1. AZAIZEZ, M., N., S., S., SHARIF (2005). “A0-1 GoalProgramming
Modelfor Nurse Scheduling,” Computers & Operations Research,32:
491–507.
2. BİLAZER, F.,N., G., E., KONCA, S., UĞUR, H., UÇAK, F., ERDEMİR,
E., ÇITAK (2008),Türkiye’de HemşirelerinÇalışma Koşulları, Türk
Hemşireler Derneği,Odak Ofset Matbaacılık, Ankara.
3. BRUNNER, J., O.,J., F., BARD, R., KOLISCH (2009). “FlexibleShift
SchedulingofPhysicians,” Health Care Management Science, 12:
285–305.
4. CHEANG, B.,H.,LI, A.,LIM,B., RODRIGUES(2003).“Nurse
Rostering Problems-ABibliographic Survey,” European Journalof
Operational Research, 151: 447-460.
5. GÜNGÖR, İ.(2002).“Hemşire Görevlendirmeve Çizelgeleme
Sorununa BirModelÖnerisi,” SüleymanDemirelÜniversitesi İktisadi
ve İdariBilimler Fakültesi, C.7, S.2,s.77-94.
6. GÜNGÖR, İ.(2005). İşgücüMaliyetlerininOptimizasyonuVardiya
Planlama(Modeller,AlgoritmalarveUygulamalar), Asil Yayın
Dağıtım, Ankara.
7. HUARNG,F. (1999).“A Primary Shift Rotation Nurse Scheduling
Using Zero-One LinearGoalProgramming,”Wolters Kluwer,
17(3): 135-144.
8. ISKEN,M., W.(2004). “AnImplicitTour Scheduling Model with
Applications inHealthcare,”AnnalsofOperationsResearch, 128: 91–
109.
9. JAN,A., M.,YAMAMOTO,A.,OHUCHI (2000).“Evolutionary
Algorithms for Nurse Scheduling Problem,” IEEE, 196-203.
10. KAWANAKA,H., K., YAMAMOTO, T., YOSHİKAWA,T., SHİNOGİ,S.,
TSURUOKA (2001).“Constraints and Search Efficiency in Nurse
SchedulingProblem,” IEEE,1123-1130.
50
Alanya İşletme FakültesiDergisi2/1(2010)22-52
11. KWAK,N.,K.,C.,LEE (1997).“ALinear GoalProgramming Modelfor
Human Resource Allocationina Health-Care Organization,” Journalof
MedicalSystems,21( 3): 129-140.
12. LODREE, E.,J., C., D., GEIGER, X., JIANG (2009). “Taxonomy for
Integrating Scheduling Theory and Human Factors: Review and
Research Opportunities,” InternationalJournalof Industrial
Ergonomics, 39: 39-51.
13. MILLAR,H.,H.,M.,B., KIRAGU (1998).“Cyclicand Non-Cyclic
Scheduling of 12 h Shift Nurses byNetwork Programming,”European
Journalof OperationalResearch,104: 582-592.
14. MIWA, M., M., MATSUZAKI, S., OKUMA, T., INOUE, T., FURUHASHI
(2002). “NurseScheulingSystemUsingBacterial Evolutionary
Algorithm Hardwarwe,” IEEE, 1801-1805.
15. MURAT, Y., Ş., N., ULUDAĞ(2008).“Bulanık Mantık ve Lojistik
Regresyon Yöntemleri ileUlaşım Ağlarında GeçkiSeçim Davranışının
Modellenmesi,” İMO Teknik Dergi,288: 4363 -4379.
16. NAIDU,K., D.,K., M.,SULLIVAN, P., P., WANG, Y., YANG, “Managing
Personnelthrough StaffScheduling Algorithms”,
,
(15.01.2009)
17. SUNGUR,B. (2008).“Bulanık Vardiya Çizelgeleme Problemleri İçin
TamsayılıProgramlama Modeli”, ErciyesÜniversitesi İktisadi ve İdari
Bilimler FakültesiDergisi, 30: 211-227.
18. ŞEN,Z. (1999). MühendislikteBulanık (Fuzzy) Modelleme İlkeleri,
İ.T.Ü. UçakVeUzay Bilimleri Fakültesi, İstanbul.
19. TOPALOĞLU, Ş.,H.SELİM (2009),“Nurse scheduling Using Fuzzy
ModellingApproach,” Lecture Notes inComputer Science, New Trends
in Applied Artificial Intelligence,4570: 54-63.
20. TOPALOĞLU, Ş., İ.,ÖZKARAHAN (2004),“An ImplicitGoal
Programming ModelFor the Tour Scheduling Problem Considering the
Employee Work Preferences,” Annalsof Operations Research, 128:
135-158.
Thank you for copying data from http://www.arastirmax.com