Abstract (2. Language): 
Purpose: The article focuses on supply capability creation (SCC) within the new product development (NPD). The purpose is to establish an SCC process describing the main SCC activities and milestone criteria in preparing the supply process for new products Design/methodology/approach: The article analyses the earlier research, carries out current state analysis of six case companies regarding the SCC areas and proposes an SCC process. Findings: The developed SCC process aims at preparing the operational supply capability for a developed new product based on the preferred, qualified and contracted suppliers and materials along the NPD process, and ultimately at the product ramp-up. Originality/value: This paper introduces an SCC process that has not been presented earlier in the literature, highlighting the important role of the SCC for successful product ramp-ups.
495
521

REFERENCES

References: 

Ahmed, P.K, & Rafiq, M. (2002). Internal Marketing: Tools and Concepts for Customer Focused Management.
Oxford: Butterworth-Heinemann. https://doi.org/10.1016/B978-0-7506-4838-7.50006-5
Almgren, H. (1999). Towards a framework for analyzing efficiency during start-up: An empirical
investigation of a Swedish auto manufacturer. International Journal of Production Economics, 60, 79-86.
https://doi.org/10.1016/S0925-5273(98)00189-3
Anthony, M.T., & McKay, J. (1992). From experience: balancing the product development process:
achieving product and cycle-time excellence in high-technology industries. Journal of Product Innovation
Management, 9(2), 140-147. https://doi.org/10.1016/0737-6782(92)90005-W
Ball, P.D., Roberts, S., Natalicchio, A., & Scorzafave, C. (2011). Modelling production ramp-up of
engineering products. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of
Engineering Manufacture, 225(6), 959-971. https://doi.org/10.1177/09544054JEM2071
Barczak, G., & Kahn, K.B. (2012). Identifying new product development best practice. Business horizons,
55(3), 293-305. https://doi.org/10.1016/j.bushor.2012.01.006
Barczak, G., Griffin, A., & Kahn, K.B. (2009). Perspective: trends and drivers of success in NPD
practices: results of the 2003 PDMA best practices study. Journal of product innovation management, 26(1),
3-23. https://doi.org/10.1111/j.1540-5885.2009.00331.x
Barczak, G., Kahn, K.B., & Moss, R. (2006). An exploratory investigation of NPD practices in nonprofit
organizations. Journal of Product Innovation Management, 23(6), 512-527. https://doi.org/10.1111/j.1540-
5885.2006.00221.x
Behncke, F.G., Eichinger, J., & Lindemann, U. (2014). Involvement of Procurement in the Product
Creation Process: A Systematization Scheme of Measures. Procedia CIRP, 17, 356-361.
https://doi.org/10.1016/j.procir.2014.01.078
Bernard, A., & Fischer, A. (2002). New trends in rapid product development. CIRP Annals-Manufacturing
Technology, 51(2), 635-652. https://doi.org/10.1016/S0007-8506(07)61704-1Bhuiyan, N. (2011). A framework for successful new product development. Journal of Industrial Engineering
and Management, 4(4), 746-770. https://doi.org/10.3926/jiem.334
Brewer, B., & Arnette, A.N. (2017). Design for procurement: What procurement driven design initiatives
result in environmental and economic performance improvement? Journal of Purchasing and Supply
Management, 23(1), 28-39. https://doi.org/10.1016/j.pursup.2016.06.003
Brewer, B.L., Ashenbaum, B., & Carter, J.R. (2013). Understanding the supply chain outsourcing cascade:
when does procurement follow manufacturing out the door? Journal of Supply Chain Management, 49(3),
90-110. https://doi.org/10.1111/jscm.12021
Burt, D.N., & Pinkerton, R.L. (1996) A Purchasing Manager’s Guide to Strategic Proactive Procurement, New
York, NY: AMACOM Books.
Caniato, F., & Größler, A. (2015). The moderating effect of product complexity on new product
development and supply chain management integration. Production Planning & Control, 26(16), 1306-1317.
https://doi.org/10.1080/09537287.2015.1027318
Carr, A.S., Kaynak, H., Hartley, J.L., & Ross, A. (2008). Supplier dependence: impact on supplier's
participation and performance. International Journal of Operations & Production Management, 28(9), 899-916.
https://doi.org/10.1108/01443570810895302
Carrillo, J.E., & Franza, R.M. (2006). Investing in product development and production capabilities: The
crucial linkage between time-to-market and ramp-up time. European Journal of Operational Research, 171(2),
536-556. https://doi.org/10.1016/j.ejor.2004.08.040
Chen, J., Damanpour, F., & Reilly, R.R. (2010). Understanding antecedents of new product development
speed: A meta-analysis. Journal of Operations Management, 28(1), 17-33.
https://doi.org/10.1016/j.jom.2009.07.001
Chen, J., Reilly, R.R., & Lynn, G.S. (2005). The impacts of speed-to-market on new product success: the
moderating effects of uncertainty. IEEE Transactions on engineering management, 52(2), 199-212.
https://doi.org/10.1109/TEM.2005.844926
Cheng, Y., Skov Madsen, E., & Liangsiri, J. (2010). Transferring knowledge in the relocation of
manufacturing units. Strategic Outsourcing: An International Journal, 3(1), 5-19.
https://doi.org/10.1108/17538291011023043
Choi, T.Y., & Krause, D.R. (2006). The supply base and its complexity: Implications for transaction costs,
risks, responsiveness, and innovation. Journal of Operations Management, 24(5), 637-652.
https://doi.org/10.1016/j.jom.2005.07.002Cooper, R.G. (2001). Winning at new products – Accelerating the process from idea to launch. 3rd ed. Cambridge:
Perseus Publishing.
Cooper, R.G., Edgett, S.J., & Kleinschmidt, E.J. (2004). Benchmarking best NPD practices-III.
Research-Technology Management, 47(6), 43-55.
Dobler, D.W., & Burt, D.N. (1996) Purchasing and Supply Management. New York: McGraw-Hill.
Dereli, T., Baykasoglu, A., & Buyukozkan, G. (2008). An affordable reverse engineering framework for
innovative rapid product development. International Journal of Industrial and Systems Engineering, 3(1), 31-37.
https://doi.org/10.1504/IJISE.2008.015912
Eisenhardt, K.M. (1989). Building theories from case study research. Academy of management review, 14(4),
532-550. https://doi.org/10.5465/AMR.1989.4308385
Ellram, L.M., & Carr, A. (1994). Strategic purchasing: a history and review of the literature. Journal of
Supply Chain Management, 30(1), 9-19. https://doi.org/10.1111/j.1745-493X.1994.tb00185.x
Elstner, S., & Krause, D. (2014). Methodical approach for consideration of ramp-up risks in the product
development of complex products. Procedia CIRP, 20, 20-25. https://doi.org/10.1016/j.procir.2014.05.027
Gebauer, J., & Scharl, A. (1999). Between flexibility and automation: an evaluation of web technology
from a business process perspective. Journal of Computer‐Mediated Communication, 5(2).
https://doi.org/10.1111/j.1083-6101.1999.tb00340.x
Gehani, R.R. (1992). Concurrent product development for fast-track corporations. Long Range Planning,
25(6), 40-47. https://doi.org/10.1016/0024-6301(92)90168-2
Goffin, K., Szwejczewski, M., & New, C. (1997). Managing suppliers: when fewer can mean more.
International Journal of Physical Distribution & Logistics Management, 27(7), 422-436.
https://doi.org/10.1108/09600039710188486
Goodchild, A., Herring, C., & Milosevic, Z. (2000) Business contracts for B2B. Proceedings of the CAISE’00
Workshop on Infrastructure for Dynamic Business-to-Business Service Outsourcing, Stockholm
(SWEDEN), 5-6 June, 2000.
Grieger, M. (2003). Electronic marketplaces: A literature review and a call for supply chain management
research. European journal of operational research, 144(2), 280-294. https://doi.org/10.1016/S0377-2217(02)00394-
6
Haller, M., Peikert, A., & Thoma, J. (2003). Cycle time management during production ramp-up. Robotics
and Computer-Integrated Manufacturing, 19(1), 183-188. https://doi.org/10.1016/S0736-5845(02)00078-9Hillebrand, B., & Biemans, W.G. (2004). Links between internal and external cooperation in product
development: an exploratory study. Journal of Product Innovation Management, 21(2), 110-122.
https://doi.org/10.1111/j.0737-6782.2004.00061.x
Hilletofth, P., Ericsson, D., & Lumsden, K. (2010). Coordinating new product development and supply
chain management. International Journal of Value Chain Management, 4(1-2), 170-192.
https://doi.org/10.1504/IJVCM.2010.031808
Hüntelmann, J., Reinsch, S., & Märtens, A. (2007). Logistic-and cost-oriented cross-company ramp-up
planning. In Digital Enterprise Technology (pp. 115-122). Springer US. https://doi.org/10.1007/978-0-387-49864-
5_13
Jack, E.P., & Powers, T.L. (2015). Managing strategic supplier relationships: antecedents and outcomes.
Journal of Business & Industrial Marketing, 30(2), 129-138. https://doi.org/10.1108/JBIM-08-2011-0101
Kärkkäinen, H., Piippo, P., & Tuominen, M. (2001). Ten tools for customer-driven product development
in industrial companies. International journal of production economics, 69(2), 161-176.
https://doi.org/10.1016/S0925-5273(00)00030-X
Kahn, K.B., Barczak, G., Nicholas, J., Ledwith, A., & Perks, H. (2012). An examination of new product
development best practice. Journal of Product Innovation Management, 29(2), https://doi.org/10.1111/j.1540-
5885.2011.00888.x
Kim, J.I., & Shunk, D.L. (2004). Matching indirect procurement process with different B2B
e-procurement systems. Computers in Industry, 53(2), 153-164. https://doi.org/10.1016/j.compind.2003.07.002
Kim, S.W. (2006). The effect of supply chain integration on the alignment between corporate competitive
capability and supply chain operational capability. International Journal of Operations & Production
Management, 26(10), 1084-1107. https://doi.org/10.1108/01443570610691085
Koufteros, X.A., Vonderembse, M.A., & Doll, W.J. (2002). Integrated product development practices and
competitive capabilities: the effects of uncertainty, equivocality, and platform strategy. Journal of
Operations Management, 20(4), 331-355. https://doi.org/10.1016/S0272-6963(02)00018-9
Kraut, R., Steinfield, C., Chan, A., Butler, B., & Hoag, A. (1998). Coordination and virtualization: The role
of electronic networks and personal relationships. Journal of Computer‐Mediated Communication, 3(4).
https://doi.org/10.1111/j.1083-6101.1998.tb00084.x
Lakemond, N., Echtelt, F., & Wynstra, F. (2001). A configuration typology for involving purchasing
specialists in product development. Journal of Supply Chain Management, 37(3), 11-20.
https://doi.org/10.1111/j.1745-493X.2001.tb00108.xLiker, J. (2004). Toyota Way. New York: McGraw-Hill.
Lindemann, M.A., & Schmid, B.F. (1998). Framework for specifying, building, and operating electronic
markets. International Journal of Electronic Commerce, 3(2), 7-21. https://doi.org/10.1080/10864415.1998.11518331
Lummus, R.R., & Vokurka, R.J. (1999). Defining supply chain management: a historical perspective and
practical guidelines. Industrial Management & Data Systems, 99(1), 11-17.
https://doi.org/10.1108/02635579910243851
Luzzini, D., Amann, M., Caniato, F., Essig, M., & Ronchi, S. (2015). The path of innovation: purchasing
and supplier involvement into new product development. Industrial Marketing Management, 47, 109-120.
https://doi.org/10.1016/j.indmarman.2015.02.034
Marsillac, E., & Roh, J.J. (2014). Connecting product design, process and supply chain decisions to
strengthen global supply chain capabilities. International Journal of Production Economics, 147, 317-329.
https://doi.org/10.1016/j.ijpe.2013.04.011
McGinnis, M.A., & Vallopra, R.M. (1999). Purchasing and supplier involvement: issues and insights
regarding new product success. Journal of Supply Chain Management, 35(2). https://doi.org/10.1111/j.1745-
493X.1999.tb00057.x
McIvor, R., Humphreys, P., & Cadden, T. (2006). Supplier involvement in product development in the
electronics industry: a case study. Journal of Engineering and Technology Management, 23(4), 374-397.
https://doi.org/10.1016/j.jengtecman.2006.08.006
Minderhoud, S., & Fraser, P. (2005). Shifting paradigms of product development in fast and dynamic
markets. Reliability Engineering & System Safety, 88(2), 127-135. https://doi.org/10.1016/j.ress.2004.07.002
Monczka, R.M., Handfield, R.B., Giunipero, L.C., & Patterson, J.L. (2015). Purchasing and supply-chain
management. 6th ed. Boston MA: Cengage Learning.
Nijssen, E.J., Biemans, W.G., & De Kort, J.F. (2002). Involving purchasing in new product development.
R&D Management, 32(4), 281-289. https://doi.org/10.1111/1467-9310.00260
Otto, K., & Wood, K. (2001). Product design: techniques in reverse engineering and new product design. Upper Saddle
River, NJ: Prentice-Hall.
Pahl, G., & Beitz, W. (2013). Engineering design: a systematic approach. Berlin: Springer Science & Business
Media.
Pero, M., Abdelkafi, N., Sianesi, A., & Blecker, T. (2010). A framework for the alignment of new product
development and supply chains. Supply Chain Management: An International Journal, 15(2), 115-128.
https://doi.org/10.1108/13598541011028723Petersen, K.J., Handfield, R.B., & Ragatz, G.L. (2005). Supplier integration into new product
development: coordinating product, process and supply chain design. Journal of operations management,
23(3), 371-388. https://doi.org/10.1016/j.jom.2004.07.009
Pooler, V.H., Pooler, D.J., & Farney, S.D. (2007). Global purchasing and supply management: Fulfill the vision. 2nd
ed. New York, NY: Springer Science & Business Media.
Pufall, A., Fransoo, J.C., & de Kok, A.G. (2007). What determines product ramp-up performance?: A review of
characteristics based on a case study at Nokia Mobile Phones. BETA Publicatie: Working Paper, No. 228.
Technische Universiteit Eindhoven, Netherlands.
Pufall, A., Fransoo, J.C., de Jong, A., & de Kok, T. (2012). The impact of product complexity on ramp-up
performance. Working paper, Beta publicatie, Eindhoven University of Technology, Netherlands.
Ragatz, G.L., Handfield, R.B., & Scannell, T.V. (1997). Success factors for integrating suppliers into new
product development. Journal of product innovation management, 14(3), 190-202. https://doi.org/10.1016/S0737-
6782(97)00007-6
Salvador, F., Forza, C., & Rungtusanatham, M. (2002). Modularity, product variety, production volume,
and component sourcing: theorizing beyond generic prescriptions. Journal of Operations Management,
20(5), 549-575. https://doi.org/10.1016/S0272-6963(02)00027-X
Scharl, A., Gebauer, J., & Bauer, C. (2001). Matching process requirements with information technology
to assess the efficiency of web information systems. Information Technology and Management, 2(2), 193-210.
https://doi.org/10.1023/A:1011465618993
Schmidt, J.B., Sarangee, K.R., & Montoya, M.M. (2009). Exploring new product development project
review practices. Journal of Product Innovation Management, 26(5), 520-535. https://doi.org/10.1111/j.1540-
5885.2009.00678.x
Selldin, E., & Olhager, J. (2007). Linking products with supply chains: testing Fisher's model. Supply Chain
Management: An International Journal, 12(1), 42-51. https://doi.org/10.1108/13598540710724392
Shamsuzzoha, A.H.M., Takala, J., & Helo, P.T. (2010). Strategic outsourcing: status and prospects in global
product development processes. International Journal of Management and Enterprise Development, 9(1), 30-42.
https://doi.org/10.1504/IJMED.2010.035306
Shepherd, C., & Ahmed, P.K. (2000). NPD frameworks: a holistic examination. European Journal of
Innovation Management, 3(3), 160-173. https://doi.org/10.1108/14601060010341166
Skjøtt-Larsen, T., Kotzab, H., & Grieger, M. (2003). Electronic marketplaces and supply chain
relationships. Industrial Marketing Management, 32(3), 199-210. https://doi.org/10.1016/S0019-8501(02)00263-8Spina, G., Caniato, F., Luzzini, D., & Ronchi, S. (2013). Past, present and future trends of purchasing and
supply management: An extensive literature review. Industrial Marketing Management, 42(8), 1202-1212.
https://doi.org/10.1016/j.indmarman.2013.04.001
Stauder, J., Buchholz, S., Klocke, F., & Mattfeld, P. (2014). A new framework to evaluate the process
capability of production technologies during production ramp-up. Procedia CIRP, 20, 126-131.
https://doi.org/10.1016/j.procir.2014.05.043
Su, J., & Gargeya, V.B. (2012). Strategic sourcing, sourcing capability and firm performance in the US
textile and apparel industry. Strategic Outsourcing: An International Journal, 5(2), 145-165.
https://doi.org/10.1108/17538291211257592
Surbier, L., Alpan, G., & Blanco, E. (2014). A comparative study on production ramp-up: state-of-the-art
and new challenges. Production Planning & Control, 25(15), 1264-1286.
https://doi.org/10.1080/09537287.2013.817624
Swafford, P.M., Ghosh, S., & Murthy, N. (2006). The antecedents of supply chain agility of a firm: scale
development and model testing. Journal of Operations Management, 24(2), 170-188.
https://doi.org/10.1016/j.jom.2005.05.002
Tan, K.C. (2001). A framework of supply chain management literature. European Journal of Purchasing &
Supply Management, 7(1), 39-48. https://doi.org/10.1016/S0969-7012(00)00020-4
Terwiesch, C., Bohn, R., & Chea, K. (2001). International product transfer and production ramp‐up: a
case study from the data storage industry. R&D Management, 31(4), 435-451. https://doi.org/10.1111/1467-
9310.00230
Tracey, M., Lim, J.S., & Vonderembse, M.A. (2005). The impact of supply-chain management capabilities
on business performance. Supply Chain Management: An International Journal, 10(3), 179-191.
https://doi.org/10.1108/13598540510606232
Trent, R.J. (2007). Strategic supply management: creating the next source of competitive ad-vantage. Fort Lauderdale,
FL: J. Ross Publishing.
Ulrich, K.T., & Eppinger, S.D. (2008). Product Design and Development. 4th ed. New York, NY:
McGraw-Hill.
Um, J., Lyons, A., Lam, H.K., Cheng, T.C.E., & Dominguez-Pery, C. (2017). Product variety management
and supply chain performance: A capability perspective on their relationships and competitiveness
implications. International Journal of Production Economics, 187, 15-26. https://doi.org/10.1016/j.ijpe.2017.02.005Van Echtelt, F.E., Wynstra, F., Van Weele, A.J., & Duysters, G. (2008). Managing supplier involvement in
new product development: a multiple‐case study. Journal of Product Innovation Management, 25(2), 180-201.
https://doi.org/10.1111/j.1540-5885.2008.00293.x
Van Hoek, R., & Chapman, P. (2006). From tinkering around the edge to enhancing revenue growth:
supply chain-new product development. Supply Chain Management: An International Journal, 11(5), 385-389.
https://doi.org/10.1108/13598540610682390
Van Hoek, R., & Chapman, P. (2007). How to move supply chain beyond cleaning up after new product
development. Supply Chain Management: An International Journal, 12(4), 239-244.
https://doi.org/10.1108/13598540710759745
Von Cube, J.P., & Schmitt, R. (2014). Execution of Ramp-up Projects in Day-to-Day Operations through
a Quantitative Risk Management Approach. Procedia CIRP, 20, 26-31.
https://doi.org/10.1016/j.procir.2014.06.143
Wynstra, F., & Ten Pierick, E. (2000). Managing supplier involvement in new product development: a
portfolio approach. European Journal of Purchasing & Supply Management, 6(1), 49-57.
https://doi.org/10.1016/S0969-7012(99)00035-0
Wynstra, F., Weele, A.V., & Axelsson, B. (1999). Purchasing involvement in product development: a
framework. European Journal of Purchasing & Supply Management, 5(3-4), 129-141.
https://doi.org/10.1016/S0969-7012(99)00017-9
Yin, R.K. (2003). Case study research: Design and methods. 3rd ed. Beverly Hills, CA: Sage Publications Inc.
Zsidisin, G.A., & Ellram, L.M. (2001). Activities related to purchasing and supply management
involvement in supplier alliances. International journal of physical distribution & logistics management, 31(9),
629-646. https://doi.org/10.1108/09600030110408143

Thank you for copying data from http://www.arastirmax.com