Purpose: This paper describes the use of simulation and case-study research to assess flexibility gains induced by the adoption of three Lean Manufacturing practices. Design/methodology/approach: We gather useful material and information about the manufacturing process of a selected Small-Medium Enterprise by adopting a case-research approach. The Value Stream Mapping is the method used for visualizing flows of products and information along the production system. Starting from the current arrangement of the company, computer simulation is used to assess the benefits arising from Cellular Manufacturing, Just-in-Time Delivery by Suppliers, and Single Minute Exchange of Dies. Findings: To investigate the flexibility improvements coming from the introduction of Lean Manufacturing, we present a simulation model of the described company on which we performed our analysis. We quantify the flexibility of different configurations according to the new 5-step approach in order to segregate the contribution of different lean techniques. Originality/value: We extend the combined use of Case Research and Computer Simulation to the research on Manufacturing Flexibility within Small-Medium Enterprises. We enhance the knowledge on this under investigated context collecting quantitative field data. Moreover, building on the factorial Design of Experiment, we introduce a new 5-step method to appraise the costbenefit ratio of lean techniques for flexibility. The managerial implication of this research is mostly related to the provision of a supporting method for the decision making process propaedeutic to Lean Manufacturing introduction.
919
945

REFERENCES

References: 

Abdulmalek, F.A., & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and value stream
mapping via simulation: A process sector case study. International Journal of production economics, 107(1),
223-236. https://doi.org/10.1016/j.ijpe.2006.09.009
Abernethy, M.A., & Lillis, A.M. (1995). The impact of manufacturing flexibility on management control
system design. Accounting, Organizations and Society, 20(4), 241-258. https://doi.org/10.1016/0361-
3682(94)E0014-L
Achanga, P., Shehab, E., Roy, R., & Nelder, G. (2006). Critical success factors for lean implementation
within SMEs. Journal of Manufacturing Technology Management, 17(4), 460-471.
https://doi.org/10.1108/17410380610662889
Ansari, A., & Modarress, B. (1988). JIT purchasing as a quality and productivity centre. The International
Journal of Production Research, 26(1), 19-26. https://doi.org/10.1080/00207548808947838
Bakås, O., Govaert, T., & van Landeghem, H. (2011). Challenges and success factors for implementation
of lean manufacturing in European SMES. Paper presented at the 13th International conference on the
Modern Information Technology in the Innovation Processes of the Industrial Enterprise (MITIP).
Bartezzaghi, E., & Turco, F. (1989). The impact of just-in-time on production system performance: An
analytical framework. International Journal of Operations & Production Management, 9(8), 40-62.
https://doi.org/10.1108/EUM0000000001257
Bateman, N. (1999). Measuring the mix response flexibility of manufacturing systems. International Journal
of Production Research, 37(4), 871-880. https://doi.org/10.1080/002075499191571
Bengtsson, J. (2001). Manufacturing flexibility and real options: A review. International Journal of Production
Economics, 74(1), 213-224. https://doi.org/10.1016/S0925-5273(01)00128-1Bernards, J., van Engelen, G., Schrauwen, C., Cramer, H., & Luitjens, S. (1990). Simulation of the
recording process with a VSM on Co-Cr and Co-Ni-O layers deposited at oblique incidence. IEEE
Transactions on Magnetics, 26(5), 2289-2291. https://doi.org/10.1109/20.104700
Boyle, T.A., & Scherrer-Rathje, M. (2009). An empirical examination of the best practices to ensure
manufacturing flexibility: Lean alignment. Journal of Manufacturing Technology Management, 20(3), 348-366.
https://doi.org/10.1108/17410380910936792
Burgess, R.G. (1993). Research methods. Nelson.
Buzacott, J.A., & Mandelbaum, M. (1985). Flexibility and productivity in manufacturing systems. Paper
presented at the Proceedings of the annual IIE Conference.
Cagliano, R., Blackmon, K., & Voss, C. (2001). Small firms under MICROSCOPE: International
differences in production/operations management practices and performance. Integrated Manufacturing
Systems, 12(7), 469-482. https://doi.org/10.1108/EUM0000000006229
Carpinetti, L.C., Gerolamo, M.C., & Dorta, M. (2000). A conceptual framework for deployment of
strategy-related continuous improvements. The TQM Magazine, 12(5), 340-349.
https://doi.org/10.1108/09544780010341950
Crotty, M. (1998). The foundations of social research: Meaning and perspective in the research process. Sage.
Detty, R.B., & Yingling, J.C. (2000). Quantifying benefits of conversion to lean manufacturing with
discrete event simulation: A case study. International Journal of Production Research, 38(2), 429-445.
https://doi.org/10.1080/002075400189509
Feld, W.M. (2000). Lean manufacturing: Tools, techniques, and how to use them. CRC Press.
https://doi.org/10.1201/9781420025538
Gerwin, D. (1993). Manufacturing flexibility: A strategic perspective. Management science, 39(4), 395-410.
https://doi.org/10.1287/mnsc.39.4.395
Gupta, Y.P., & Goyal, S. (1989). Flexibility of manufacturing systems: Concepts and measurements.
European journal of operational research, 43(2), 119-135. https://doi.org/10.1016/0377-2217(89)90206-3
Gurumurthy, A., & Kodali, R. (2011). Design of lean manufacturing systems using value stream mapping
with simulation: A case study. Journal of Manufacturing Technology Management, 22(4), 444-473.
https://doi.org/10.1108/17410381111126409Hallgren, M., & Olhager, J. (2009). Flexibility configurations: Empirical analysis of volume and product
mix flexibility. Omega, 37(4), 746-756. https://doi.org/10.1016/j.omega.2008.07.004
Hammann, J.E., & Markovitch, N.A. (1995). Introduction to Arena [simulation software]. Paper presented
at the Simulation Conference Proceedings. Winter. https://doi.org/10.1109/WSC.1995.478785
Hayes, R.H., & Pisano, G.P. (1994). Beyond world-class: The new manufacturing strategy. Harvard business
review, 72(1), 77-86.
Jeong, K.-Y., & Phillips, D.T. (2011). Application of a concept development process to evaluate process
layout designs using value stream mapping and simulation. Journal of Industrial Engineering and Management,
4(2), 206-230. https://doi.org/10.3926/jiem.2011.v4n2.p206-230
Julie-Yazici, H. (2005). Influence of flexibilities on manufacturing cells for faster delivery using
simulation. Journal of Manufacturing Technology Management, 16(8), 825-841.
https://doi.org/10.1108/17410380510627843
Kelton, W.D. (2002). Simulation with ARENA. McGraw-Hill.
Law, A.M., & Kelton, W.D. (2000). Simulation modeling and analysis. McGraw-Hill.
Lee, S.M., & Ebrahimpour, M. (1984). Just-in-time production system: Some requirements for
implementation. International Journal of operations & production management, 4(4), 3-15.
https://doi.org/10.1108/eb054721
Lewis, M.W. (1998). Iterative triangulation: A theory development process using existing case studies.
Journal of Operations Management, 16(4), 455-469. https://doi.org/10.1016/S0272-6963(98)00024-2
Lian, Y.-H., & van Landeghem, H. (2002). An application of simulation and value stream mapping in lean
manufacturing. Paper presented at the Proceedings 14th European Simulation Symposium.
Lian, Y.-H., & van Landeghem, H. (2007). Analysing the effects of Lean manufacturing using a value
stream mapping-based simulation generator. International Journal of Production Research, 45(13), 3037-3058.
https://doi.org/10.1080/00207540600791590
Madrid-Guijarro, A., García, D. & van Auken, H. (2009). Barriers to innovation among Spanish
manufacturing SMEs. Journal of Small Business Management, 47(4), 465-488. https://doi.org/10.1111/j.1540-
627X.2009.00279.x
Marvel, J.H., & Standridge, C.R. (2009). Simulation-enhanced lean design process. Journal of Industrial
Engineering and Management, 2(1), 90-113.Mascarenhas, M.B. (1981). Planning for flexibility. Long Range Planning, 14(5), 78-82.
https://doi.org/10.1016/0024-6301(81)90011-X
McDonald, T., van Aken, E.M., & Rentes, A.F. (2002). Utilising simulation to enhance value stream
mapping: A manufacturing case application. International Journal of Logistics, 5(2), 213-232.
https://doi.org/10.1080/13675560210148696
Mendonça-Tachizawa, E., & Giménez-Thomsen, C. (2007). Drivers and sources of supply flexibility: An
exploratory study. International Journal of Operations & Production Management, 27(10), 1115-1136.
https://doi.org/10.1108/01443570710820657
Metternich, J., Böllhoff, J., Seifermann, S., & Beck, S. (2013). Volume and mix flexibility evaluation of lean
production systems. Procedia CIRP, 9, 79-84. https://doi.org/10.1016/j.procir.2013.06.172
Moeuf, A., Tamayo, S., Lamouri, S., Pellerin, R., & Lelievre, A. (2016). Strengths and weaknesses of small
and medium sized enterprises regarding the implementation of lean manufacturing. IFAC-PapersOnLine,
49(12), 71-76. https://doi.org/10.1016/j.ifacol.2016.07.552
Monden, Y. (2011). Toyota production system: An integrated approach to just-in-time. CRC Press.
Nahmias, S. (2001). Production and Operations Analysis. Irwin, New York: McGraw-Hill.
Narasimhan, J., Parthasarathy, L., & Narayan, P.S. (2007). Increasing the effectiveness of value stream
mapping using simulation tools in engine test operations. Paper presented at the 18th IASTED
International Conference on Modeling and Simulation.
Nemetz, P.L., & Fry, L.W. (1988). Flexible manufacturing organizations: Implications for strategy
formulation and organization design. Academy of Management Review, 13(4), 627-639.
Ohno, T. (1988). Toyota production system: Beyond large-scale production. CRC Press.
Parker, R.P., & Wirth, A. (1999). Manufacturing flexibility: Measures and relationships. European journal of
operational research, 118(3), 429-449. https://doi.org/10.1016/S0377-2217(98)00314-2
Rose, A., Deros, B.M., Rahman, M.A., & Nordin, N. (2011). Lean manufacturing best practices in SMEs.
Paper presented at the Proceedings of the 2011 International Conference on Industrial Engineering and Operations
Management.
Rother, M., & Shook, J. (2003). Learning to see: Value stream mapping to add value and eliminate muda. Lean
Enterprise Institute.Shah, R., & Ward, P.T. (2003). Lean manufacturing: Context, practice bundles, and performance. Journal of
operations management, 21(2), 129-149. https://doi.org/10.1016/S0272-6963(02)00108-0
Shah, R., & Ward, P.T. (2007). Defining and developing measures of lean production. Journal of operations
management, 25(4), 785-805. https://doi.org/10.1016/j.jom.2007.01.019
Singh, R.K., Garg, S.K., & Deshmukh, S. (2008). Strategy development by SMEs for competitiveness: A
review. Benchmarking: An International Journal, 15(5), 525-547. https://doi.org/10.1108/14635770810903132
Slagmulder, R., & Bruggeman, W. (1992). Investment justification of flexible manufacturing technologies:
Inferences from field research. International Journal of Operations & Production Management, 12(7/8),
168-186. https://doi.org/10.1108/EUM0000000001310
Sohal, A., Keller, A., & Fouad, R. (1989). A review of literature relating to JIT. International Journal of
Operations & Production Management, 9(3), 15-25. https://doi.org/10.1108/EUM0000000001228
Suarez, F.F., Cusumano, M.A., & Fine, C.H. (1996). An empirical study of manufacturing flexibility in
printed circuit board assembly. Operations research, 44(1), 223-240. https://doi.org/10.1287/opre.44.1.223
Sullivan, W.G., McDonald, T.N., & van Aken, E.M. (2002). Equipment replacement decisions and lean
manufacturing. Robotics and Computer-Integrated Manufacturing, 18(3), 255-265. https://doi.org/10.1016/S0736-
5845(02)00016-9
Thomas, A., Barton, R., & Chuke-Okafor, C. (2008). Applying lean six sigma in a small engineering
company–a model for change. Journal of Manufacturing Technology Management, 20(1), 113-129.
https://doi.org/10.1108/17410380910925433
Vassell, C. (1999). Computer integrated manufacturing, and small and medium enterprises. Computers &
industrial engineering, 37(1-2), 425-428. https://doi.org/10.1016/S0360-8352(99)00109-6
Vokurka, R.J., & O’Leary-Kelly, S.W. (2000). A review of empirical research on manufacturing flexibility.
Journal of operations management, 18(4), 485-501. https://doi.org/10.1016/S0272-6963(00)00031-0
Voss, C., Tsikriktsis, N., & Frohlich, M. (2002). Case research in operations management. International
journal of operations & production management, 22(2), 195-219. https://doi.org/10.1108/01443570210414329
Wang, T., Guinet, A., Belaidi, A., & Besombes, B. (2009). Modelling and simulation of emergency services
with ARIS and Arena. Case study: The emergency department of Saint Joseph and Saint Luc Hospital.
Production Planning and Control, 20(6), 484-495. https://doi.org/10.1080/09537280902938605
Womack, J.P., Jones, D.T., & Roos, D. (1990). Machine that changed the world. Simon and Schuster.Xia, W., & Sun, J. (2013). Simulation guided value stream mapping and lean improvement: A case study of
a tubular machining facility. Journal of Industrial Engineering and Management, 6(2), 456.
https://doi.org/10.3926/jiem.532
Yin, R.K. (2013). Case study research: Design and methods. Sage Publications.
Zhou, B. (2016). Lean principles, practices, and impacts: A study on small and medium-sized enterprises
(SMEs). Annals of Operations Research, 241(1-2), 457-474. https://doi.org/10.1007/s10479-012-1177-3

Thank you for copying data from http://www.arastirmax.com