Journal Name:
- Süleyman Demirel Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi
Publication Year:
- 2002
| Author Name | University of Author | Faculty of Author |
|---|---|---|
- 2
- Turkish
REFERENCES
1. Amnions, J.C., Lofgren, C.B. ve McGinnis, L.F.( 1985). A Large Scale Machine Loading Problem in Flexible Assembly. Annals of Operations Research, Vol.3,319-322.
2.
Atmaca
, E. ve Erol, S. (2000). Esnek Üretim Sistemlerinde Yükleme ve Rotalama Problemlerinde Amaç Programlama Yaklaşımının Uygulanması, YA/EM 2000, Yöneylem Araştırması ve Endüstri Mühendisliği XX1. Ulusal Kongresi, K.K.T.C.
3. Avonts, L.H. ve Van Wassenhove, L.N. (1988). The Part mix and routing mix problem in FMS: a coupling between an LP model and closed queueing network. IntJ.Prod.Res., Vol.20, No.12, 1891-1902.
4. Bastos, J.M.(1988). Batching and routing: Two functions in the operational planning of flexible manufacturing systems. European J.of Op.Res., 33, 230-244.
5. Bernardo, J. ve Mohamed, Z. (1992). The Measurement and use of Operational flexibility. European J.of. Op. Res., 60, 144-155.
6. Chakravarty,A.K. ve Shtub, A. (1984). Selecting parts and loading flexible manufacturing systems. Proceedings of the First ORSA/TIMS Special Conference on Flexible Manufacturing Systems, ss. 284-289, Ann Arbor, Michigan.
7. Chen, Y. ve Askin, R.G. (1990). A Multiobjective evaluation of flexible manufacturing system loading heuristics. Int.J.Prod.Res., Vol.28, No.5, 895-911.
308
C.7, S.2
Esne
k Üretim Sistemlerinde Yükleme ve Rotalama Problemleri
8. Chen, I.J. ve Chung, C.H. (1991). Effects of loading and routing decisions on performance of flexible manufacturing systems. Int.J.Prod.Res., Vol.29, No.11, 2209-2225.
9. Co, H.C., Biermann,J.S. ve Chen, S.K. (1990). A Methodical approach to the flexible manufacturing system batching, loading, and tool configurationproblems. Int.J.Prod.Res., 28, 2171-2186.
10. Das, S.C. ve Nagendra, P. (1997). Selection of routes in a flexible manufacturing facility. Int.J.Prod.Economics, 48, 237-247.
11. D'Angelo, A., Massimo, G. ve Levialdi, N. (1996). Multicriteria evaluation model for flexible system design. Computer Integrated Manufacturing Systems, Vol.9, N0.3, 171-178.
12. Dean, B. ve Schniederjans,Y.M. (1990). A goal programming approach to production planning for flexible manufacturing systems. Journal of Engineering Technology Management, 6, 207-220.
13. Han, M.H. ve McGinnis, L.F. (1989). Flow control in flexible manufacturing: minimization of stockout cost. Int.J.Prod.Res., 27, 701¬715.
14. Hutchison, J., Leong, K., Snyder, D. ve Ward, F. (1989). Scheduling for random job shop flexible manufacturing systems. Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems, 161-166.
15. Hwan , S.S. ve Shogun, A.W. (1989). Modelling and solving an FMS part selection problem. Int.J.Prod.Res., Vol.27, No.8, 1349-1366.
16. Jaikumar, R. ve Van Wassenhove, L.N. (1989). A Production Planning framework for flexible manufacturing systems. Journal of Manufacturing Operations Management, 2, 52-79.
17. Kim, Yeong-Dae ve Yano, C.A. (1993). Heuristics approaches for loading problems in flexible manufacturing systems. IIE Transactions, Vol.25,Iss.1, 26-39.
18. Kimemia, J. ve Gershwin, S.B. (1983). An algorithm for the computer control of production in flexible manufacturing systems. IIE Transactions, 15, 353-362.
19. Kulatilaka, N. (1988). Valuing the flexibility of flexible manufacturing systems. IEEE Transactions on Engineering Management, 35(4), 250¬257.
20. Kumar, P., Tewari, N.K. ve Singh, N. (1990). Joint Consideration of Grouping and Loading Problems in Flexible Manufacturing System. Int.J. Prod.Res., 25,1053-1068
309
ATMACA-EROL
2002
21. Kusiak, A. (1986). Modelling and Design of FMS's. Elsevier Science Publishers b.v., Amsterdam.
22. Lashkari, R.S., Dutta, S.P. ve Padhye, M.A. (1987). A new formulation of operation allocation problem in flexible manufacturing systems:mathematical modelling and computational experience. Int.J.Prod.Res., 25, 1267-1283.
23. Lee, S.M. ve Jung, H.J. (1989). A multi-objective production planning model in a flexible manufacturing environment. Int.J.Prod.Res., Vol.27., No.11, 1981-1992.
24. Liang, M. ve Dutta, S.P. (1993). An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. European J.ofOp.Res., Vol.67, Iss.3, 387-404.
25. Liang, M. (1994). Integrated machining speed, part selection, and machine loading decisions in flexible manufacturing systems. Computers and Industrial Engineering, 26(3), 599-608.
26. Maimon, O.Z. ve Gershwin, S.B. (1988). Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research, 36(2), 279-292.
27. Mohamed, Z.A.(1995). Ramifications of tool magazine size on the makaspan and routing flexibility of flexible manufacturing systems. EuropeanJ.ofOp.Res, 87, 289-298.
28. Mohamed, Z.A. (1996). A flexible approach to (re) configure flexible manufacturing cells. European J.ofOp.Res., 566-576.
29. Mohamed, Z.A.; Kumar A. ve Motwani, J. (1999). An improved part grouping model for minimizing makespan in FMS. European J.of Op.Res, Vol.116, Iss.1, 171-182.
30. Mohamed, Z.M. ve Bernardo, J.J. (1997). Tool planning models for flexible manufacturing systems. European J.ofOp.Res., 103, 497-514
31. Moreno, A. ve Ding, F. (1993). Heuristics for the FMS-Loading and part type selection problems. Int.J.Flexible Manufacturing Systems, 287-300.
32. Myint, S. ve Tabucanon, M.T. (1994). A Multiple- criteria approach to machine selection for flexible manufacturing systems. Int.J.Prod.Economics, Vol.33, Iss.1-3, 121-131.
33. O'Grady, P.J. ve Menon, U. (1987). Loading a flexible manufacturing system. Int.J.Prod.Res., vol.25, No.7, 1053-1068.
3 0
C.7, S.2
Esne
k Üretim Sistemlerinde Yükleme ve Rotalama Problemleri
34. Piplani, R. ve Talavage, J. (1995). Launching and dipatching strategies for multi -criteria control of closed manufacturing systems with flexible routeing capability. Int.J.Prod.Res., vol.33, No.8, 2181-2196.
35. Ram, B., Sarin, S.C. ve Chen, C.S. (1990). A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing systems(FMS's). Int.J.Prod.Res., 28, 637-645.
36. Ro, I. ve Kim, J. (1990). Multi-criteria operational control rules in flexible manufacturing systems(FMS's). Int.J.Prod.Res., vol.28, No.1, 47-63.
37. Sarin, S.C. ve Chen, C.S. (1987). The machine loading and tool allocation problem in a flexible manufacturing system. Int.J.Prod.Res., 25, 1081-1094.
38. Schall, S.O. ve Chandra, J. (1994). Evaluation of alternative tool combinations in a flexible manufacturing system. Computers and Industrial Engineering, 26(4), 633-645.
39. Shanker,K. ve Tzen, Y.J. (1985). A loading and dispatching problem in a random flexible manufacturing system. Int.J.Prod.Res., 23(2), 579-595.
40. Shanker, K. ve Srinivasulu, A. (1989). Some methodologies for loading problems in flexible manufacturing systems. Int.J.Prod.Res., 27, 1019¬1034.
41. Singh, N. (1996). Flexible manufacturing systems, Systems Approach To Computer-Integrated Design and Manufacturing, ss. 529-576.
42. Stecke, K.E. (1983). Formulations and solutions of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29(3), 273.
43. Stecke, K.E. ve Solberg, J.J. (1981). Loading and Control Policies For a Flexible Manufacturing Systems. Int.J. Prod.Res., 19,481-490.
44. Ventura, J.A. ve Chen, F.F. (1988). Loading tools and machines in flexible manufacturing systems. Computers and Industrial Engineering, Vol.15,no. 1-4, 223-230.
45. Wilhelm, W.E. ve Shin, H.M. (1985). Effectiviness of Alternate Operations in a Flexible Manufacturing System. Int.J.of Prod.Res., 23, 65-79.
46. Wilson, J.M. (1992). Approaches to machine load balancing in flexible manufacturing systems. J.of the Operational Research Society, Vol.43, Iss.5, 415-423.