Buradasınız

Utilizing Troubleshooting in Supply Chain Management in Iran Transfo Company and Making Priority Scheme by using Group Decision-Making Techniques

Journal Name:

Publication Year:

Key Words:

Abstract (2. Language): 
In this thesis, Iran Transfo Company's supply chain as a supply chain project, fault finding, identifying and determining their condition and priority classification are evaluated using a group decision. Primarily due to the use of inaccurate and vague language such as words, the application of the SCOR model and group decision making method (method Breda) have benefited. More useful and sufficient knowledge about the situation after the plant and its supply chain and supply chain related activities such as purchasing, production, sales, supply chain the company have identified the problem using techniques of group decision Breda prioritize've done., RFP related, is presented and the performance indicators for all projects have been prioritized in the SCOR model. Iran Transfo Company can use this thesis as well as projects in the future some other companies reduce their dependence on the production of parts and raw materials, the self. This can be costly and wasteful of costs, including costs of transportation, maintenance, time and lost customers and ... Decreases and increases the quality of products, increase customer satisfaction.
102-106

REFERENCES

References: 

[1] www.scm.com , supply chain reference model (SCOR) 4.0, 2001.
[2] Mike Tayles and Colin Drury , moving from make/buy to sourcing :
The outsource decision process , 2001
[3] Ram,Ganeshan Terry P Harrison an introduction to supply chain
management university park Pa.16/802.osa.2004,p.3
[4] Dr Javanmard.Habibolah, industry engineering Strategic
[5] Magazine,Tarbiate Modares university,2005
[6] Javanroh.Saeed,first national lecture of Lejostic and securing doer,1383
[7] Feizabadi. Javad,Summery of securing doer,Tadbir magazine 2007

Thank you for copying data from http://www.arastirmax.com