Abdul-Razaq, T. and Potts, C. 1988. Dynamic programming state-space relaxation for single-machine scheduling, Journal of Operational Research Society. (39), 141-152.
Acar, N. 2002. Tam Zamaninda Uretim, MPM Yaymlari No:542. Ankara.
Adamopoulos, G.I. and Pappis, C.S. 1998. Scheduling under a common due date on parallel unrelated machines, European Journal of Operational Research. (105), 495-501.
Alidaee, B., Kochenberger, G.A. and Ahmadian, A. 1994. Minimization total absolute flow time de¬viation in single and multiple machine schedul¬ing, The Journal of the Operational Research Society, 45 (9), 1077-1087.
Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T. 1999. A review of scheduling research involving setup
consideration, OMEGA. (27), 219-239.
Bachman, A. and Janiak, A. 2004. Scheduling Jobs with Position-Dependent Processing Times, Journal of the Operational Research Society. (55), 257-264.
Bagchi, U., Sullivan, R. S. and Chang, Y.L. 1987a. Mini¬mizing mean squared deviation of completion times about a common due date, Management
Science. (33), 894-906.
Bagchi, U., Chang, Y.L. and Sullivan, R.S. 1987b. Mini¬mizing absolute and squared deviations of com¬pletion times with different earliness and tardiness penalties and a common due date, Naval Research Logistics. (34), 739-751.
Bagchi, U. 1987. Due date or deadline assignment to multi-job orders to minimize total penalty in the one machine scheduling problem, Presented at the ORSA/TIMS Joint National Conference, St. Louis, 210-218.
Pamukkale University Journal of Engineering Sciences, Vol. 15, No. 2, 2009
248
Ogrenme Etkili Erken/Geg Tamamlanma (gizelgeleme Problemleri igin bir Literatur Aragttrmast
Baker, K.R. and Scudder, G.D. 1990. Sequencing with earliness and tardiness penalties: A review, Operations Research. 38 (1), 22-36.
Baker, K.R. 1997. Elements of sequencing and scheduling, Dartmounth College, Hanover.
Bank, J. and Werner, F. 2001. Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earli-ness tardiness penalties, Mathematical and Computer Modelling. (33), 363-383.
Ba uman, J. and Jozefowska, J. 2006. Minimizing the
earliness-tardiness costs on a single machine, Computers and Operations Research. (33), 3219¬3230.
Biskup, D. 1999. Single-Machine Scheduling with Learning Considerations, European Journal of Operational Research. (115), 173-178.
Biskup, D. and Cheng, T.C.E. 1999. Multiple-Machine Scheduling with Earliness Tardiness And Comple¬tion Time Penalties, Computer&Operations Re¬search. 26 (1), 45-57.
Biskup, D. and Feldmann, M. 2001. Benchmarks for scheduling on single/machine against re¬strictive and unrestrictive common due date, Computers&Operation Research. 28 (8), 787-801.
Biskup, D. and Simons, D. 2004. Common Due Date Scheduling with Autonomous and Induced Learning, European Journal of Operational Re¬search. (159), 606-616.
Biskup, D. 2008. A State-of-the-Art Review on Scheduling with Learning Effects, European Journal Of Operational Research. (188), 315-329.
Celso, M.H., Debora, P.R. and Andre, B.M. 2005. Minimizing Earliness And Tardiness Penalties in A Single-Machine Problem with A Common Due Date, European Journal of Operational Research. (160),
190-201.
Chang, S.S. and Joo, U.G. 1992. A single machine scheduling problem with earliness/tardiness and starting time penalties under a common due date, Computers&Operations Research. 19 (8), 753¬766.
Chen, Z.L. 1997. Scheduling with batch setup times and earliness-tardiness penalties, European Jour¬nal of Operational Research. (96), 518-537.
Chen, P., Wu, C.C. and Lee, W.C. 2006. A Bi-Criteria Two-Machine Flowshop Scheduling Problem with A Learning Effect, Journal of The Operational Research Society. (57), 1113-1125.
Cheng, T. 1988. Optimal common due date with limited completion time deviation, Computers&Operations Research. 15 (2), 91-96.
Cheng, T.C.E. 1989. A heuristic for common due date assignment and job scheduling on Parallel Ma-
chines, Journal of Operational Research Society. (40), 1129-1135.
Cheng, T.C.E. and Chen, Z.L. 1994. Parallel machine scheduling problems with earliness and tardi¬ness penalties, The Journal of the Operational Re¬search Society. 45 (6), 685-695.
Cheng, T.C.E. and Wang, G. 2000. Single Machine Scheduling with Learning Effect Considerations, Annals Of Operations Research. (98), 273-290.
Cochran, E.B. 1960. New Concepts of The Learning Curve, The Journal of Industrial Engineering. (11),
317-327.
Coleman, B.J. 1992. A simple model for optimizing the single machine early/tardy problem with sequence-dependent setups, Production and Op¬eration Management. (1), 225-228.
Conway R.W. and Schultz A. 1959. The Manufacturing Progress Function, The Journal of Industrial Engi¬neering. (10), 39-54.
Day, G.S. and Montgomery, D.B. 1983. Diagnosing The Experience Curve, Journal of Marketing. (47),
44-58.
De, P., Ghosh, J.B. and Wells, C.E. 1989. A note on the minimization of mean squared deviation of com¬pletion times about a common due date, Man¬agement Science. (35), 1143-1147.
Du, J. and Leung, Y.T. 1990. Minimizing Total Tardiness on One Machine is NP-hard, Mathematics of Op¬erations Research. (15), 483-495.
Eilon, S. and Chowdhury, I. 1977. Minimizing waiting time variance in the single machine problem, Management Science. (23), 567-575.
Emmons, H. 1987. Scheduling to a common due date on parallel uniform processors, Naval Research Logistics. (34), 803-810.
Eren, T. 2004. Cok Olcutlu Akis Tipi gizelgeleme Problemleri igin Cozum Yaklasimlari, Doktora Tezi, Gazi Unv. Ankara.
Eren, T. ve Guner, E. 2004. Ogrenme Etkili Akis Tipi Cizelgelemede Ortalama Akis Zamaninin En Kucuklenmesi, Gazi Unv. Muh. Mim. Fak. Dergisi. (19), 119-124.
Eren, T. and Guner, E. 2007. Minimizing Total Tardiness in A Scheduling Problem with A Learning Effect, Applied Mathematical Modelling. (31), 1351-1361.
Feldman, M. and Biskup, D. 2003. Single-Machine Scheduling For Minimizing Earliness And Tardi¬ness Penalties by Meta-Heuristic Approaches, Computer And Industrial Engineering. (44), 307¬323.
French, S. 1982. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop, Ellis Horwood Ltd., England.
Fry, T.D. 1987. Armstrong R.D. and Blackstone J.H., Min-
ale Universitesi Muhendislik Bilimleri Dergisi, Cilt 15, Sayi 2, 2009
imizing weighted absolute deviation in single machine scheduling, IIE Transactions. (19), 445¬450.
Garey, M.R., Tarjan, R.E. and Wilfong, G.T. 1988. One processor scheduling with symmetric earliness and tardiness penalties, Mathematics of Operations Research. (13), 330-348.
Ghemawat, P. 1985. Building Strategy on The Experi¬ence Curve-A Venerable Management Tool Remains Valuable - In The Right Circumstances, Harvard Business Review, 63 II, 143-149.
Gordon, V., Proth, J.M. and Chu, C. 2001. A survey of the state-of-the-art of common due date assign¬ment and scheduling research, European Journal of Operational Research. (139), 1-25.
Gupta, S. and Sen, T. 1983. Minimizing a quadratic function of job lateness on a single machine, Engineering Costs Production Economics. (7), 181¬194.
Hall, N.G. 1986. Single and multi-processor models for minimizing completion time variance, Naval Re¬search Logistics Quarterly. (33), 49-54.
Hall, N.G. and Posner, M.E. 1991. Earliness-Tardiness Scheduling Problems, I: Weighted deviation of completion times about a common due date, Operation Research. (39), 836-846.
Hall, N.G., Kubiak, W. and Sethi, S.P. 1991. Earliness-tardiness scheduling problems, I: Weighted de¬viation of completion times about a restrictive common due date, Operations Research. 39 (5),
847-856.
Heizer, J. and Render, B. 2001. Operations Manage¬ment (6. Edition), Prentice Hall, New Jersey.
Hendel, Y. and Sourd, F. 2007. An improved earliness-tardiness timing algorithm, Computers and Op¬erations Research. 34 (10), 2931-2938.
Hino, C.S., Ronconi, D.P. and Mendes, A.B. 2005. Mini¬mizing earliness and tardiness penalties in a sin¬gle-machine problem with a common due date, European Journal of Operational Research. (160),
190-201.
Kanet, J.J. 1981a. Minimizing variation of flow time in single machine systems, Management Science.
(27), 1453-1459.
Kanet, J.J. 1981b. Minimizing the average deviation of job completion times about a common date, Naval Research Logistics Quarterly. (28), 643-651.
Kellegoz, T. 2006., Toplam Gee Bitirme Zamaninin En Kucuklenmesi Performans Oleutlu Permutasyon Akis Tipi gizelgeleme Problemlerinin Cozumun-de Genetik Algoritma Yaklasimi, Yuksek Lisans Tezi, Kirikkale Univ., Kirikkale.
Keyser, T.K. and Sarper H. 1991. A heuristic solution of the E/G problem with waiting costs and non-zero
Pamukkale University Journal of Engineering Sciences, Vol. 15, No..
B.Toklu ve V.Qelik
release times, Computers & Industrial Engineering. (21), 297-301.
Koulamas, C. 1996. Single machine scheduling with time windows and earliness/tardiness penalties, European Journal of Operational Research. (91),
190-202.
Koulamas, C. and Kyparisis, G.J. 2007. Single-Machine And Two Machine Flowshop Scheduling with General Learning Function, European Journal of Operational Research. (178), 402-407.
Kuo, W.H. and Yang, D.L. 2006a. Minimizing The Total Completion Time in A Single-Machine Schedul¬ing Problem with A Time-Dependent Learning Effect, European Journal of Operational Research.
(174), 1184-1190.
Kuo, W.H. and Yang, D.L. 2006b. Single-Machine Group Scheduling with A Time-Dependent Learning Effect, Computers&Operations Research. 33 (8),
2099-2112.
Kuo, W.H. and Yang, D.L. 2006c. Minimizing The Makes-pan In A Single Machine Scheduling Problem with A Time-Based Learning Effect, Information Processing Letters. (97), 64-67.
Kuo, W.H. and Yang, D.L. 2007. Single machine sched¬uling with past-sequence-dependent setup times and learning effects, Information Processing
Letters. (102), 22-26.
Lapre', M.A. 2000. Mukkherjee A.S. and Van Wassen-hove L.N., Behind the Learning Curve: Linking Learning Activities to Waste Reduction, Manage¬ment Science. (46), 597-611.
Lauff, V. and Werner, F. 2004. Scheduling with Com¬mon Due Date, Earliness and Tardiness Penalties for Multimachine Problems: A Survey, Mathematical and Computer Modelling. 40 (5-6), 637-655.
Lee, C.Y. 1991. Danusaputro S. L. And Lin C.S., Mini¬mizing Weighted Number of Tardy Jobs And Weighted Earliness-Tardiness Penalties About A Common Due Date, Computers And Operations
Research. (18), 379-389.
Lee, W.C., Wu, C.C. and Sung, H.J. 2004. A Bi-Criterion Single-Machine Scheduling Problem with Learn¬ing Considerations, Acta Informatica. (40), 303¬315.
Lee, W.C. and Wu, C.C. 2004. Minimizing Total Comple¬tion Time in A Two-Machine Flowshop with A Learning Effect, International Journal of Produc¬tion. (88), 85-93.
Leung, J.Y.T. 2002. A dual criteria sequencing problem with earliness and tardiness penalties, Naval Re¬search Logistics. (49), 422-431.
Liao, C.J. and Cheng, C.C. 2007. A variable neighbor¬hood search for minimizing single machine weighted earliness and tardiness with common
2009
250
Ogrenme Etkili Erken/Geg Tamamlanma (gizelgeleme Problemleri igin bir Literatur Aragttrmast
due date, Computer&Industrial Engineering. (52), 404-413.
Liman, S.D. and Ramaswamy, S. 1994. Earliness-tardi-ness scheduling problems with a common delivery window, Operations Research Letters. (15),
195-203.
Liman, S.D., Panwalkar, S.S. and Thongmee, S. 1996. Determination of common due window location in a single machine scheduling problem, Euro¬pean Journal of Operational Research. (93), 68-74.
Lin, B.M.T. 2007. Complexity Results for Single-Ma¬chine Scheduling with Positional Learning Ef¬fects, Journal of The Operational Research Society.
58 (8), 1099-1102.
Mondal, S.A. and Sen, A.K. 2001. Single Machine Weighted Earliness-Tardiness Penalty Problem with A Common Due Date, Computer And Operations Research. (28), 649-669.
Mosheiov, G. 2001a. Scheduling problem with learning effect, European Journal Of Operational Re¬search. (132), 687-693.
Mosheiov, G. 2001b. Parallel machine scheduling with learning effect, Journal of The Operational Re¬search Society. (52), 1165-1169.
Mosheiov, G. and Shadmon, M. 2001. Minmax earli-ness-tardiness costs with unit processing time jobs, European Journal of Operational Research. (130), 638-652.
Mosheiov, G. and Sidney, J.B. 2003. Scheduling with General Job-Dependent Learning Curves, Euro¬pean Journal Of Operational Research. (147), 665¬670.
Mosheiov, G. and Sidney, J.B. 2005. Note on Schedul¬ing with General Learning Curves to Minimize Number of Tardy Jobs, Journal of The Operational Research Society, 56 (1), 110-112.
Oge, M., 2001. Tam Zamaninda (JIT) Sistemi ve Tekstil Sektorunde Bir Uygulama, YuksekLisans Tezi, Marmara Unv., istanbul.
Panwalkar, S.S., Smith, M.L. and Seidmann, A. 1982. Common due date assignment to minimize total penalty for the one machine scheduling prob¬lem, Operations Research, 30, 391-399.
Panwalkar, S.S. and Liman, S.D. 2002. Single operation earliness-tardiness scheduling with machine activation cost, IIE Transactions, 34, 509-513.
Pinedo, M. 1995. Scheduling: Theory, Algoritms and Systems, Prentice Hall, NewJersey.
Pinedo, M. and Chao, X. 1999. Operation Scheduling with Applications in Manufacturing and Services, Mc GrawHill, NewYork.
Rym, M. 2007. Minimizing Total Earliness And Tardi¬ness on A Single machine using a hybrid heuris¬tic, Computer&Operations Research. 34 (10), 3126-
3142.
Sakuraba, C.S., Ronconi, D.P. and Sourd, F. 2009. Scheduling in a two-machine flowshop for the mini¬mization of the mean absolute deviation from a common due date, Computers&Operations Re¬search. 36 (1), 60-72.
Sarper, H. 1995. Minimizing the sum of absolute devia¬tions about a common due date for the two-ma¬chine flow shop problem, Applied Mathematical
Modelling. 19 (3), 153-161.
Schaller, J.E. and Gupta, J.N.D. 2008. Single machine scheduling with family setups to minimize total earliness and tardiness, European Journal of Op¬eration Research. (187), 1050-1068.
Seidmann, A., Panwalkar, S.S. and Smith, M.L. 1981. Optimal assignment of due-dates for a single processor scheduling problem, International Journal of Production Research, 19 (4), 393-399.
Shabtay, D. 2008. Due date assignments and sched¬uling a single machine with a general earliness/ tardiness cost function, Computers&Operation Research. 35 (5), 1539-1545.
Soroush, S.M. and Fredendall, L.D. 1994. The stochas¬tic single machine scheduling problem with ear-liness-tardiness costs, European Journal of Opera¬tional Research. (77), 287-302.
Sun H. and Wang, G. 2003. Parallel machine earli-ness and tardiness scheduling with proportional weights, Computers and Operations Research. (30), 801-808.
Sundararaghavan, P.S. and Ahmed, M.U. 1984. Mini¬mizing the sum of absolute lateness in single machine and multimachine scheduling', Naval Research Logistics Quarterly. (31), 325-333.
Sundararaghavan, P.S. and Kunnathur, A.S. 1994. Single machine scheduling with start time de¬pendent processing time: Some solvable cases, European Journal of Operational Research. 78 (3),
394-403.
Szwarc W. and Mukhopadhyay S.K. 1995. Optimal tim¬ing schedules in earliness-tardiness single-ma¬chine sequencing, Naval Research Logistics. (42),
1109-1114.
Toksari, M.D. and Guner, E. 2008. Parallel machine ear-liness/tardiness scheduling problem under the effects of position based learning and linear/ nonlinear deterioration, Computers&Operations Research, Accepted Manuscript.
Valente, J.M.S. and Alves, R.A.F.S. 2005. Filtered and re¬covering beam search algorithms for early/tardy scheduling problem with no idle time, Computers and Industrial Engineering. (48), 363-375.
Vani, V. and Raghavachari, M. 1987. Deterministic and random single machine scheduling with variance
Pamukkale Universitesi Muhendislik Bilimleri Dergisi, Cilt 15, Sayi 2, 2009
251
M.Ci^ler,
minimization, Operations Research. (35), 111-120.
Venezia, I. 1985. On The Statistical Origins of The Learning Curve, European Journal of Operational Research. (19), 191-200.
Ventura J.S., Kim D. and Garriga F. 2005. Single machine earliness-tardiness scheduling with resource-dependent release dates, European Journal of Operational Research. (142), 52-69.
Wang, J.B. and Xia, Z.Q. 2005. Flow-shop Scheduling with A Learning Effect, Journal of the Operational Research Society. (56), 1325-1330.
Wang, J.B. 2006. A Note on Scheduling Problems with Learning Effects and Deteriorating Jobs, International Journal of Systems Science. (37), 827-833.
Wang, X. and Cheng, T.C.E. 2007. Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan, European Journal of Operational Research. (178), 57-70.
Wang, J.B. 2007., Single-Machine Scheduling Problems with The Effects of Learning and Deteriorati-
B.Toklu ve V.Qelik
on. Omega. (35), 397-402. Wright T.P. 1936. Factors Affecting the Cost of Airplanes, Journal of the Aeronautical Sciences. (3), 122¬128.
Yano, C. A. and Kim, Y. D. 1991. Algorithms for a class of single-machine weighted tardiness and earli-ness problems, European Journal of Operational Research, 52, 167-178. Yelle, L.E. 1979. The Learning Curve: Historical Review and Comprehensive Survey, Decision Science. (10), 302-328.
Zhao, C.L., Zhang, Q.L. and Tang, H.Y. 2004. Machi¬ne Scheduling Problems with Learning Effects, Dynamics of Continuous, Discrete and Impulsive Systems, Series A: Mathematical Analysis. (11), 741¬750.
Zhu, Z. and Heady, R.B. 2000. Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach, Computers&Industrial Engineering. (38), 297-305.
Thank you for copying data from http://www.arastirmax.com