FİRMALAR ARASI PROJE YÖNETİMİ ETKİNLİĞİ: UYGULAMALI BİR ÇALIŞMA

INTER-ENTERPRISE PROJECT MANAGEMENT ACTIVITY: AN APPLIED STUDY

Journal Name:

Publication Year:

Author NameUniversity of AuthorFaculty of Author
Abstract (2. Language): 
Institutions and organizations create cost interest, shortening the time, systematic working, programmed process, efficiency and most importantly qualified technological structures thanks to the Project management which presents many advantages and superiorities. These data enables it rank among the indispensable and the most preferred ones. The necessary answers in terms of many world countries for the differentiated preferences due to the concept of globalized culture and innovativeness drive to the new searches. Parties who want to gain the least loss and the most benefit from this drive understood that they should only get this profitability with Project management systems and Project management and they accelerated the studies in this direction.
Abstract (Original Language): 
Birçok üstünlüğü ve faydayı ortaya çıkaran proje yönetimi sayesinde, kuruluşlar ve kurumlar maliyet karı, zaman süresinin kısaltılması, sistematik çalışma, programlı süreç, verimlilik ve en önemlisi kaliteli teknolojik yapılar meydana getirmektedir. Elde edilen bu veriler ile de vazgeçilmez ve en çok tercih edilenler arasında yerini almasını sağlamaktadır. Birçok dünya ülkesinin artık globalleşen kültür anlayışı ile birlikte çeşitlenen tercihlere aranması gereken cevaplar ve yenilikçilik farklı arayışlara sürüklemektedir. Sürüklenmeden en az zarar ve en çok fayda elde etmek isteyen taraflar ise ancak bu karlılığı proje yönetim sistemleri ve proje yönetimi ile elde edebileceklerini anlamış ve bu yöndeki çalışmalarına hız vermişlerdir.
47-65

REFERENCES

References: 

ÇANDUR, C.,(2010). Bankacılık IT Proje Yönetimi
Ve Ms Project’le Proje Planlama, Haliç
Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek
Lisans Tezi, İstanbul
DALYAN, İ.,(2010). Türk İnşaat Sektöründe Proje
Yönetimi Ve Bilgisayar Destekli Planlama İle
Verimlilik Analizi, Yıldız Teknik Üniversitesi,
Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi,
İstanbul
ESATOĞLU, N.,(2010). Bilgi Teknolojileri Proje
Yönetimi Ve Başarı Koşulları, Ankara Üniversitesi,
Sosyal Bilimler Enstitüsü, Yüksek
Lisans Tezi, Ankara
GÜMÜŞEL, D.,(2007). Proje Yönetiminde Temel
Kavramlar Proje Döngüsü Yönetimi Ve
Mantıksal Çerçeve Yaklaşımı, Rec Türkiye,
Ankara
GÜRSES, M.,(2007). Kısıtlar Teorisi Ve Proje
Yönetiminde Bir Uygulama, İstanbul Teknik
Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek
Lisans Tezi, İstanbul
İSTANBUL SANAYİ ODASI, (2011). Kalite
Ve Teknoloji İhtisas Kurulu (İSO-KATEK),
Proje Yönetimi Kılavuzu 9, İstanbul
KIR,E.,(2007). Yazılım Sektöründe Proje Yönetimi,
Kadir Has Üniversitesi, Sosyal Bilimler
Enstitüsü, Yüksek Lisans Tezi, İstanbul
KOONTZ, H., (1964). “Making Sence Of Management
Theory”, A Management Sourcebook
(Ed: Franklin Moore), Harper and Row Publishers,
New York, 104
KUTLU, N.T.,(2001). Proje Planlama Teknikleri
Ve Pert Tekniğinin İnşaat Sektöründe
Uygulanması Üzerine Bir Çalışma, Dokuz
Eylül Üniversitesi, Sosyal Bilimler Enstitüsü
Dergisi, Cilt 3, Sayı:2
MARTİNELLİ, S.,(2000). Eğitim Kılavuzu, Proje
Yönetimi, Avrupa Konseyi Dg IV, Gençlik
Ve Spor Direktörlüğü, Avrupa Konseyi Ve
Avrupa Komisyonu
MEREDITH J.R., MANTEL, JR, SAMUEL
J., (2000). Project Management, A Managerial
Approach, 4th Edition, John Wiley & Sons
Inc., New York
MINTZBERG, H., (1957). Administrative Behavior,
The Macmillan Company, 30
ONUR, İ.,(2007). Proje Yönetiminde Stratejik
Planlama Ve Olgunluk Modeli Kapsamında
Yapılan Bir Uygulama, Dumlupınar Üniversitesi,
Sosyal Bilimler Enstitüsü, İşletme
Anabilim Dalı, Yüksek Lisans Tezi, Kütahya
ROBERT, A. G.,(1966). Business Leadership in
the Large Corporation, Üniversity of California
Press, Berkeley,318
SAKAR, S.(2012). “Proje Yönetimi Metodolojisi
”, Http://Members.Tripod.Com/Wariproject/
Projeler/Proje1.Html
SÖNMEZ, E.,(2007). Neden Proje Yönetimi?,
Mimar Sinan Güzel Sanatlar Üniversitesi,
Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi,
İstanbul.
TEMEL,M.,(2011). Proje Yönetimi Teknikleri
Ve Kara Salyangozu Üretim Çiftliği Projesi
Üzerine Bir Uygulama, Çukurova Üniversite65
UHBAB
www.uhbabdergisi.com
Uluslararası Hakemli Beşeri ve Akademik Bilimler Dergisi
Ocak/Şubat/Mart Kış Dönemi Cilt: 2 Sayı: 3 Yıl:2013 Jel Kodu: M
ID:48
si, Sosyal Bilimler Enstitüsü, Yüksek Lisans
Tezi, Adana
UZUNTAŞ, F.,(2010). Proje Yönetiminde Risk
Analizi, İstanbul Üniversitesi, Sosyal Bilimler
Enstitüsü, Yüksek Lisans Tezi, İstanbul
YANAT, M.,(2006). Mimari Projelerde Süreç
Ve Bilgi Yönetimi, Beykent Üniversitesi,
Sosyal Bilimler Enstitüsü, Yüksek Lisans
Tezi, İstanbul
YURTCAN, E.,(2008). Kamuda Proje Yönetimi
Uygulamasında Etkinlik Sorunu: Eskişehir’de
Bir Araştırma, Dumlupınar Üniversitesi,
Sosyal Bilimler Enstitüsü, Yüksek Lisans
Tezi, Kütahya

Thank you for copying data from http://www.arastirmax.com