This paper analyzes the feasibility of Bolu Mountain Tunnel which is one of the most costly highway projects in Turkey. The project continued for about seventeen years and opened to use in 2007. Internal Rate of Return concept is used as a decision rule to asses the net benefit stream of the project. As the tunnel construction had not finished at the deadline planned by the earliest project appraisal, the necessity of tunnel construction became controversial among the society as it requires high investment costs which are withdrawn from other resources of the economy. The analysis is conducted for a 50 year period. According to the results, Bolu Mountain Tunnel project is not economically feasible since the Net Present Value of the project is highly negative at % 12 discount rate level. The NPV and IRR figures are recalculated under different scenarios but even in the best case the figures are negative.
1279 - 1287

REFERENCES

References: 

Adler, A. H.(1975) Ulaştirma Projelerinin Ekonomik Değerlendirilmesi
Örnek Etüdleri. Translated by Cahit Yalgın. General Directorate of
Highways Publications, Ankara.
Anguera, R. (2006) The Channel Tunnel--an ex post economic evaluation.
Transportation Research Part A: Policy and Practice, Volume 40,
Issue 4, 291-315.
Boadway, R. (2006) Principles of cost-benefit analysis. Public Policy Review.
Vol.2, No.1.
Cakır, T. (1999) Türkiye’de Kamu Ekonomisince Üretilen Karayolları
Hizmetlerinde Fayda-Maliyet Analizi Tekniğinin Uygulanabilirliği.
Anadolu Üniversitesi Yayınları, Eskişehir.
Adler, M. D. and Posner, A., E. (1999) Rethinking cost-benefit analysis.
The Yale Law Journal. No.109.
Ellerman, D. (2004) On a difficulty in welfare economics: numeraire
illusion in the Marshall-Pigou-Kaldor-Hicks methodology. University
of California at Riverside Working Paper.
Florio, M. and Vignetti, S. (2003) Cost-Benefit Analysis of Infrastructure
Projects in an Enlarged European Union: An Incentive-Oriented
Approach.
Fosgerau, M. and Pilegaard, N. (2007) Cost-Benefit Rules for Transport
Projects When Labor Supply is Endogenous and Taxes are Distortionary.
MPRA.
GDHa, (2009) 2009Yılı Otoyollar Bakim-Işletme ve Ücret Toplama
Maliyetleri, Ulaşım ve Maliyet Etüdleri Şubesi Müdürlüğü, http://
www.kgm.gov.tr/SiteCollectionDocuments/KGMdocuments/Istatistikler/
YapimBakimIsletmeMaliyet/2008%20Yılı%20Otoyollar%20
Bakım%20-%20İşletme%20ve%20Ücret%20Toplama%20Maliyetleri%
20.pdf,08.07.2010
REFERENCES
1. This paper is a revised and updated version of the first author’s master
dissertation at Izmir University of Economics with the supervision
of Prof. Dr. İsmail Bulmuş. We are grateful to Prof. Dr. İsmail
Bulmuş for his comments and suggestions on the earlier versions of
this paper. Needless to say, the errors and omissions are solely the
authors’ responsibility.
END NOTES
1287
Gaye KOCABAŞ, Barış Serkan KOPURLU
GDH (2010), http://www.kgm.gov.tr/SiteCollectionDocuments/KGMdocuments/
Istatistikler/YapimBakimIsletmeMaliyet/otoyolmaliyet2009.
pdf, 15.07.2010
GDH (2008), http://www.kgm.gov.tr/kaza2k.doc, 21.07.2008
GDHb, ( 2010) 2009 Trafik ve Ulaşim Bilgileri: Otoyollar ve Devlet
Yollarinin Trafik Dilimlerine Göre Yillik Ortalama Günlük Trafik
Değerleri ve Ulaşim Bilgileri, Strateji Geliştirme Daire Başkanliği
Ulaşim ve Maliyet Etütleri Şubesi Müdürlüğü, http://www.kgm.gov.
tr/SiteCollectionDocuments/KGMdocuments/Istatistikler/Trafikve
UlasimBilgileri/09TrafikUlasimBilgileri.pdf 15.07.2010 http://www.
kgm.gov.tr/Sayfalar/KGM/SiteTr/Istatistikler/TrafikUlasimBilgileri.
aspx, 15.07.2010
GDHc, Karayolları Genel Müdürlüğü Stratejik Planlama Şubesi
Müdürlüğü.(2007) Karayolu Planlaması Bilgileri El Kitabı. (GDH,
Department of Strategic Planning: Handbook for Motorway Planning).
GDH, Karayolları Genel Müdürlüğü. (2006) Anadolu Otoyolu
Gümüşova-Gerede Kesimi İnşaat Kontrolu Mühendislik Hizmetleri
İş İlerleme Raporu, Yüksel Proje.
Heinzerling, L. and Ackerman, F. (2002) Pricing the priceless: Cost-Benefit
analysis of environmental protection. Georgetown Environmental
Law and Policy Institute.
Hensher, D. A., Rose, J. M., Ortuzar, J. and Rizzi, L. I. Estimating the
willingness to pay and value of risk reduction for car occupants in the
road environment. Transportation Research Part A: Policy and Practice,
In Press, Corrected Proof (www.sciencedirect.com/science/article/
B6VG7-4WP4BF4-1/2/f0c5f0a1b3d2c7b9b5204e1bcd16d2f5).
Jiang, M., Morikawa, T. (2004) Theoretical analysis on the variation of
value of travel time savings, Transportation Research Part A: Policy and
Practice, Volume 38, Issue 8, 551-571.
Kula, E. (2006) The social discount rate in cost-benefit analysis: the British
experience and lessons to be learned. Milan European Economy
Workshops Working Paper.
Lundholm, M. (2005) Cost – Benefit analysis and the marginal cost of
public funds. Department of Economics, Stockholm University.
Lyons, G., Jain, J. and Holley, D. (2007) The use of travel time by rail
passengers in Great Britain, Transportation Research Part A: Policy and
Practice, Volume 41, Issue 1, 107-120
Mishan, E.J.(1975) Cost-Benefit Analysis; An Informal Introduction,
2nd edit, Gresham Press, London.
Murty, M.N., Dhavala, K. K, Ghosh, M. and Singh, R.(October,2006)
Social cost-benefit analysis of Delphi Metro. MPRA, No.1658
Nas, T. (1996) Cost Benefit Analysis Theory and Application. Sage Publications,
California. p.57
Nijkamp, P., Ubbels B. and Verhoef, E. (2002) Transport investment
appraisal and the environment. Tinbergen Institute Dsicussion Paper.
OIM, Benefit Cost Analysis for Transportation Projects, Mn/DOT Benefit
Cost Analysis Guidance (June 2005) (http://www.oim.dot.state.
mn.us/EASS/, 20/07/2008).
Ozkan, N. (2000) Refinement of benefit cost analysis results for highway
projects. Ph.D Thesis, METU Department of Civil Engineering.
p:18,63,75,76.
Panayotou, T. (September,2000) Basic concepts and common valuation
errors in cost-benefit analysis. International Development Research Centre.
Ottowa. p: 10.
Proost, S., Van der Loo, S., De Palma A. and Lindsey, R., (2005) A
Cost-Benefit Analysis of tunnel investment and tolling alternatives
in Antwerp. Katholieke University Of Leuven Center For Economic
Studies Working Papers.
Quinet, E. (2006) Transport cost benefit analysis in France: Recent
changes, progress and shortcomings. Milan European Economy
Workshops Working Paper. p:13.
Sugden, R. and Williams, A. (1978) The Principles of Practical Cost-
Benefit Analysis. Oxford University Press, Britain.
Unsal, H. (2004) Kamu hizmetlerinin planlanmasinda fayda-maliyet
analizi ve uygulanabilirliği, (Cost benefit analysis of public services
planning and its applicability). Gazi University Social Sciences Institute
Journal, No:1.p:1.
Watkins, T. An introduction to cost benefit analysis. San José State University
Department of Economics, Silicon Valley & Tornado Alley
USA.
Weber, A. T. (2003) An exact relation between willingness to pay and
willingness to accept. Economics Letters.
Weisbrod, E.G. and Beckwith J. (1992) Measuring economic development
benefits for highway decision-making: The Wisconsin Case.
Transportation Quarterly, Vol.46., No.1.
Zerbe, O. R. Ethical benefit-cost analysis. The Evans School of Public
Affairs and The Law School, The University of Washington.

Thank you for copying data from http://www.arastirmax.com