Adriaanse, A., Voordijk, H., & Dewulf, G. (2010). Adoption and use of interorganizational ICT in
a construction project. Journal of Construction Engineering and Management, 136(9),
1003-1014. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000201
Almahmoud, E.S., Doloi, H.K., & Panuwatwanich, K. (2012). Linking project health to project
performance indicators: Multiple case studies of construction projects in Saudi Arabia.
International Journal of Project Management, 30(3), 296-307.
http://www.sciencedirect.com/science/article/pii/S0263786311000895#
Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a
phenomenon, it's time to accept other success criteria. International Journal of Project
Management, 17(6), 337-342. h ttp://www.sciencedirect.com/ s cience/article/pii/S0263786398000696
Bigliardi, B., & Bottani, E. (2010). Implementing the balanced scorecard in the mechanical
industry: evidence from a case study. International Journal of Management & Decision
Making, 11(2), 140-162. http://dx.doi.org/10.1504/IJMDM.2010.035214
Brown, P.R., Nelson, R., Jacobs, B., Kokic, P., Tracey, J., Ahmed, M. et al. (2010). Enabling
natural resource managers to self-assess their adaptive capacity. Agricultural Systems,
103(8), 562-568. http://dx.doi.org/10.1016/j.agsy.2010.06.004
Crawford, J.K. (2007). Project management maturity model. Auerbach Publications.
http://www.tandfonline.com/doi/pdf/10.1201/1078.10580530/46352.23.4.2006...
Davenport, T.H., De Long, D.W., & Beers, M.C. (1998). Successful Knowledge Management
Projects. Sloan Management Review, 39(2), 43-57. http://sloanreview.mit.edu/article/successfulknowledge-
management-projects/
Dvir, D., & Shenhar, A. (2007). Reinventing Project Management: The Diamond Approach to
Successful Growth and Innovation. Harvard Business School Press: Boston, Massachusetts.
http://hbr.org/product/reinventing-project-management-the-diamond-approa...
an/8002-HBK-ENG
Froese, T.M. (2010). The impact of emerging information technology on project management
for construction. Automation in Construction, 19(5), 531-538.
http://dx.doi.org/10.1016/j.autcon.2009.11.004
Haug, A., Zachariassen, F., & Van Liempd, D. (2011). The costs of poor data quality. Journal of
Industrial Engineering and Management, 4(2), 168-193.
http://dx.doi.org/10.3926/jiem.2011.v4n2.p168-193
Jaafari, A. (2007). Project and program diagnostics: A systemic approach. International
Journal of Project Management, 25(8), 781-790. http://dx.doi.org/10.1016/j.ijproman.2007.05.008
Jha, K.N., & Iyer, K.C. (2007). Commitment, coordination, competence and the iron triangle.
International Journal of Project Management, 25(5), 527-540.
http://dx.doi.org/10.1016/j.ijproman.2006.11.009
Jin, D., Chai, K.H., & Tan, K.C. (2014). New service development maturity model. Managing
Service Quality, 24(1), 86-116. http://dx.doi.org/10.1108/MSQ-10-2012-0134
Joumard, R., & Nicolas, J.P. (2010). Transport project assessment methodology within the
framework of sustainable development. Ecological Indicators, 10(2), 136-142.
http://dx.doi.org/10.1016/j.ecolind.2009.04.002
Kaplan, R.S., & Norton, D.P. (2003). Putting the Balanced Scorecard to Work. Harvard Business
Review, 71(5), 134-147. http://hbr.org/1993/09/putting-the-balanced-scorecard-to-work/ar/1
Kennedy, D.A. (2004). Lessons Yet to be Learned: Can a Project Cost Database Work?
Proceedings of the American Society for Engineering Management (ASEM) National
Conference: Managing in a Dangerous World, Alexandria (VA), 20-23 October 2004, USA,
473-480. http://www.proceedings.com/1468.html
Kennedy, D.A. (2014). It Works in Theory: A Casebook on Applying Management Ideas to
Pracitical Situations. Decabooks. http://www.decabooks.com/Library/Book/5bc0bf46-df70-43e4-9f6d-
3a3eaace2970
Kerzner, H.R. (2013). Project management: a systems approach to planning, scheduling, and
controlling. 11th Edition. John Wiley & Sons.
http://books.google.co.uk/books?id=QgQQC5qRtzgC&printsec=frontcover#v=on...
Khurana, A., & Rosenthal, S.R. (1997). Integrating the fuzzy front end of new product
development. Sloan Management Review, 38, 103-120. http://sloanreview.mit.edu/article/integratingthe-
fuzzy-front-end-of-new-product-development/
Maqsood, T., & Finegan, A.D. (2009). A knowledge management approach to innovation and
learning in the construction industry. International Journal of Managing Projects in Business,
2(2), 297-307. http://dx.doi.org/10.1108/17538370910949310
Marr, B., & Neely, A. (2003). Automating the balanced scorecard – selection criteria to identify
appropriate software applications. Measuring Business Excellence, 7(3) , 29-36.
http://dx.doi.org/10.1108/13683040310496480
Mian, D., Humphreys, M., & Sidwell, A. (2004). Construction projects immediate health check:
a CSF & KPI approach. in Project Management Australia Conference (PMOZ), Projects
Powering the Economy, 12–13 August 2004, Melbourne, Australia. http://eprints.qut.edu.au/27385/
Müller, R., & Turner, R. (2007). The influence of project managers on project success criteria
and project success by type of project. European Management Journal, 25(4), 298-309.
http://www.sciencedirect.com/science/article/pii/S026323730700059X#
Philbin, S.P. (2010). Developing an Integrated Approach to System Safety Engineering.
Engineering Management Journal, 22(2), 56-67.
http://web.b.ebscohost.com/ehost/pdfviewer/pdfviewer?sid=f16e4046-7302-4...
%40sessionmgr113&vid=2&hid=121
Philbin, S.P. (2011). Design and Implementation of the Balanced Scorecard at a University
Institute. Measuring Business Excellence, 15(3), 34-45.
http://dx.doi.org/10.1108/13683041111161148
PMI. (2000). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Project
Management Institute. http://dx.doi.org/10.1016/S0263-7863(02)00096-0
Schindler, M., & Eppler, M. J. (2003). Harvesting project knowledge: a review of project
learning methods and success factors. International Journal of Project Management, 21(3),
219-228. http://dx.doi.org/10.1016/S0263-7863(02)00096-0
Schon, D. (1983). The Reflective Practitioner: How Professionals Think in Action. Basic Books.
Inc.
http://www.prioritas.co.uk/MAPS/HJW/Docs/Donald%20Sch%F6n%20The%20Refective
%20Practiitoner1.pdf
Weick, K. (1995). Sensemaking in Organizations. Thousand Oaks. Sage.
http://onlinelibrary.wiley.com/doi/10.1002/hrdq.3920090211/abstract
Zwikael, O. (2012). Exclusive project critical success processes: a cultural diversity
perspective. International Journal of Project Organisation and Management, 4(2), 143-152.
http://dx.doi.org/10.1504/IJPOM.2012.046327
Thank you for copying data from http://www.arastirmax.com