Bannerman, P.L. (2008). Defining project success: a multilevel framework. Proceedings PMI
Research Conference, Warsaw, Poland, July 13-16.
Bar-On, R. (2000). Emotional and social intelligence: Insights from the emotional quotient
inventory. In R. Bar-On & J. Parker (Eds.), The handbook of emotional intelligence: Theory,
development, assessment, and application at home, school, and in the workplace (1st ed.,
pp. 363–388). San Francisco, CA: Jossey-Bass.
Barrick, M.R., & Mount, M.K. (1991). The Big Five personality dimensions and job performance:
A meta-analysis. Personnel Psychology, 4 4 , 1 – 2 6 . http://dx.doi.org/10.1111/j.1744-
6570.1991.tb00688.x
Bauch, C. (2004). Lean Product Development: Making waste transparent. Massachusetts
Institute of Technology. PhD thesis August 2004.
Black, K, & Slaker, R. (2004). Project performance: implications of personality preferences and
double loop learning. Journal of American Academy of Business, 4(1/2), 292–297.Bowen, P.L., Ferguson, C.B., Lehmann, T.H., & Rohde, F.H. (2003). Cognitive style factors
affecting database query performance. International Journal of Accounting Information
Systems, 4, 251–273. http://dx.doi.org/10.1016/j.accinf.2003.05.002
Choi, K.S., Deek, F.P., & Im, I. (2008). Exploring the underlying aspects of pair programming:
The impact of personality. Information and Software Technology, 50, 1114–1126.
http://dx.doi.org/10.1016/j.infsof.2007.11.002
Crawford, C.M. (1987). New product failure rates: a reprise. Research management. New York,
NY: Inst, ISSN 0034-5334, ZDB-ID 3901105. 30.1987, (4), 20-24.
http://dx.doi.org/10.1126/science.237.4810.20
Davis, S.A. (2011). Investigating the Impact of Project Managers’ Emotional Intelligence on
Their Interpersonal Competence. Project Management Journal, 42(4) , 37–57.
http://dx.doi.org/10.1002/pmj.20247
De Jong, R.D., Bouhuys, S.A., & Barnhoorn, J.C. (1999). Personality, self-efficacy and
functioning in management teams: a contribution to validation. International Journal of
Selection and Assessing, 7(1), 46–49. http://dx.doi.org/10.1111/1468-2389.00103
Dolfi, J., & Andrews, E. (2007). The Subliminal Characteristics Of Project Managers: An
Exploratory Study Of Optimism Overcoming Challenge In The Project Manager Work
Envi ronment . International Journal of Project Management, 2 5 , 6 7 4 - 6 8 2 .
http://dx.doi.org/10.1016/j.ijproman.2007.02.002
Farris, J., Groesbeck, R.L., Van Aken, E.M., & Letens, G. (2006). Evaluating the relative
performance of engineering design projects: a case study using data envelopment analysis.
IEEE Transaction Engineering Management, 53(3), 471–482.
http://dx.doi.org/10.1109/TEM.2006.878100
Feltham, R., & Hughes, D. (1999). Interim Managers: Distinguishing Personality Characteristics
of Managers on Short-term Contracts. International Journal of Selection and Assessment,
7(4), 209-214. http://dx.doi.org/10.1111/1468-2389.00121
Gehring, D. (2007). Applying traits theory of leadership to project management. Project
Management Journal, 38(1), 44–54.
Gillard, S., & Price, J. (2005). The competencies of effective project managers: A conceptual
analysis. International Journal of Management, 22(1), 48–53.
Harrison, F., & Lock, D. (2004). Advanced Project Management a Structured Approach. Gower
Publishing, Ltd. pp. 34.
Hirsh, S., & Kummerow, J. (1997). Life types: Understanding yourself and make the most of
who you are. New York: Warner Books.Jablokow, K.W., & Booth, D.E. (2006). The Impact and Management of Cognitive Gap in High
Performance Product Development Organizations. Journal of Engineering and Technology
Management, 23, 313-336. http://dx.doi.org/10.1016/j.jengtecman.2006.08.003
Jeong, K.J., & Phillips, D.T. (2011). Application of a concept development process to evaluate
process layout designs using value stream mapping and simulation. Journal of Industrial
Engineering and Management, 4(2), 206-230. http://dx.doi.org/10.3926/jiem.2011.v4n2.p206-230
Johnson, W.L., Mauzey, E., Johnson, A.M., Murphy, S.D., & Zimmerman, K.J. (2001). A higher
order analysis of the factor structure of the Myers–Briggs Type Indicator. Measurement and
Evaluation in Counseling and Development, 34, 96–108.
Jung, C.G. (1971). Psychological types. In R. F. C. Hull (Eds.), The collected works of Carl
Gustav Jung, Vol. 6. Princeton, NJ: Princeton University Press (Original work published in
1921).
Mayer, J., Salovey, P., & Caruso, D. (2000). Models of emotional intelligence. In R. J. Sternberg
(Ed.), Handbook of intelligence (pp. 396–420). New York: Cambridge University Press.
http://dx.doi.org/10.1017/CBO9780511807947.019
Meza, D., & Jeong, K.Y. (2013) Measuring efficiency of lean six sigma project implementation
using data envelopment analysis at NASA. Journal of Industrial Engineering and
Management, 6(2), 401-422. http://dx.doi.org/10.3926/jiem.582
Mills, J., Robey, D., & Smith, L. (1985). Conflict handling and personality dimension of project
management personnel. Psychological Reports, 57, 1135–1143.
http://dx.doi.org/10.2466/pr0.1985.57.3f.1135
Mohanty, A., Mishra, J., & Satpathy, B. (2011). Activity modes selection for project crashing
through deterministic simulation. Journal of Industrial Engineering and Management, 4(4),
610-623. http://dx.doi.org/10.3926/jiem.224
Mullaly, M.E., & Thomas, J. (2004). Linking Personality and Project Success: Exploring the
Inter-relationship of Psychological Type and Project Manager Competency, presented at
IRNOP VI, Turku, Finland.
Myers, I.B., & Myers, P.B. (1980). Gifts differing: understanding personality type. Palo Alto,
CA: Davies-Black Publishing.
Othman, M., Gouw, G.J., & Bhuiyan, N. (2012). Workforce scheduling: A new model
incorporating human factors. Journal of Industrial Engineering and Management, 5(2),
259-284. http://dx.doi.org/10.3926/jiem.451
Prabhakar, G.P. (2008). What is project success: a literature review. International Journal of
Business Management, 3(9), 3–10.
Purcell, J., & Hutchinson, S. (2007). Front-line managers as agents in the HRM-performance
causal chain: theory, analysis and evidence. Human Resource Management Journal, 17(1),
3–20. http://dx.doi.org/10.1111/j.1748-8583.2007.00022.x
Rother, M., & Shook, J. (1999). Learning to See. Version 1.2. Brookline, MA: Lean Enterprise
Institute.
Rolfe, I., & McPherson, J. (1995). Formative assessment: how am I doing?. Lancet, 345,
837-839. http://dx.doi.org/10.1016/S0140-6736(95)92968-1
Shenhar, A.J., & Wideman, R.M. (2000). Matching project management style with project type
for optimum success. PMForum internet site at www.pmforum.com, also found at
http://www.maxwideman.com/papers/profiles/observations.htm.
Smith, L.W. (2001). The effects of project manager personality profiles on projects.
Proceedings of the Project Management Institute Annual Seminars and Symposium,
Nashville, TN.
Sprague, M.M. (1997). Personality type matching and student teacher evaluation.
Contemporary Education, 69, 54–57.
Tett, R.P., Jackson, D.N., & Rothstein, M. (1991). Personality measures as predictors of job
performance: A meta-analytic review. Personnel Psychology, 67, 737–743.
Thomas, G., & Fernandez, W. (2008). Success in IT projects: a matter of definition?.
International Journal of Project Management, 26(7), 733–742.
http://dx.doi.org/10.1016/j.ijproman.2008.06.003
Turner, J.R., & Muller, R. (2006). Choosing Appropriate Project Managers. Matching Their
Leadership Style to the Type of Project. Newtown Square, PA: The Project Management
Institute.
Wheeler, P. (2001). The Myers–Briggs Type Indicator and applications to accounting education
and research. Issues in Accounting Education, 16(1), 123–150.
http://dx.doi.org/10.2308/iace.2001.16.1.125
Thank you for copying data from http://www.arastirmax.com