introduction of Total Productive Maintenance in Steelworks Plants. Metalurgija, 48(2),
137-140.
Gapp, R., Fisher, R., & Kobayashi, K. (2008). Implementing 5S within a Japanese Context: An Integrated
Management System. Management Decision, 46(4), 565-579. https://doi.org/10.1108/00251740810865067
Ginbey, A. (2013). Reducing HiSeq Setup Times in Genomic Services Laboratory with 5S: Implications
for Productivity and Quality. Working paper. California State University, San Marcos.
Ginder, A., Robinson, A., & Robinson, C.J. (1995). Implementing TPM: The North American Experience. USA:
Productivity Press.Graham, J.W. (1986). Principled organizational dissent: A theoretical essay. Research in organizational behavior,
8, 1-52.
Graisa, M., & Al-Habaibeh, A. (2011). An investigation into current production challenges facing the
Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy.
Journal of Manufacturing Technology Management, 22(4), 541-558. https://doi.org/10.1108/17410381111126445
Haddad, T.H., & Jaaron, A.A. (2012). The Applicability of Total Productive Maintenance for Healthcare
Facilities: An Implementation Methodology. International Journal of Business, Humanities and Technology, 2(2),
148-155.
Haroun, A.E., & Duffuaa, S.O. (2009). Maintenance Organization. In Handbook of Maintenance Management
and Engineering (pp. 3-15). London: Springer. https://doi.org/10.1007/978-1-84882-472-0_1
Hayes, R.H., & Pisano, G.P. (1994). Beyond world-class: the new manufacturing strategy. Harvard business
review, 72(1), 77-86.
Hegde, H.G., Mahesh, N.S., & Doss, K. (2009). Overall Equipment Effectiveness Improvement by TPM
and 5S Techniques in a CNC Machine Shop. SaSTech, 8(2), 25-32.
Ho, S.K., & Cicmil, S. (1996). Japanese 5-S Practice. The TQM Magazine, 8(1), 45-53.
https://doi.org/10.1108/09544789610107261
Hutchins, C.B. (2007). Five “S” Improvement System: An Assessment of Employee Attitudes and Productivity
Improvements. USA: ProQuest.
Idris, T. (2001). Entrance Modern in the Administration. College of Management and Economics. Iraq:
University House for Publication and Distribution, University of Baghdad.
Ireland, F., & Dale, B.G. (2001). A Study of Total Productive Maintenance Implementation. Journal of
Quality in Maintenance Engineering, 7(3), 183-192. https://doi.org/10.1108/13552510110404495
Jadhav, J.R., Mantha, S.S., & Rane, S.B. (2014). Exploring Barriers in Lean Implementation. International
Journal of Lean Six Sigma, 5(2), 122-148. https://doi.org/10.1108/IJLSS-12-2012-0014
Jain, A., Bhatti, R., Deep, H.S., & Sharma, S.K. (2012). Implementation of TPM for Enhancing OEE of
Small Scale Industry. International Journal of IT, Engineering and Applied SciencesResearch, 1(1), 125-136.
Karim, A., & Arif-Uz-Zaman, K. (2013). A methodology for effective implementation of lean strategies
and its performance evaluation in manufacturing organizations. Business Process Management Journal, 19(1),
169-196. https://doi.org/10.1108/14637151311294912
Kennedy, R., & Mazza, L. (2010). 5S and TPM: Working Together as One in TPM3. CTPM. Australasia.Khamis, N., Abrahman, M.N., Jamaludin, K.R., Ismail, A.R., Ghani, J.A., & Zulkifli, R. (2009).
Development of 5S Practice Checklist for Manufacturing Industry. In Proceedings of the World Congress on
Engineering, London, U.K. 978-988.
Kholopane, P. (2016). The Effect of the Implementation of Six Sigma in Reducing Obsolete Stock and
Controlling Stock Inventory at a Flavor Manufacturing Company: A Case Study. In Proceedings of the
International MultiConference of Engineers and Computer Scientists (Vol. 2).
Krejcie, R.V., & Morgan, D.W. (1970). Determining Sample Size for Research Activities. Educational and
Psychological Measurements, 30, 607-610. https://doi.org/10.1177/001316447003000308
Kumar, M. (2007). Critical Success Factors and Hurdles to Six Sigma Implementation: The Case of a UK
Manufacturing SME. International Journal of Six Sigma and Competitive Advantage, 3(4), 333-351.
https://doi.org/10.1504/IJSSCA.2007.017176
Kumar, J., Soni, V.K., & Agnihotri, G. (2014). Impact of TPM Implementation on Indian Manufacturing
Industry. International Journal of Productivity and Performance Management, 63(1), 44-56.
https://doi.org/10.1108/IJPPM-06-2012-0051
Lemma, E. (2008). Implementation of TPM (Total Productive Maintenance) in Ethiopian Textile
Industries. Doctoral dissertation. Addis Ababa University.
McKone, K.E., Schroeder, R.G., & Cua, K.O. (2001). The Impact of Total Productive Maintenance
Practices on Manufacturing Performance. Journal of Operations Management, 19(1), 39-58.
https://doi.org/10.1016/S0272-6963(00)00030-9
Michalska, J., & Szewieczek, D. (2007). The 5S Methodology as a Tool for Improving the Organization.
Journal of Achievements in Materials and Manufacturing Engineering, 24(2), 211-214.
Moradi, M., Abdollahzadeh, M.R., & Vakili, A. (2011). Effects of Implementing 5S on Total Productive
Maintenance: A Case in Iran. Proceedings of the IEEE ICQR. https://doi.org/10.1109/ICQR.2011.6031678
Moulding, E. (2010). 5S: A Visual Control System for the Workplace. UK: Author House.
Mullins, L.J. (2007). Management and Organisational Behaviour. England: Pearson Education.
Nachiappan, R.M., & Anantharaman, N. (2006). Evaluation of Overall Line Effectiveness (OLE) in a
Continuous Product Line Manufacturing System. Journal of Manufacturing Technology Management, 17(7),
987-1008. https://doi.org/10.1108/17410380610688278
Nahm, A.Y., Lauver, K.J., & Keyes, J.P. (2012). The Role of Workers’ Trust and Perceived Benefits in
Lean Implementation Success. International Journal of Business Excellence, 5(5), 463-484.
https://doi.org/10.1504/IJBEX.2012.048798Nelson-Raja, P., Kannan, S.M., & Jeyabalan, V. (2010). Overall Line Effectiveness–A Performance
Evaluation Index of a Manufacturing System. International Journal of Productivity and Quality Management,
5(1), 38-59. https://doi.org/10.1504/IJPQM.2010.029508
Ngugi, K. (2015). Total productive maintenance practices and equipment effectiveness: a case study of
Bamburi cement limited. Doctoral dissertation. University of Nairobi.
Panneerselvam, R. (2012). Production and operations management. New Delhi, India: PHI Learning Pvt. Ltd.
Paropate, R.V., Jachak, S.R., & Hatwalne, P.A. (2011). Implementing approach of total productive
maintenance in Indian industries & theoretical aspect: An overview. Ijaest-International Journal of Advanced
Engineering Sciences and Technologies, 1(6), 270-279.
Poduval, P.S., & Pramod, V.R. (2015). Interpretive structural modeling (ISM) and its application in
analyzing factors inhibiting implementation of total productive maintenance (TPM). International Journal
of Quality & Reliability Management, 32(3), 308-331. https://doi.org/10.1108/IJQRM-06-2013-0090
Pramod.V.R. (2007). MQFD: A Model for Synergizing TPM and QFD. Graduate thesis. Cochin University
of Science and Technology.
Rahman, M.N.A., Khamis, N.K., Zain, R.M., Deros, B.M., & Mahmood, W.H.W. (2010). Implementation
of 5S practices in the manufacturing companies: A case study. American Journal of Applied Sciences, 7(8),
1182-1189. https://doi.org/10.3844/ajassp.2010.1182.1189
Ramayah, T., Jantan, M., & Hassan, M.M. (2002). Change management and implementation of Total
Productive Maintenance: An exploratory study of Malaysian manufacturing companies. Utara
Management Review, 3(1), 1-17.
Rolfsen, M. (2014). A blueprint paradox: Successful but unintended cross-national translation of total
productive maintenance. Journal of Quality in Maintenance Engineering, 20(4), 402-414.
https://doi.org/10.1108/JQME-07-2012-0024
Rolfsen, M., & Langeland, C. (2012). Successful maintenance practice through team autonomy. Employee
Relations, 34(3), 306-321. https://doi.org/10.1108/01425451211217725
Roziana, A.N. (2011). 5S Implementation And People Involvement At Muehlbaeur Technologies Sdn.
Bhd. Thesis. Universiti Teknikal Malaysia Melaka.
Sahu, H., Batham, J.M., & Bangar, A. (2012). Implementating Total Productive Maintance In Jamna Auto
Industry Malanpur. International Journal of Engineering Research and Technology, 1(9), 1-5.
Sekaran, U., & Bougie, R.J. (2016). Research methods for business: A skill building approach. UK: John Wiley &
Sons Ltd.Seth, D., & Tripathi, D. (2005). Relationship between TQM and TPM implementation factors and
business performance of manufacturing industry in Indian context. International Journal of Quality &
Reliability Management, 22 (3), 256-277. https://doi.org/10.1108/02656710510582480
Singh, R., Gohil, A.M., Shah, D.B., & Desai, S. (2013). Total productive maintenance (TPM)
implementation in a machine shop: A case study. Procedia Engineering, 51, 592-599.
https://doi.org/10.1016/j.proeng.2013.01.084
Sousa, R., & Voss, C.A. (2008). Contingency research in operations management practices. Journal of
Operations Management, 26(6), 697-713. https://doi.org/10.1016/j.jom.2008.06.001
Suzuki, T. (1994). TPM in process industries. New York, USA: Productivity Press.
Trevino, L.K., & Nelson, K.A. (2010). Managing business ethics. USA: John Wiley & Sons.
Ulrich, D., Zenger, J., & Smallwood, N. (2013). Results-based leadership. USA: Harvard Business Press.
Van Patten, J. (2006). A second look at 5S. Quality progress, 39(10), 55-59.
Venkatesh, J. (2007). An introduction to total productive maintenance (TPM). Available at: http://www.plant
maintenance.com/articles/tpm_intro.shtml/ (Accessed: December 2016).
Wagel, W.H. (1990). On The Horizon: Human Resources. New York, USA: Force press.
Warwood, S.J., & Knowles, G. (2004). An investigation into Japanese 5-S practice in UK industry. The
TQM Magazine, 16(5), 347-353. https://doi.org/10.1108/09544780410551287
Westphal, J.D., Gulati, R., & Shortell, S.M. (1997). Customization or conformity? An institutional and
network perspective on the content and consequences of TQM adoption. Administrative Science Quarterly,
42(2), 366-394. https://doi.org/10.2307/2393924

Thank you for copying data from http://www.arastirmax.com