[1] Trygg, L., “Concurrent Engineering Practices in Selected Swedish Companies: A
Movement or an Activity of the Few ?” , Journal of Product Innovation Management
Volume 10, Issue 5, 403- 416, 1993.
[2] Birgün, S., Gülen, K. G., Özkan, K., “A Case Study on Eliminating Waste from the
Business Processes”, Proceedings of the 15th Annual World Business Congress,
International Management Development Association, Bosnia and Herzegovina, 41-46,
2006.
[3] Ertay, T., Birgün Barla, S., Kulak, O., “The Studies for Lean Implementation in A
Manufacturing Environment: A Case Study”, Proceedings of the International Conf. on
Industry, Engineering and Management Systems, 890–895, Florida, 2001.
[4] Pillai, A.S., Joshi, A., and Rao, K.S., “Performance Measurement of R&D Projects in a
Multi-Project, Concurrent Engineering Environment”, International Journal of Project
Management, Volume 20, Issue 2, 165-177, 2002.
[5] Maylor, H., Gosling, R., “The Reality of Concurrent New Product Development”,
Integrated Manufacturing Systems, Volume 9, Issue 2, 69-76, 1998.
[6] Oliver, N., Delbridge, R., Lowe, J., “Lean Production Practices: International
Comparisons in the Auto Components Industry”, British Journal of Management, Volume
7, Issue 1, 29-44, 1996.
[7] ChunWu, Y.,“Lean Manufacturing: A Perspective of Lean Suppliers”, International
Journal of Operations & Production Management, Volume 21, Issue 11, 1349-1376, 2003.
[8] Yusuf, Y.Y, Adeleye, E.O.,“A Comparative Study of Lean and Agile Manufacturing with
a Related Survey of Current Practices in the UK”, International Journal of Production
Research, Volume 40, Issue 17, 4545-4562, 2002.
[9] White, R.E., Pearson, J.N., Wilson, J.R.,“JIT Manufacturing: A Survey of
Implementations in Small and Large U.S. Manufacturers”, Management Science, Volume
45, No 1, 1-15, 1999.
[10] Duffy, V., Danek, A., Salvendy G., “A Predictive Model for the Successful Integration of
Concurrent Engineering with People and Organizational Factors: Based on Data of 25
Companies”, International Journal of Human Factors in Manufacturing, Volume 5, Issue
4, 429-445, 1995.
[11] Acar, N., Tam Zamanında Üretim, MPM Yayınları, Ankara, 1995.
[12] Groover, M.P., Automation, Production Systems and Computer-Integrated
Manufacturing, Second Edition, Prentice Hall, 2001.
[13] Güner, E., Karaca M.E., “ Tam Zamanında Üretim Sisteminde Tedarikçi İlişkileri ve En
İyi Parti Büyüklüğü Üzerine Bir Uygulama” Gazi Üni. Mühendislik ve Mimarlık
Fakültesi Dergisi, Cilt: 19, No:14, 443–454, 2004.
[14] Womack, P. J., Yalın Düşünce, Sistem Yayıncılık, İstanbul, 1999.
[15] Yayla, A.Y., Dizayn Kalitesinin Sağlanmasında Eş Zamanlı Mühendislik ve Kalite
Fonksiyonu Açınımı Yaklaşımı, Yüksek Lisans Tezi, Yıldız Teknik Üniversitesi,
İstanbul,1999.
[16] Cartin, T.J., Principles and Practices of TQM, Quality Press, Milwaukee,1993.
[17] Hartley, R.J., Concurrent Engineering: Shortening Lead Times, Raising Quality and
Lowering Cost, Productivity Press, 1992.
[18] Groover, M.P., Fundamentals of Modern Manufacturing, Materials, Process and Systems,
Second Edition, Wiley Higher Education, 2002.
[19] Özbaş, E., Eş Zamanlı Mühendislik Esasları ve Bazı Uygulama Yaklaşımları, Yüksek
Lisans Tezi, İstanbul Teknik Üniversitesi, İstanbul, 1999.
[20] Ohno, T., Toyota Production System: Beyond Large Scale Production , Productivity
Press, Cambridge, 1988.
[21] Koufteros, X., Vonderembse, M., Doll, W., “Concurrent Engineering and its
Consequences”, Journal of Operations Management, Vol.19, 97–115, 2001.
[22] Shah, R., Ward, P.T., “Lean Manufacturing: Context, Practice Bundles and Performance”
Journal of Operations Management, Vol.21, 129–149, 2003.
[23] Montgomery, D.C., Design and Analysis of Experiments, Sixth Edition, Wiley Higher
Education, 2004.
[24] Wolpole, E.R., Myers, R.H., Myers, S., Ye, K., Probability & Statistics for Engineers &
Scientists, Seventh Edition, Prentice Hall, 2002.
[25] Turanlı, M., Güriş, Selahattin, G., Temel İstatistik, Der Yayınları, İstanbul, 2000.
Thank you for copying data from http://www.arastirmax.com