Adıgüzel, O. (2009). Personel seçiminin analitik hiyerarşi süreci
yöntemiyle gerçekleştirilmesi. Dumlupınar Üniversitesi Sosyal Bilimler Dergisi,
(24): 243-252.
Akoğlan, M. (1998). Turizm sektöründe insan kaynakları seçim
yöntemleri. Anatolia Turizm Araştırmaları Dergisi, 9 (1-2): 26-30.
Al-Harbi, K. M. A. S. (2001). Application of the AHP in project
management. International Journal of Project Management, 19 (1): 19-27.
Berryman-Fink, C. (1989). The manager’s desk reference. USA: Amacom.
Budak, G. (2013). Yetkinliğe dayalı insan kaynakları yönetimi. Ankara:
Barış Yayınları Fakülteler Kitabevi.
Chen, P. C. (2009). A fuzzy multiple criteria decision making model in
employee recruitment. International Journal of Computer Science and Network
security, 9 (7): 113-117.
Cleland, D. I. (2004). Field guide to project management. Canada: John
Wiley & Sons.
Cleland, D. I. ve Ireland, L. R. (2002). Project management strategic
design and implementation. USA: McGraw-Hill.
Coşkun, O. ve Ekmekçi, İ. (2012). Bir inşaat projesinin evreleri ile zaman
ve maliyet analizinin proje yönetim teknikleri vasıtasıyla incelenmesi. İstanbul
Ticaret Üniversitesi Fen Bilimleri Dergisi, 10 (20): 39-53.
Çavdar, H. ve Çavdar, M. (2010). İşletmelerde işgören bulma ve seçme
aşamaları. Journal of Naval Science and Engineering, 6 (1): 79-93.
de Miranda Mota, C. M., de Almeida, A. T. ve Alencar, L. H. (2009). A
multiple criteria decision model for assigning priorities to activities in project
management. International Journal of Project Management, 27 (2): 175-181.
Gider, S. (2015). İşe alım sürecinde kişilik envanteri kullanımının doğru
personel seçimindeki rolü üzerine bir araştırma. Yayımlanmamış Yüksek Lisans
Tezi. Beykent Üniversitesi, Sosyal Bilimler Enstitüsü, İstanbul.
Gürol, Y., Paksoy, H. M., Öge, S. ve Karacaoğlu, K. (2013). İş gören
temini ve seçimi. O. Erdil ve H. Özkutlu (Der.) İnsan Kaynakları yönetimi: İçinde
167-195. İstanbul: Lisans yayıncılık.
Heizer, J. ve Render, B. (2001). Operations management and principles of
operations management. 6. Baskı. New Jersey: Prentice Hall.
Holley, W. H. ve Jennings, K. M. (1987). Personnel human resources
management contrubutions and activities. 2. Baskı. Chicago: Dreyden.International Organization for Standardization. “Quality management
systems - Guidelines for quality management in projects”,
https://www.iso.org/obp/ui/#iso:std:iso:10006:ed-2:v1:en:term:3.5, (05.05.2015).
Jensen, C. A. (1994). Effective project planning techniques. Civil
Engineering-ASCE, 64 (2): 66-67.
Kelemenis, A. ve Askounis, D. (2010). A new TOPSIS-based multi-criteria
approach to personnel selection. Expert Systems with Applications, 37 (7): 4999-
5008.
Koyuncu, O. ve Özcan, M. (2014). Personel seçim sürecinde analitik
hiyerarşi süreci ve TOPSIS yöntemlerinin karşılaştırılması: Otomotiv sektöründe
bir uygulama. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Dergisi, 32 (2):
195-218.
Kutlu, N. T. (2001). Proje planlama teknikleri ve PERT tekniğinin inşaat
sektöründe uygulanması üzerine bir çalışma. Dokuz Eylül Üniversitesi Sosyal
Bilimler Fakültesi Dergisi, 3 (2): 164-193.
Küçükkaya, G. (2006). İnsan kaynakları yönetiminde personel seçimi ve
bir uygulama. Yayımlanmamış Yüksek Lisans Tezi. Marmara Üniversitesi, Sosyal
Bilimler Enstitüsü, İstanbul.
Kwiesielewicz, M. ve van Uden, E. (2004). Inconsistent and contradictory
judgements in pairwise comparison method in the AHP. Computers & Operations
Research, 31 (5): 713-719.
Liang, W. Y. (2003). The analytic hierarchy process in project evaluation:
An R&D case study in Taiwan. Benchmarking: An International Journal, 10 (5):
445-456.
Lijuan, C. ve Shinan, C. (2011). An approach of AHP for human factors
analysis in the aircraft icing accident. Procedia engineering, 17: 63-69.
Lin, Z. C. ve Yang, C. B. (1996). Evaluation of machine selection by the
AHP method. Journal of Materials Processing Technology, 57 (3): 253-258.
Marasovic, J. ve Marasovic, T. (2006). CPM/PERT project planning
methods as e-learning optional support. International Conference on IEEE 2006:
Software in Telecommunications and Computer Networks. 31 Eylül-1 Ekim 2006,
Crotia, Hırvatistan.
Mohan, S., Gopalakrishnan, M., Balasubramanian, H. ve Chandrashekar,
C. (2007). A Lognormal approximation of activity duration in PERT using two
time estimates. The Journal of The Operation Research Society, 58 (6): 827-831.
Monks, J. G. (1996). Schaum’s outline of theory and problems of
operations management. 2. Baskı, USA: McGraw-Hill Inc.Morales-Sánchez, V., Hernández-Mendo, A., Sánchez-Algarra, P., Blanco-
Villaseñor, Á., ve Anguera-Argilaga, M. T. (2009). Random PERT: Application to
physical activity/sports programs. Quality & Quantity, 43 (2): 225-236.
Mouhoub, N. E., Benhocine, A. ve Belouadah, H. (2011). A New method
for constructing a minimal PERT network. Applied Mathematical Modelling, 35
(9): 4575-4588.
Munns, A. K. ve Bjeirmi, B. F. (1996). The role of project management in
achieving project success. International Journal of Project Management, 14 (2):
81-87.
Özbek, A. (2014). Yöneticilerin çok kriterli karar verme yöntemleri ile
belirlenmesi. Yönetim ve Ekonomi Araştırmaları Dergisi, (24): 209-225.
Öztürk, A. (2007). Yöneylem araştırması. 11. Baskı. Bursa: Ekin Kitabevi.
Saaty, T. L. (1994). How to make a decision: The analytic hierarchy
process. Interfaces,24 (6): 19-43.
Schmidt, F. L. ve Hunter, J. E. (1998). The validity and utility of selection
methods in personnel psychology: Practical and theoretical implications of 85 years
of research findings. Psychological bulletin, 124 (2), 262-274.
Sipahi, S. ve Timor, M. (2010). The analytic hierarchy process and analytic
network process: An overview of applications. Management Decision, 48 (5): 775-
808.
Solmuş, T. (2003). Personel seçim sürecinde mülakat tekniği. İş Güç
Endüstri İlişkileri ve İnsan Kaynakları Dergisi, 5 (2).
Temel, M. (2011). Proje yönetim teknikleri ve kara salyangozu üretim
çiftliği projesi üzerine bir uygulama. Yayınlanmamış Yüksek Lisans Tezi. Çukurova
Üniversitesi, Sosyal Bilimler Enstitüsü, Adana.
Temiz, N. ve Tecim, V. (2009a). Spatial multi criteria decision making in
forest fire fighting planning. Endüstri Mühendisliği Dergisi, 20 (2): 15-30.
Temiz, N. ve Tecim, V. (2009b). The use of GIS and multi-criteria
decision making as a decision tool in forestry, OR Insight, 22 (2): 105-123.
Tepe, S. ve Görener, A. (2014). Analitik hiyerarşi süreci ve moora
yöntemlerinin personel seçiminde uygulanması. İstanbul Ticaret Üniversitesi Fen
Bilimleri Dergisi,13 (25): 1-14.
Vaidya, O. S. ve Kumar, S. (2006). Analytic hierarchy process: An
overview of applications. European Journal of Operational Research, 169 (1): 1-
29.Wang, D. (2009). Extension of TOPSIS method for R&D personnel
selection problem with interval grey number. International Conference on IEEE
2009: Management and Service Science, 20-22 Eylül 2009.
Yüksel, Ö. (2004). İnsan kaynakları yönetimi. Ankara: Gazi Kitabevi.
Thank you for copying data from http://www.arastirmax.com