HAZAR GÖLÜ CANSUYU VE POMPAJ DEPOLAMALI HES PROJESİ

SUPPORTING HAZAR LAKE FOR LIFE WATER WITH PUMPED STORAGE HEPP

Journal Name:

Publication Year:

Author NameUniversity of Author
Abstract (2. Language): 
Non-storage water power plants that will be built according to the law no. 4628 and 5346 will hold a big place in installed power of Turkey. The energy that is produced in these plants will not be consumed and energy lost will emerge because energy storage is not possible. This energy that is not stored in the form of electricity will be stored in the form of water at the time that demand is little and price is low and this water converted to electricity will be put in use at the time that demand is high. In 01 July 2006 and 12 January 2012, Bursa natural gas plant that has an installed capacity of 1210 MW broke down and electricity cuts occurred in Marmara Region because there is no any pumped storage system that will supply peak energy demand in Turkey.In this paper, a pre-feasibility study for pumped storage HEPP that Turkey has not had yet and is built to ensure security of energy supply and price equilibrium is made. The pumped storage facilities and firm energy capacity of Hazar Lake that has features like large reservoir capacity, a lot of economic benefits and ease of construction is investigated and profitability study is made.
Abstract (Original Language): 
4628 ve 5346 sayılı Kanun kapsamında yapılacak olan depolamasız su kuvveti tesisleri kurulu gücümüzde büyük bir yer tutacaktır. Bu santrallerle üretilen fazla enerji, güç talebinin düşük olduğu saatlerde tüketilemeyecek ve üretilen enerjinin depolanması da mümkün olmadığından bir enerji kaybı ortaya çıkacaktır. Elektrik formunda depolanmayan bu enerji, talebin az fiyatın düşük olduğu saatlerde elektrik kullanılarak su formunda depolanmalı ve ihtiyacın yüksek olduğu saatlerde elektriğe dönüştürülerek kullanıma sokulmalıdır. Elektrik enerjisi, arz ve talebini eşleştirmek için kullanılan böyle bir sistem ülkemizde mevcut olmadığından 1 Temmuz 2006 tarihinde 1210 MW kurulu gücündeki Bursa Doğal Gaz santralı arızalanıp devre dışı kalınca 13 şehrimiz 8 saat boyunca enerjisiz kalmıştır. Bu çalışmada gelişmiş ülkelerin enerji arz güvenliği ve fiyat dengesini sağlamak amacıyla yaygın olarak kullandığı ancak ülkemizde henüz bulunmayan bu sistem için bir ön fizibilite çalışması yapılmıştır. Büyük bir depolama kapasitesi ile inşa kolaylığı ve birçok ekonomik avantajı olan Hazar Gölü’nün sahip olduğu bu potansiyel araştırılarak firm enerji üretim kapasitesi ve maliyet çalışmaları yapılmıştır.
29
42

REFERENCES

References: 

BİB (2011): “Bayındırlık ve İskan Bakanlığı Birim Fiyat Tarifleri Kitabı”.
Çetin H., Güneyli H., Mayer L. (2003): “Paleoseismology of the Palu-Lake Hazar Segment of the East Anatolian Fault Zone”, Turkey, Tectonophysics, Cilt 374, s.163-197.
Çoban F. (2007): “Hazar Gölü Su Kalitesinin Araştırılması”, Yüksek Lisans Tezi, Fırat Üniversitesi, Fen Bilimleri Enstitüsü.
Doğru M., Külahcı F. (2004): “Iso-Radioactivity Curves of the Water of the Hazar Lake”, Elazig, Turkey, Journal of Radioanaltical and Nuclear Chemistry, Cilt 260, No. 3, s.557-562.
DSİ (1971): “Elazığ-Uluova Sulama Projesi”, Enerji ve Tabii Kaynaklar Bakanlığı, DSİ Genel Müdürlüğü İşletme ve Bakım Dairesi Başkanlığı Yayınları: Ankara.
DSİ (1993): “Elazığ Hatunköy Projesi Planlama Raporu”.
GEPA : http://www.eie.gov.tr/MyCalculator/Default.aspx.
Kuan T. (1989): “Basic Planning Analysis of Pumped-Storage”, Doktora Tezi, Colorado State University, USA: Civil Engineering Department.
Külahcı F., Özer A. B., Doğru M. (2006): “Prediction of the Radioactivity in Hazar Lake (Sivrice, Turkey) by Artificial Neural Networks”, Journal of Radioanalytical and Nuclear Chemistry, Cilt 269, No. 1, s.63-68.
Ramage J. (2000): “Hydroelectricity”, in Renewable Energy, Power for a Sustainable Future, Oxford University Press: Glasgow; s.183–226.
Tatar Y., Turan M., Aksoy E. (1995): “Hazar Gölünün Oluşumu ve Jeolojik Özellikleri”, 1. Hazar Gölü ve Çevresi Sempozyumu Bildiriler,Sivrice Kaymakamlığı Yayın No: 2, s.1-13, Sivrice.
TEDAŞ : “Tükiye Elektrik Enerjisi Üretim Projeksiyonu 2008-2017”.
Ter-Cazarian A. (1994): “In: Energy Storage for Power Systems”, 1st ed. London: Peter Peregrinus Ltd. on behalf of the IEE.
Tuna M. C. (2011): “Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin A Case Study Cardakli HEPP”, AJSE, Springer. Accept. In press.

Thank you for copying data from http://www.arastirmax.com