Abstract (2. Language): 
Purpose: This paper describes a typical Value stream mapping (VSM) application enhanced by the discrete event simulation (DES) to a dedicated tubular manufacturing process. Design/Methodology/Approach: VSM is prescribed as part of lean production portfolio of tools, not only highlights process inefficiencies, transactional and communication mismatches, but also guides improvement areas. Meanwhile, DES is used to reduce uncertainty and create consensus by visualizing dynamic process views. It is served as a complementary tool for the traditional VSM to provide sufficient justification and quantifiable evidence needed to convince the lean approaches. A simulation model is developed to replicate the operation of an existing system, and that of a proposed system that modifies the existing design to incorporate lean manufacturing shop floor principles. Findings: A comprehensive model for the tubular manufacturing process is constructed, and distinctive scenarios are derived to uncover an optimal future state of the process. Various simulation scenarios are developed. The simulated results are acquired and investigated, and they are well matched with the real production data. Originality/Value: DES is demonstrated as a guided tool to assist organizations with the decision to implement lean approaches by quantifying benefits from applying the VSM. A roadmap is provided to illustrate how the VSM is used to design a desired future state. The developed simulation scenarios mimic the behavior of the actual manufacturing process in an intuitive manner.
456-476

REFERENCES

References: 

Barker, R.C. (1994). The design of lean manufacturing systems using time based analysis.
International Journal of Operations and Production Management, 14, 86-96.
http://dx.doi.org/10.1108/01443579410068666
Bischak, D.P. (1996). Performance of a manufacturing module with moving workers. IIE
Transactions, 28, 723-733.
Chan, F.T.S. (1995). Using simulation to predict system performance: a case study of an
electro-phonetic deposition plant. Integrated Manufacturing Systems, 6, 27-38.
http://dx.doi.org/10.1108/09576069510093451
Childerhouse, P. & Towill, D.R. (2002). Analysis of the factors affecting real world value stream
performance. International Journal of Production Research, 40, 3499-3518.
http://dx.doi.org/10.1080/00207540210152885
Cho, K., Moon, I., & Yun, W., (1996). System analysis of a multi-product, small-lot-sized
production by simulation: a Korean Motor Factory case. Computers and Industrial
Engineering, 30, 347-357. http://dx.doi.org/10.1016/0360-8352(96)00003-4
Detty, R.B. & Yingling, J. (2000). Quantifying benefits of conversion from lean manufacturing
with discrete events simulation: a case study. International Journal of Production Research,
38(2), 429-445. http://dx.doi.org/10.1080/002075400189509
Hines, P. & Rich, N. (1997). The seven value stream mapping tool. International Journal of
Operations and Production Management, 17, 46-64. http://dx.doi.org/10.1108/01443579710157989
Jones, D. & Womack, J., (2000). Seeing the Whole: Mapping the Extended Value Stream. Lean
Enterprise Institute, Massachusetts.
Lian, Y.H. & Van Landeghem, H. (2007). Analysing the effects of Lean manufacturing using a
value stream mapping-based simulation generator. International Journal of Production
Research, 45(13), 3037-3058. http://dx.doi.org/10.1080/00207540600791590
McDonald, T., Van Aken, E.M. & Rentes, A.F., (2002). Utilizing simulation to enhance value
stream mapping: a manufacturing case application. International Journal of Logistics:
Research and Application, 5, 213-232. http://dx.doi.org/10.1080/13675560210148696
Park, Y.H., Matson, J.E., & Miller, D.M. (1998). Simulation and analysis of the Mercedes-Benz
All Activity Vehicle (AAV) production facility. Proceedings of 1998 Winter Simulation
Conference, 921-926. http://dx.doi.org/10.1109/WSC.1998.745790
Persson, J.F. (2002). The impact of different levels of detail in manufacturing systems
simulation models. Robotics and Computer-Integrated Manufacturing, 18, 319-325.
http://dx.doi.org/10.1016/S0736-5845(02)00024-8
Pavnaskar, S.J., Gershenson, J.K. & Jambekar, A.B. (2003). Classification scheme for lean
manufacturing tools. International Journal of Production Research, 41, 3075-3090.
http://dx.doi.org/10.1080/0020754021000049817
Prakash, A., & Chen, M. (1995). A simulation study of flexible manufacturing systems’.
Computers and Industrial Engineering, 28, 191-199. http://dx.doi.org/10.1016/0360-
8352(94)00037-N
Rother, M. & Shook, J. (1999). Learning to See: Value Stream Mapping to Create Value and
Eliminate Muda. Lean Enterprise Institute, Massachusetts.
Shang, J.S., & Tadikamalla, P.R. (1998). Multicriteria design and control of a cellular
manufacturing system through simulation and optimization. International Journal of
Production Research, 36, 1515-1528. http://dx.doi.org/10.1080/002075498193147
Sullivan, W.G., McDonald, T., & Van Aken, E.M. (2002). Equipment replacement decisions and
lean manufacturing. Robotics and Computer-Integrated Manufacturing, 18, 255-265.
http://dx.doi.org/10.1016/S0736-5845(02)00016-9
Suri, R., & Desiraju, R., (1997). Performance analysis of flexible manufacturing systems with a
single discrete material-handling device. International Journal of Flexible Manufacturing
Systems, 9, 223-249. http://dx.doi.org/10.1023/A:1007901028906
Welgama, P.S., & Mills, R.G.J. (1995). Use of simulation in the design of a JIT system.
International Journal of Operations & Production Management, 15, 245-261.
http://dx.doi.org/10.1108/01443579510099779
Womack, J. & Jones, D. (1996). Lean Thinking - Banish Waste and Create Wealth in Your
Corporation. New York: Simon & Schuster.

Thank you for copying data from http://www.arastirmax.com