Buradasınız

Sostenibilidad de los sistemas de mejora continua en la industria: Encuesta en la Comunidad Autónoma Vasca y Navarra

Sustainability of continuous improvement systems in industry: Survey of BAC and Navarre.

Journal Name:

Publication Year:

DOI: 
doi: 10.3926/ic.2010.v6n1.p51-77
Abstract (2. Language): 
This article will examine the level of sustainability for companies in Continuous Improvement Management and the factors which are supporting sustainability during time, through a survey to 350 companies of Basque Autonomous Community and Navarra in June of 2009. The study presents some data about the development of the improvement systems. Then, factors that companies have related to the abandonment of improvement systems are analysed. Since improvement systems are based on workers’ participation, this study characterizes this participation. Finally, the elements which have been used in the improvement systems by the companies are analyzed, and how objectives and indicators are used in their management system. To conclude, the following key issues are emphasized: a higher involvement of workforce in improvement systems, the integration of improvement system in the management system and the establishment of associated indicators to the system.
Abstract (Original Language): 
Este artículo analiza el grado de sostenibilidad de las empresas en la gestión de la mejora continua y los factores que apoyan la sostenibilidad en el tiempo, a través de una encuesta enviada a 350 empresas de la Comunidad Autónoma Vasca y Navarra durante el mes de junio de 2009. El estudio presenta datos sobre la evolución de los sistemas de mejora en los últimos años, y la implantación de las distintas metodologías utilizadas. A continuación realiza un análisis de los factores que las empresas asocian con el abandono de los sistemas de mejora. Dado que los sistemas de mejora se basan en la participación de las personas, el estudio caracteriza cómo es dicha participación. Finalmente se analizan los elementos que las empresas utilizan en sus sistemas de mejora, y en qué grado se han introducido indicadores y objetivos en la gestión de la mejora. Como conclusiones se apuntan las siguientes claves para la mejora sostenible: una mayor implicación del personal directo en el sistema de mejora continua, la integración del sistema de mejora continua en la organización y el establecimiento de indicadores asociados al sistema.
51-77

REFERENCES

References: 

AENOR, 2000. NORMA UNE-EN-ISO 9004:2000. Sistemas de gestión de la calidad.
Directrices para la mejora del desempeño. Madrid: AENOR 2000.
AOKI, K. (2008). Transferring japanese kaizen activities to overseas plants in
China. International Journal of Operations & Production Management, 28(6):518-
539.
ASIF, M.; JOOST DE BRUIJN, E.; FISSCHER, O.A.M.; SEARCY, C.; STEENHUIS, H.
(2009a). Process embedded design of integrated management systems.
International Journal of Quality & Reliability Management, 26(3):261-282.
ASIF, M.; JOOST DE BRUIJN, E.; DOUGLAS, A.; FISSCHER, O.A.M. (2009b). Why
quality management programs fail: a strategic and operations management
perspective. International Journal of Quality & Reliability Management, 26(8):778-
794.
BATEMAN, N. (2005). Sustainability: the elusive element of process improvement.
International Journal of Operations & Production Management, 25(3):261-276.
BATEMAN, N.; ARTHUR, D. (2002). Process improvement programmes: a model for
assessing sustainability. International Journal of Operations & Production
Management, 22(5):515-526.
BATEMAN, N.; RICH, N. (2003). Companies’ perceptions of inhibitors and enablers
for process improvement activities. International Journal of Operations &
Production Management, 23(2):185-199.
Intangible Capital, 2010 – 6(1):51-77 – ISSN: 1697-9818
doi: 10.3926/ic.2010.v6n1.p51-77
Sostenibilidad de los sistemas de mejora continua en la industria… 69
C. Jaca García – R. Mateo Dueñas – M. Tanco Rainusso – E. Viles Diez – J. Santos García
BEER, M. (2003). Why total quality management programs do not persist: the role
of management quality and implications for leading a TQM transformation.
Decision Sciences, 34(4):623-642.
BERGER, A. (1997).Continuous improvement and kaizen: standardization and
organizational designs. Integrated Manufacturing Systems, 8(2):110-117.
BESSANT, J.; CAFFYN, S.; GALLAGHER, M. (2001). An evolutionary model of
continuous improvement behaviour. Technovation, 21(2):67-77.
BESSANT, J.; FRANCIS, D. (1999). Developing strategic continuous improvement
capability. International Journal of Operations & Production Management,
19(11):1106-1119.
BESSANT, J.; CAFFYN, S. (1997). High-Involvement innovation through continuous
improvement. International Journal of Technology Management, 14(1):7-28.
BESSANT, J.; CAFFYN, S.; GILBERT, J.; HARDING, R.; WEBB, S. (1994).
Rediscovering continuous improvement. Technovation, 14(1):17-29.
BHUIYAN, N.; BAGHEL, A.; WILSON, J. (2006). A sustainable continuous
improvement methodology at an aerospace company. International Journal of
Productivity and Performance Management, 55(8):671-687.
BISGAARD, S. (2007). Quality management and Juran's legacy. Quality and
Reliability Engineering International, 23:665-677.
BOWEN, H.K.; SPEAR, S. (1999). Decoding the DNA of the Toyota Production
System. Harvard Business Review, September-October, 95-106.
BRUNET, A.P.; NEW, S. (2003). Kaizen in Japan: an empirical study. International
Journal of Operations & Production Management, 23(12):1426-1446.
CAFFYN, S. (1999). Development of a continuous improvement self-Assessment
tool. International Journal of Operations & Production Management, 19(11):1138-
1153.
Intangible Capital, 2010 – 6(1):51-77 – ISSN: 1697-9818
doi: 10.3926/ic.2010.v6n1.p51-77
Sostenibilidad de los sistemas de mejora continua en la industria… 70
C. Jaca García – R. Mateo Dueñas – M. Tanco Rainusso – E. Viles Diez – J. Santos García
COONEY, R.; SOHAL, A. (2004). Teamwork and total quality management: a
durable partnership. Total Quality Management & Business Excellence,
15(8):1131.
DE LANGE-ROS, D.J. (1999). Continuous improvement in teams. the (mis)fit
between improvement and operational activities of improvement teams,
University of Twente, Enschede., PhD thesis.
DELBRIDGE, R.; LOWE, J.; OLIVER, N. (2000). Shopfloor responsibilities under lean
teamworking. Human Relations, 53(11):1459-1479.
FORZA, C. (2002). Survey research in operations management: a process-based
perspective. International Journal of Operations & Production Management,
22(2):152-194.
FROHLICH, M. T. (2002). Techniques for improving response rates in OM survey
research. J. Oper. Manage., 20(1):53-62.
GARCIA-SABATER, J.J.; MARIN-GARCIA, J.A. (2009). Facilitadores y barreras para
la sostenibilidad de la mejora continua: un estudio en proveedores del automóvil
de la Comunidad Valenciana. Intangible Capital, 1:183-209.
HE, Z. (2009). Learn something about your Six sigma program's maturity. Quality
Progress, august 2009, 23-28.
HSUAN-KAI, C.; HSUAN-YUEH, C.; HSIN-HUNG, W.; WEN-TSANN, L. (2004). TQM
implementation in a healthcare and pharmaceutical logistics organization: the
case of Zuellig Pharma in Taiwan. Total Quality Management & Business
Excellence, 15(9):1171-1178.
HUQ, Z., (2005). Managing change: a barrier to TQM implementation in service
industries. Managing Service Quality, 15(5):452-469.
IDRIS, M. A.; AND ZAIRI, M. (2006). Sustaining TQM: a synthesis of literature and
proposed research framework. Total Quality Management & Business Excellence,
17(9):1245.
IMAI, M. (1989). Kaizen: the key to japan's competitive success. Random House
Business Division. New York.
Intangible Capital, 2010 – 6(1):51-77 – ISSN: 1697-9818
doi: 10.3926/ic.2010.v6n1.p51-77
Sostenibilidad de los sistemas de mejora continua en la industria… 71
C. Jaca García – R. Mateo Dueñas – M. Tanco Rainusso – E. Viles Diez – J. Santos García
INSTITUTO DE ESTADÍSTICA DE NAVARRA. (2006). Datos de 2006:
, consultado: septiembre de 2009.
IRANI, Z.; BESKESE, A.; LOVE, P.E.D. (2004). Total quality management and
corporate culture: constructs of organisational excellence. Technovation,
24(8):643-650.
JANZ, B. (1999). Self-directed teams in is: correlates for improved systems
development work outcomes. Information & Management, 35(3):171-192.
JØRGENSEN, F.; BOER, H.; GERTSEN F. (2003). Jump-starting continuous
improvement through self-assessment. International Journal of Operations &
Production Management, 23(10):1260-1278.
JØRGENSEN, F.; BOER, H.; GERTSEN F. (2004). Development of a team-based
ramework for conducting self-assessment of continuous improvement. Journal of
Manufacturing Technology Management, 15(4):343-349.
KAYE, M.; ANDERSON, R. (1999). Continuous Improvement: the ten essential
criteria. International Journal of Quality & Reliability Management, 16(5):485-
509.
KOBAYASHI, I. (1995). 20 Keys to Workplace Improvement, Productivity Press,
Portland.
LAGACÉ, D.; BOURGAULT, M., (2003). Linking manufacturing improvement
programs to the competitive priorities of Canadian SMEs. Technovation, 23(8):
705-715.
LAWLER, E. E. I.; MOHRMAN, S. A. (1985). Quality circles after the fad. Harvard
Business Review, 63(1):64-71.
LIKERT, R. (1932). A technique for the measurement of attitudes. Archives of
Psychology, 140: 1-55.
LILLRANK, P.; SHANI, A. B.; LINDBERG, P. (2001). Continuous improvement:
exploring alternative organizational designs. Total Quality Management &
Business Excellence, 12(1):41-55.
Intangible Capital, 2010 – 6(1):51-77 – ISSN: 1697-9818
doi: 10.3926/ic.2010.v6n1.p51-77
Sostenibilidad de los sistemas de mejora continua en la industria… 72
C. Jaca García – R. Mateo Dueñas – M. Tanco Rainusso – E. Viles Diez – J. Santos García
LIN, L.; LI, T.; KIANG, J.P. (2009). A continual improvement framework with
integration of CMMI and six-sigma model for auto industry. Quality and Reliability
Engineering International, 25(5):551-569.
PRAJOGO, D.I.; SOHAL, A.S. (2004). The sustainability and evolution of quality
improvement programmes—an Australian case study. Total Quality Management
& Business Excellence, 15(2):205.
PUN, K.F.; CHIN, K.S.; GILL, R. (2001). Determinants of employee involvement
practices in manufacturing enterprises. Total Quality Management & Business
Excellence, 12(1):95.
RAPP, C.; AND EKLUND, J. (2002). Sustainable development of improvement
activities - the long-term operation of a suggestion scheme in a Swedish
company. Total Quality Management, 13(7):945-969.
READMAN, J. (2007). What challenges lie ahead for improvement programmes in
the UK? Lessons from the CINet Continuous Improvement Survey 2003.
International Journal of Technology Management, 37(3):290.
SCHROEDER, D.M.; ROBINSON, A.G. (1991). America’s most successful export to
Japan: continuous improvement programs. Sloan Management Review, 32(3):67-
81.
SPACKMAN, L. (2009). Nine steps to make process improvement permanent.
Quality Progress, April 2009:23-28.
SUÁREZ, M.F. (2007). La sostenibilidad de la mejora continua de procesos en la
administración pública: un estudio en los ayuntamientos de España. Universidad
Ramón Llul, Barcelona Tesis doctoral.
TEARE, R.; MUNRO-FAURE, L.; MUNRO-FAURE, M.; SCHEUING, E.; BOWEN, J.T.
(1999). Modelling team structures: a grounded approach. International Journal of
Service Industry Management, 10(4):380-393.
UPTON, D. (1996). Mechanisms for building and sustaining operations
improvement. European Management Journal, 14(3):215-228.

Thank you for copying data from http://www.arastirmax.com