Diagnostic Framework and Health Check Tool for Engineering and Technology Projects

Journal Name:

Publication Year:

DOI: 
http://dx.doi.org/10.3926/jiem.1150
Abstract (2. Language): 
Purpose: Development of a practitioner oriented diagnostic framework and health check tool to support the robust assessment of engineering and technology projects. Design/methodology/approach: The research is based on a literature review that draws together insights on project assessment and critical success factors to establish an integrated systems view of projects. This is extended to allow a comprehensive diagnostic framework to be developed along with a high-level health check tool that can be readily deployed on projects. The utility of the diagnostic framework and health check tool are explored through three illustrative case studies, with two from Canada and one from the United Kingdom. Findings and Originality/value: The performance of engineering and technology projects can be viewed through a systems perspective and being a function of six contributing subsystems that are: process, technology, resources, impact, knowledge and culture. The diagnostic framework that is developed through this research integrates these sub-systems to provide a robust assessment methodology for projects, which is linked to existing best practice for project reviews, performance management and maturity models. The case studies provide managerial insights that are related to the diagnostic framework but crucially also position the approach in the context of industrial applications for construction engineering and technology management. Research limitations/implications: The case study approach includes two case studies from the construction and facilities development sector with the third case study from the research and technology sector. Further work is required to investigate the use of the diagnostic framework and health check tool in other sectors. Practical implications: The health check tool will be of practical benefit to new projects managers that require access to a robust and convenient project review methodology for assessing the status and health of a given portfolio of projects. The tool can also be used periodically and throughout the project lifecycle in order to track the performance of projects. Originality/value: This paper provides a unique view and supporting management framework to help project managers assess the status and health of projects. Value can be associated with an extension to the literature on diagnostic tools for engineering project management as well as the insights provided in the three international case studies, which explore the scope and applicability of the health check tool to be used in support of projects that have encountered difficulties and which require implementation of project recovery strategies.
1145
1166

REFERENCES

References: 

Adriaanse, A., Voordijk, H., & Dewulf, G. (2010). Adoption and use of interorganizational ICT in
a construction project. Journal of Construction Engineering and Management, 136(9),
1003-1014. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000201
Almahmoud, E.S., Doloi, H.K., & Panuwatwanich, K. (2012). Linking project health to project
performance indicators: Multiple case studies of construction projects in Saudi Arabia.
International Journal of Project Management, 30(3), 296-307.
http://www.sciencedirect.com/science/article/pii/S0263786311000895#
Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a
phenomenon, it's time to accept other success criteria. International Journal of Project
Management, 17(6), 337-342. h ttp://www.sciencedirect.com/ s cience/article/pii/S0263786398000696
Bigliardi, B., & Bottani, E. (2010). Implementing the balanced scorecard in the mechanical
industry: evidence from a case study. International Journal of Management & Decision
Making, 11(2), 140-162. http://dx.doi.org/10.1504/IJMDM.2010.035214
Brown, P.R., Nelson, R., Jacobs, B., Kokic, P., Tracey, J., Ahmed, M. et al. (2010). Enabling
natural resource managers to self-assess their adaptive capacity. Agricultural Systems,
103(8), 562-568. http://dx.doi.org/10.1016/j.agsy.2010.06.004
Crawford, J.K. (2007). Project management maturity model. Auerbach Publications.
http://www.tandfonline.com/doi/pdf/10.1201/1078.10580530/46352.23.4.2006...
Davenport, T.H., De Long, D.W., & Beers, M.C. (1998). Successful Knowledge Management
Projects. Sloan Management Review, 39(2), 43-57. http://sloanreview.mit.edu/article/successfulknowledge-
management-projects/
Dvir, D., & Shenhar, A. (2007). Reinventing Project Management: The Diamond Approach to
Successful Growth and Innovation. Harvard Business School Press: Boston, Massachusetts.
http://hbr.org/product/reinventing-project-management-the-diamond-approa...
an/8002-HBK-ENG
Froese, T.M. (2010). The impact of emerging information technology on project management
for construction. Automation in Construction, 19(5), 531-538.
http://dx.doi.org/10.1016/j.autcon.2009.11.004
Haug, A., Zachariassen, F., & Van Liempd, D. (2011). The costs of poor data quality. Journal of
Industrial Engineering and Management, 4(2), 168-193.
http://dx.doi.org/10.3926/jiem.2011.v4n2.p168-193
Jaafari, A. (2007). Project and program diagnostics: A systemic approach. International
Journal of Project Management, 25(8), 781-790. http://dx.doi.org/10.1016/j.ijproman.2007.05.008
Jha, K.N., & Iyer, K.C. (2007). Commitment, coordination, competence and the iron triangle.
International Journal of Project Management, 25(5), 527-540.
http://dx.doi.org/10.1016/j.ijproman.2006.11.009
Jin, D., Chai, K.H., & Tan, K.C. (2014). New service development maturity model. Managing
Service Quality, 24(1), 86-116. http://dx.doi.org/10.1108/MSQ-10-2012-0134
Joumard, R., & Nicolas, J.P. (2010). Transport project assessment methodology within the
framework of sustainable development. Ecological Indicators, 10(2), 136-142.
http://dx.doi.org/10.1016/j.ecolind.2009.04.002
Kaplan, R.S., & Norton, D.P. (2003). Putting the Balanced Scorecard to Work. Harvard Business
Review, 71(5), 134-147. http://hbr.org/1993/09/putting-the-balanced-scorecard-to-work/ar/1
Kennedy, D.A. (2004). Lessons Yet to be Learned: Can a Project Cost Database Work?
Proceedings of the American Society for Engineering Management (ASEM) National
Conference: Managing in a Dangerous World, Alexandria (VA), 20-23 October 2004, USA,
473-480. http://www.proceedings.com/1468.html
Kennedy, D.A. (2014). It Works in Theory: A Casebook on Applying Management Ideas to
Pracitical Situations. Decabooks. http://www.decabooks.com/Library/Book/5bc0bf46-df70-43e4-9f6d-
3a3eaace2970
Kerzner, H.R. (2013). Project management: a systems approach to planning, scheduling, and
controlling. 11th Edition. John Wiley & Sons.
http://books.google.co.uk/books?id=QgQQC5qRtzgC&printsec=frontcover#v=on...
Khurana, A., & Rosenthal, S.R. (1997). Integrating the fuzzy front end of new product
development. Sloan Management Review, 38, 103-120. http://sloanreview.mit.edu/article/integratingthe-
fuzzy-front-end-of-new-product-development/
Maqsood, T., & Finegan, A.D. (2009). A knowledge management approach to innovation and
learning in the construction industry. International Journal of Managing Projects in Business,
2(2), 297-307. http://dx.doi.org/10.1108/17538370910949310
Marr, B., & Neely, A. (2003). Automating the balanced scorecard – selection criteria to identify
appropriate software applications. Measuring Business Excellence, 7(3) , 29-36.
http://dx.doi.org/10.1108/13683040310496480
Mian, D., Humphreys, M., & Sidwell, A. (2004). Construction projects immediate health check:
a CSF & KPI approach. in Project Management Australia Conference (PMOZ), Projects
Powering the Economy, 12–13 August 2004, Melbourne, Australia. http://eprints.qut.edu.au/27385/
Müller, R., & Turner, R. (2007). The influence of project managers on project success criteria
and project success by type of project. European Management Journal, 25(4), 298-309.
http://www.sciencedirect.com/science/article/pii/S026323730700059X#
Philbin, S.P. (2010). Developing an Integrated Approach to System Safety Engineering.
Engineering Management Journal, 22(2), 56-67.
http://web.b.ebscohost.com/ehost/pdfviewer/pdfviewer?sid=f16e4046-7302-4...
%40sessionmgr113&vid=2&hid=121
Philbin, S.P. (2011). Design and Implementation of the Balanced Scorecard at a University
Institute. Measuring Business Excellence, 15(3), 34-45.
http://dx.doi.org/10.1108/13683041111161148
PMI. (2000). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Project
Management Institute. http://dx.doi.org/10.1016/S0263-7863(02)00096-0
Schindler, M., & Eppler, M. J. (2003). Harvesting project knowledge: a review of project
learning methods and success factors. International Journal of Project Management, 21(3),
219-228. http://dx.doi.org/10.1016/S0263-7863(02)00096-0
Schon, D. (1983). The Reflective Practitioner: How Professionals Think in Action. Basic Books.
Inc.
http://www.prioritas.co.uk/MAPS/HJW/Docs/Donald%20Sch%F6n%20The%20Refective
%20Practiitoner1.pdf
Weick, K. (1995). Sensemaking in Organizations. Thousand Oaks. Sage.
http://onlinelibrary.wiley.com/doi/10.1002/hrdq.3920090211/abstract
Zwikael, O. (2012). Exclusive project critical success processes: a cultural diversity
perspective. International Journal of Project Organisation and Management, 4(2), 143-152.
http://dx.doi.org/10.1504/IJPOM.2012.046327

Thank you for copying data from http://www.arastirmax.com