Agarwal, A., Shankar, R., & Tiwari, M.K. (2006). Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach. European Journal of Operational Research, 173(1), 211-225. http://dx.doi.org/i0.i0i6/j.ejor.2004.i2.005
Ahlstrom, P. & Westbrook, R. (1999). Implications of mass customization for operations management: An exploratory survey. International Journal of Operations & Production Management, 19(3), 262-274.
http://dx.doi.org/10.1108/01443579910249705
Ahmad, S., Schroeder, R.G., & Sinha, K.K. (2003). The role of infrastructure practices in the effectiveness of JIT practices: implications for plant competitiveness. Journal of Engineering and Technology Management, 20(3),
161-191. http://dx.doi.org/10.1016/S0923-4748(03)00017-1
Alfalla Luque, R. & Medina Löpez, C. (2009). Supply Chain Management: unheard of in the 1970s, core to today's company. Business History, 51(2), 202-221.
Avella, L. & Vazquez-Bustelo, D. (2005). İEs la fabricaciön âgil un nuevo modelo de producciön? Universia Business Review - Actualidad Econömica, 6, 94-107.
Bonavia, T. & Marin-Garcia, J.A. (2006). An empirical study of lean production in ceramic tile industries in Spain. International Journal of Operations & Production
Management, 26(5), 505-531. http://dx.doi.org/10.1108/01443570610659883
- 4 7 5 -
Journal of I n d u s t r i a l Engineering and Management - h t t p : / / d x . d o i . o r g / 1 0 . 3 9 2 6 / j i e m . 2 0 1 1 . v 4 n 3 . p 4 6 7 - 4 80
Bonavia, T.
&
Marin-Garcia, J.A. (2011). Integrating human resource management into lean production and their impact on organizational performance. International Journal of Manpower, In press.
Brown, S. & Bessant, J. (2003). The manufacturing strategy-capabilities links in mass customisation and agile manufacturing--an exploratory study. International Journal of Operations & Production Management, 23(7), 707.
http://dx.doi.org/10.1108/01443570310481522
Carrasqueira, M. & Machado, V.C. (2008). Strategic logistics: Re-designing companies in accordance with Lean Principles. International Journal of Management Science and Engineering Management, 3(4), 294-302.
Cua, K., McKone, K., & Schroeder, R.G. (2001). Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. Journal of Operations Management, 19(6), 675-694. http://dx.doi.org/10.1016/S0272-
6963(01)00066-3
Da Silveira, G., Borenstein, D., & Fogliatto, F.S. (2001). Mass customization: Literature review and research directions. International Journal of Production
Economics, 72 1-13. http://dx.doi.org/10.1016/S0925-5273(00)00079-7
Diaz, M.S., Gil, M.J.A., & Machuca, J.A.D. (2005). Performance measurement systems, competitive priorities, and advanced manufacturing technology - Some evidence from the aeronautical sector. International Journal of Operations & Production Management, 25(7-8), 781-799.
http://dx.doi.org/10.1108/01443570510608600
Doolen, T.L. & Hacker, M.E. (2005). A Review of Lean Assessment in Organizations: An Exploratory Study of Lean Practices by Electronics Manufacturers. International Journal of Manufacturing Systems, 24(1), 55-67. http://dx.doi.org/10.1016/S0278-
6125(05)80007-X
Duguay, C., Landry, S., & Pasin, F. (1997). From mass production to flexible/agile production. International Journal of Operations& Production Management, 17(12),
1183-1195. http://dx.doi.org/10.1108/01443579710182936
Flynn, B. B. & Sakakibara, S. (1995). Relationship between JIT and TQM: Practices and performance. Academy of management Journal, 38(5), 1325.
http://dx.doi.org/10.2307/256860
- 476 -
Journal of I n d u s t r i a l Engineering and Management - h t t p : / / d x . d o i . o r g / 1 0 . 3 9 2 6 / j i e m . 2 0 1 1 . v 4 n 3 . p 4 6 7 - 4 80
Fullerton, R.R. & McWatters, C.S. (2001). The production performance benefits from JIT implementation. Journal of Operations Management, 19(1), 81-96.
http://dx.doi.org/10.1016/S0272-6963(00)00051-6
Gibson, C.B., Porath, C.L., Benson, G.S., & Lawler III, E.E. (2007). What results when firms implement practices: The differential relationship between specific practices, firm financial performance, customer service, and quality. Journal of
Applied Psychology, 92(6), 1467-1480. http://dx.doi.org/10.1037/0021-9010.92.6.1467
Guerrero, S. & Barraud-Didier, V. (2004). High-involvement practices and performance of French firms. International Journal of Human Resource
Management, 15(8), 1408-1423. http://dx.doi.org/10.1080/0958519042000258002
Gurumurthy, A. & Kodali, R. (2008). A multi-criteria decision-making model for the justification of lean manufacturing systems. International Journal of Management Scienceand Engineering Management, 3(4), 100-118.
Holweg, M. (2007). The genealogy of lean production. Journal of Operations
Management, 25(2), 420-437. http://dx.doi.org/10.1016/j.jom.2006.04.001
Ismail, H., Reid, I., Mooney, J., Poolton, J., & Arokiam, I. (2007). How small and medium enterprises effectively participate in the mass customization game. IEEE Transactions on Engineering Management, 54(1), 86-97.
http://dx.doi.org/10.1109/TEM.2006.889069
Kannan, V.R. & Tan, K.C. (2005). Just in time, total quality management, and supply chain management: understanding their linkages and impact on business performance. Omega-International Journal of Management Science, 33(2), 153¬162. http://dx.doi.org/10.1016/Lomega.2004.03.012
Katou, A.A. (2008). Measuring the impact of HRM on organizational performance. Journal of Industrial Engineering and Management, 1(2), 119-142.
http://dx.doi.org/10.3926/jiem.2008.v1n2.p119-142
Ketokivi, M. & Schroeder, R.G. (2004). Manufacturing practices, strategic fit and performance: A routine-based view. International Journal of Operations & Production Management, 24(1/2), 171. http://dx.doi.org/10.1108/01443570410514876
Krishnamurthy, R. & Yauch, C.A. (2007). Leagile manufacturing: A proposed corporate. International Journal of Operations & Production Management, 27(6),
588-604. http://dx.doi.org/10.1108/01443570710750277
- 477 -
Journal of I n d u s t r i a l Engineering and Management - h t t p : / / d x . d o i . o r g / 1 0 . 3 9 2 6 / j i e m . 2 0 1 1 . v 4 n 3 . p 4 6 7 - 4 80
Marin-Garcia, J.A. & Bonavia, T. (2011). Strategic Priorities and Lean Manufacturing Practices in Automotive Suppliers. Ten Years After. In M.Chiaberge (Ed.), New Trends and Developments in Automotive Engineering. InTech.
Marin-Garcia, J.A. & Carneiro, P. (2010). Desarrollo y validaciön de un modelo multidimensional de la producciön ajustada. Intangible Capital, 6(1), 78-127.
Marin-Garcia, J.A. & Conci, G. (2009). Exploratory study of high involvement work practices: Identification of the dimensions and proposal of questionnaire to measure the degree of use in the company. Intangible Capital, 5(3), 278-300.
http://dx.doi.org/10.3926/ic.2009.v5n3.p278-300
Marin-Garcia, J.A., Pardo del Val, M., & Bonavia, T. (2006). The Impact of Training and ad hoc Teams in Industrial Settings. International Journal of Management Science and Engineering Management, 1(2), 137-147.
Martın Pena,
M.L
. & Dfaz Garrido, E. (2007). Impacto de la estrategia de producciön en la ventaja competitiva y en los resultados operativos. International Conference on Industrial Engineering & Industrial Management - CIO, 367-377. Madrid.
Martinez Jurado, P.J. & Moyano Fuentes, J. (2011). Lean Production y gestiön de la cadena de suministro en la industria aeronâutica. Investigaciones Europeas de Direcciön y Economla de la Empresa, 17(1), 137-157.
McKone, K.E., Schroeder, R.G., & Cua, K.O. (2001). The impact of total productive maintenance practices on manufacturing performance. Journal of Operations
Management, 19(1), 39-58. http://dx.doi.org/10.1016/S0272-6963(00)00030-9
Molina, L.M., Llorens-Montes, J., & Ruiz-Moreno, A. (2007). Relationship between quality management practices and knowledge transfer. Journal of Operations
Management, 25(3), 682-701. http://dx.doi.org/10.1016/j.jom.2006.04.007
Monplasir, L. (2002). Enhancing CSCW with Advanced Decision Making Tools for an Agile Manufacturing System Design Application. Group Decision and Negotiation,
11, 45-63. http://dx.doi.org/10.1023/A:1014538003326
Narain, R., Yadav, R.C., & Antony, J. (2004). Productivity gains from flexible manufacturing: Experiences from India. International Journal of Productivity and Performance Management, 53(2), 109-128.
http://dx.doi.org/10.1108/17410400410515025
- 478 -
Journal of I n d u s t r i a l Engineering and Management - h t t p : / / d x . d o i . o r g / 1 0 . 3 9 2 6 / j i e m . 2 0 1 1 . v 4 n 3 . p 4 6 7 - 4 80
Perello-Marin, M.R. (2010). Towards a methodology for identifying path dependence in the evolution of human resources practices. Working Papers on Operations Management, 1(1), 56-58.
Portioli Staudacher, A. & Tantardini, M. (2007). Lean Production implementation: A survey in Italy. International Conference on Industrial Engineering & Industrial Management - CIO, 1269-1279. Madrid.
Sakakibara, S., Flynn, B.B., Schroeder, R.C., & Morris, W.T. (1997). The impact of Just-In-Time manufacturing and its infrastructure on manufacturing performance. Management Science, 43(9), 1246. http://dx.doi.org/10.1287/mnsc.43.9.1246
Shah, R. & Ward, P.T. (2007). Defining and developing measures of lean production. Journal of Operations Management, 25(4), 785-805.
http://dx.doi.org/10.1016/j.jom.2007.01.019
Swink, M., Narasimhan, R., & Kim, S.W. (2005). Manufacturing practices and strategy integration: Effects on cost efficiency, flexibility, and market-based performance. Decision Sciences, 36(3), 427-457. http://dx.doi.org/10.1111Ai.1540-
5414.2005.00079.x
Tari, J.J., Molina, J.F., & Castejön, J.L. (2007). The relationship between quality management practices and their effects on quality outcomes. European Journal of Operational Research, 183(2), 483-501. http://dx.doi.org/10.1016/j.ejor.2006.10.016
Treville, S.D. & Antonakis, J. (2006). Could lean production job design be intrinsically motivating? Contextual, configurational, and levels-of-analysis issues. Journal of Operations Management, 24(2), 99-123.
http://dx.doi.org/10.1016/j.jom.2005.04.001
Urgal Gonzalez, B., Diz Comesana, M.E., & Garcfa Vazquez, J.M. (2007). Automatizaciön flexible, Ingenierfa de diseno y fabricaciön, gestiön de la calidad y empowerment: Evidencia empfrica de su contribuciön a la creaciön de capacdidades estrategicas. Direcciön y Organizaciön, 33, 35-52.
Vazquez-Bustelo, D., & Avella, L. (2006a). Agile manufacturing: Industrial case studies in Spain. Technovation, 26, 1147-1161.
http://dx.doi.org/10.1016/j.technovation.2005.11.006
Vazquez-Bustelo, D., & Avella, L. (2006b). Contraste empfrico del modelo de fabricaciön agil en Espana. XVI congreso nacional de la Asociaciön Cientffica de Economfa y Direcciön de Empresas Valencia.
Thank you for copying data from http://www.arastirmax.com