MALİYET TABANLI STOKASTİK MONTAJ HATTI DENGELEME PROBLEMİ

COST ORIENTED STOCHASTIC ASSEMBLY LINE BALANCING PROBLEM

Journal Name:

Publication Year:

Abstract (2. Language): 
In today's business that need for economic studies are significant, evaluation and effective use of resources is a very important issue. Therefore, in assembly lines, reduction of costs and benefit from resources such as labor efficiently has become imperative. In this paper the chance constraint mathematical model for stochastic cost oriented assembly line balancing problem has been proposed. The proposed model, have been solved for small to medium-sized problems with using IBM ILOG CPLEX 12.4 solver. Obtained the best solutions were compared with the time oriented assembly line balancing results in terms of the number of station and total labor costs.
Abstract (Original Language): 
İşletmelerde ekonomik çalışma gereğinin büyük önem taşıdığı günümüzde, kaynakların etkin olarak kullanılıp değerlendirilmesi oldukça önemli bir konudur. Bu nedenle montaj hatlarında maliyetlerin azaltılması ve iş gücü gibi kaynaklardan verimli şekilde faydalanmak zorunluk hale gelmiştir. Bu makalede Maliyet Tabanlı Stokastik Montaj Hattı dengeleme problemi ilk kez ele alınmış ve bu amaçla bir şans kısıtlı matematiksel model önerilmiştir. Önerilen model, IBM ILOG CPLEX 12.4 yazılımı yardımıyla küçük ve orta boyutlu problemler için çözülmüştür. Elde edilen en iyi çözümler, aynı problemin zaman tabanlı yaklaşımla elde edilen en iyi çözümleri ile istasyon sayısı ve toplam işgücü maliyeti açısından karşılaştırılmıştır. Maliyet tabanlı modelin amaç fonksiyonu, istasyon sayısının en aza indirilmesi olmamasına rağmen, zaman tabanlı modele karşın çözülen 79 problemin tümünde, aynı sayıda istasyon ve 64 tanesinde daha düşük maliyetler elde edilmiştir.
469
476

REFERENCES

References: 

1. Bryton, B., Balancing of a continuous
production line. M.Sc. Thesis, North-Western
University, 1954.
2. Salveson, M.E., The assembly line balancing
problem. Journal of Industrial Engineering.
Cilt:6, No:3, 18-25, 1955.
3. Becker, C.,Scholl, A., A survey on problems and
methods in generalized assembly line balancing.
European Journal of Operational Research.
Cilt:168, No:3, 694-715, 2006.
4. Battaia, O.,Dolgui, A., A taxonomy of line
balancing problems and their solution approaches.
International Journal of Production
Economics. Cilt:142, No:2, 259-277, 2013.
5. Cercioglu, H., et al., A Simulated Annealing
Approach for Parallel Assembly Line Balancing
Problem. Journal of the Faculty of Engineering
and Architecture of Gazi University. Cilt:24,
No:2, 331-341, 2009.
6. Scholl, A., Balancing and sequencing of assembly
lines. Darmstadt Technical University,
Department of Business Administration,
Economics and Law, Institute for Business
Studies (BWL), 1999.
7. Tusan, D., Maliyet Tabanlı Paralel Montaj Hattı
Dengeleme Problemleri: Yeni modeller. Gazi
Üniversitesi Fen Bilimleri Enstitüsü, Ankara,
2012.
8. Steffen, R., Produktionsplanung Bei
Fließbandfertigung. Gabler, Wiesbaden, 1977.
9. Rosenberg, O.,Ziegler, H., A comparison of
heuristic algorithms for cost-oriented assembly
line balancing. Zeitschrift für Operations
Research. Cilt:36, 477-495, 1992.
10. Amen, M., An exact method for cost-oriented
assembly line balancing. International Journal
of Production Economics. Cilt:64, No:1-3, 187-
195, 2000a.
11. Amen, M., Heuristic methods for cost-oriented
assembly line balancing: A survey. International
Journal of Production Economics. Cilt:68, No:1,
1-14, 2000b.
12. Amen, M., Heuristic methods for cost-oriented
assembly line balancing: A comparison on
solution quality and computing time.
International Journal of Production
Economics. Cilt:69, No:3, 255-264, 2001.
13. Scholl, A.,Becker, C., A note on "An exact
method for cost-oriented assembly line balancing".
International Journal of Production
Economics. Cilt:97, No:3, 343-352, 2005.
14. Amen, M., Cost-oriented assembly line
balancing: Model formulations, solution difficulty,
upper and lower bounds. European Journal of
Operational Research. Cilt:168, No:3, 747-770,
2006.
15. Andres, C., Miralles, C.,Pastor, R., Balancing and
scheduling tasks in assembly lines with sequencedependent
setup times. European Journal of
Operational Research. Cilt:187, No:3, 1212-
1223, 2008.
16. Yazdanparast, V., Hajihosseini, H.,Bahalke , A.,
Cost Oriented Assembly Line Balancing Problem
with Sequence Dependent Setup Times
Australian Journal of Basic and Applied
Sciences. Cilt:5, 878-884, 2011.
17. Roshani, A., et al., Cost-oriented two-sided
assembly line balancing problem: A simulated
annealing approach. International Journal of
Computer Integrated Manufacturing. Cilt:25,
No:8, 689-715, 2012.
18. Moodie, C.L.,Young, H.H., A heuristic method of
assembly line balancing for assumptions of
constant or variable work element times. The
Journal of Industrial Engineering. Cilt:16,
No:1, 23-29, 1965.
19. Kottas, J.F.,Lau, H.-S., A stochastic line
balancing procedure. The International Journal
of Production Research. Cilt:19, No:2, 177-193,
1981.
20. Carraway, R.L., A Dynamic-Programming
Approach to Stochastic Assembly Line Balancing.
Management Science. Cilt:35, No:4, 459-471,
1989.
21. Suresh, G.,Sahu, S., Stochastic assembly line
balancing using simulated annealing. The
International Journal of Production Research.
Cilt:32, No:8, 1801-1810, 1994.
22. Liu, S., Ong, H.,Huang, H., A bidirectional
heuristic for stochastic assembly line balancing
type II problem. The International Journal of
Advanced Manufacturing Technology. Cilt:25,
No:1-2, 71-77, 2005.
23. Alagas, H.M., Yuzukirmizi, M.,Turker, A.K.,
Balancing Stochastic Assembly Lines Using
Constraint Programming and Queueing Networks.
Journal of the Faculty of Engineering and
Architecture of Gazi University. Cilt:28, No:2,
231-240, 2013.
24. Ağpak, K.,Gökçen, H., A chance-constrained
approach to stochastic line balancing problem.
European Journal of Operational Research.
Cilt:180, No:3, 1098-1115, 2007.
25. Guerriero, F.,Miltenburg, J., The stochastic ULine
balancing problem. Naval Research
Logistics. Cilt:50, No:1, 31-57, 2003.

Thank you for copying data from http://www.arastirmax.com